ROADWORKS SUMMARY
Edgcumbe Gardens, NEWQUAY, TR7 2QD
Introduction
View current and future planned roadworks and road closures for Edgcumbe Gardens, TR7 2QD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Edgcumbe Gardens, NEWQUAY, TR7 2QD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Edgcumbe Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Sep 2024 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on A3075 Between Junction At High Lanes To Trevemper Bridge, Trevemper, Newquay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cornwall Council on 21 May 2024 at 05:50.
30 Sep 2024 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on A392 Between Trevemper Road And Superstore Roundabout, Trevemper, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 31 January 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cornwall Council on 16 Nov 2023 at 10:06.
31 Jan 2025
Cornwall Council are carrying out Highway repair and maintenance works on A392 Between Trevemper Road And Superstore Roundabout, Trevemper, Newquay.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 09:00 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 30 Sep 2024 at 11:54.
Tomorrow
Wales And West Utilities are carrying out Utility repair and maintenance works on Fernhill Road, Newquay.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 09:00 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 15 Nov 2024 at 09:56.
10 Jan 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Alexandra Road, Newquay.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 10:20 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 18 Nov 2024 at 10:23.
Friday
Wales And West Utilities are carrying out Utility repair and maintenance works on Alexandra Road, Newquay.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 December 2024 at 21:20 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 17 Dec 2024 at 14:01.
Friday
South West Water are proposing to carry out Utility repair and maintenance works on Mount Wise, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 26 Nov 2024 at 13:55.
Friday
South West Water are carrying out Utility repair and maintenance works on Mount Wise, Newquay.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 18:45 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 17 Dec 2024 at 08:05.
2 Jan and 10 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Crantock Street, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 08:53.
2 Jan and 10 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Crantock Street, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 14:38.
2 Jan and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Gover Lane, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 2 Sep 2024 at 08:38.
2 Jan and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Gover Lane, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 2 Sep 2024 at 12:18.
2 Jan and 27 Mar 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Narrowcliff, Newquay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cornwall Council on 15 Aug 2024 at 08:22.
2 Jan and 27 Mar 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Narrowcliff, Newquay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cornwall Council on 2 Dec 2024 at 10:48.
6 Jan and 14 Feb 2025
Cornwall Council are proposing to carry out roadworks on Quintrell Road, Newquay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 7 Oct 2024 at 09:47.
6 Jan and 28 Feb 2025
Cornwall Council are proposing to carry out Highway improvement works on Road From Quintrell Road To Junction North Of Manuels Farm, Chapel, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cornwall Council on 10 Dec 2024 at 09:15.
6 Jan and 28 Feb 2025
Cornwall Council are proposing to carry out Highway improvement works on Road From Quintrell Road To Junction North Of Manuels Farm, Chapel, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Oct 2024 at 09:03.
8 and 10 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Vosporth Road, Crantock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South West Water on 29 Nov 2024 at 06:46.
8 and 10 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Vosporth Road, Crantock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South West Water on 4 Oct 2024 at 11:48.
14 and 17 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on A392 From East Road To Mountjoy, Quintrell Downs.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 13:23.
14 and 17 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on A392 From Whitecross To Newquay Road, Whitecross, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 13:23.
14 and 17 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on A392 From Mountjoy To Whitecross, Mountjoy, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 13:23.
14 and 17 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on East Road, Quintrell Downs.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 12:04.
16 and 18 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on A392 From Park An Dre Roundabout To West Road, Lane, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 13:25.
16 and 18 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on West Road, Quintrell Downs.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 13:26.
20 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction South Of Trevella Cottage To Junction South Of Trevemper, Crantock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 29 Oct 2024 at 13:21.
20 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From The A3075 East Of Penhallow Cottage To The A3075 South Of Penhallow, Trevemper, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 29 Oct 2024 at 13:20.
20 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Halwyn Road To Junction South East Of Fair Breeze, Crantock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 29 Oct 2024 at 13:21.
