ROADWORKS SUMMARY
The Quay, ST. AGNES, TR5 0RU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Quay, TR5 0RU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Quay, ST. AGNES, TR5 0RU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Quay are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cornwall Council logo
Until
17 Jun 2025
Details
View Map
Share
Follow
Forge

Cornwall Council are carrying out Highway repair and maintenance works on Forge, Mawla.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 11:30 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 28 May 2025 at 12:56.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Wheal Music To Short Cross Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Wheal Music To Short Cross Road, Mount Hawke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:22.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Bridge Farm To Terrigal

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Bridge Farm To Terrigal, Skinners Bottom, Redruth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:23.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Blackbirds Cottage To Junction At Snowdrop Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Blackbirds Cottage To Junction At Snowdrop Cottage, Blackwater.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:30.

BT logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Forge

BT were proposing to carry out Utility asset works on Forge, Mawla.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 2 Apr 2025 at 09:33.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Junction At Meadowside To Cledma

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction At Meadowside To Cledma, Blackwater.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:24.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Roundabout At The A3047 And A30 Slip To Blackbirds Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Roundabout At The A3047 And A30 Slip To Blackbirds Cottage, Scorrier.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:29.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Road From Junction At Meadowside To Cledma

Cornwall Council were proposing to carry out Highway repair and maintenance works on Road From Junction At Meadowside To Cledma, Blackwater.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 14 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 13:03.

BT logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Road From Mawla Well Junction To Mawla Turn

BT were proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 2 Apr 2025 at 09:31.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Grove Farm To Junction At Meadowside

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Grove Farm To Junction At Meadowside, East Hill, Blackwater.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:31.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Terrigal To Chatmar Pet Hotel

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Terrigal To Chatmar Pet Hotel, Goonearl, Scorrier.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:23.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Homeleigh To Grove Farm

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Homeleigh To Grove Farm, Blackwater.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:29.

BT logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Mile Hill

BT were proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 2 Apr 2025 at 09:25.

Cornwall Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Halt Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Halt Road, Goonhavern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 8 May 2025 at 14:46.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
B3285 Between Budnic Hill And Newquay Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3285 Between Budnic Hill And Newquay Road, Rose.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:25.

BT logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Higher North Country

BT were proposing to carry out Utility asset works on Higher North Country, Redruth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 2 Apr 2025 at 09:35.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
B3285 From Junction West Of Trebarthen Terrace To Newquay Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3285 From Junction West Of Trebarthen Terrace To Newquay Road, Rosehill, Goonhavern.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:24.

Western Power Distribution (South West) logo
Finishing
Thursday