20 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Halwyn Road, Crantock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 29 Oct 2024 at 13:21.
3 and 28 Feb 2025
Cornwall Council are proposing to carry out Highway improvement works on Halwyn Road, Crantock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 22 Nov 2024 at 14:07.
3 Feb and 31 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Johns Road, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 08:53.
3 Feb and 31 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Johns Road, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 14:38.
3 and 28 Feb 2025
Cornwall Council are proposing to carry out Section 50 on Halwyn Road, Crantock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 22 Nov 2024 at 11:42.
3 and 28 Feb 2025
Cornwall Council are proposing to carry out Section 50 on Halwyn Road, Crantock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 22 Nov 2024 at 14:07.
3 and 28 Feb 2025
Cornwall Council are proposing to carry out Highway improvement works on Halwyn Road, Crantock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 22 Nov 2024 at 11:38.
10 and 15 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From The B3276 Between Trevarrian Hill And Tregurrian Hill To New Road, Trevarrian, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 19 Nov 2024 at 08:42.
10 and 15 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on New Road, Carloggas, St Mawgan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 19 Nov 2024 at 08:42.
10 and 13 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Crescent Lane, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 4 Nov 2024 at 14:29.
10 and 13 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Crescent Lane, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 4 Nov 2024 at 09:41.
24 Feb and 24 Mar 2025
Cornwall Council are proposing to carry out Highway improvement works on Fairview Terrace, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 28 Nov 2024 at 06:01.
24 Feb and 24 Mar 2025
Cornwall Council are proposing to carry out Highway improvement works on Carclew Avenue, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 28 Nov 2024 at 06:01.
3 and 14 Mar 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on West Pentire Road, Crantock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 22 Oct 2024 at 12:04.
3 and 7 Mar 2025
Cornwall Council were proposing to carry out Highway repair and maintenance works on A392 From Whitecross To Newquay Road, Whitecross, Newquay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 11:49.
3 and 7 Mar 2025
Cornwall Council were proposing to carry out Highway repair and maintenance works on East Road, Quintrell Downs.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 11:47.
3 and 14 Mar 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Halwyn Road, Crantock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 22 Oct 2024 at 12:04.
3 and 7 Mar 2025
Cornwall Council were proposing to carry out Highway repair and maintenance works on A392 From East Road To Mountjoy, Quintrell Downs.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 11:48.
3 and 7 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on Mount Wise, Newquay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by South West Water on 26 Nov 2024 at 10:56.
3 and 7 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on Mount Wise, Newquay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by South West Water on 22 Nov 2024 at 12:13.
3 and 7 Mar 2025
Cornwall Council were proposing to carry out Highway repair and maintenance works on A392 From Mountjoy To Whitecross, Mountjoy, Newquay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 11:48.
6 and 8 Mar 2025
Cornwall Council were proposing to carry out Highway repair and maintenance works on A392 From Park An Dre Roundabout To West Road, Lane, Newquay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 March 2025 and run through until 8 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 12:46.
6 and 8 Mar 2025
Cornwall Council were proposing to carry out Highway repair and maintenance works on West Road, Quintrell Downs.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 March 2025 and run through until 8 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 17 Dec 2024 at 12:47.
10 and 14 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on Porth Bean Road, Newquay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 29 Nov 2024 at 12:15.
10 and 14 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on Porth Bean Road, Newquay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 2 Dec 2024 at 09:04.
17 and 31 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Mount Wise, Newquay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 14:38.
17 and 31 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Mount Wise, Newquay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 08:56.
Roadworks Map near to Edgcumbe Gardens, NEWQUAY, TR7 2QD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Edgcumbe Gardens, NEWQUAY, TR7 2QD (25 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 Apr 2024 - 30 Apr 2025)
(Scheduled: 31 Jul 2024 - 14 Feb 2025)
(Scheduled: 19 Jan 2024 - 28 Mar 2025)
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.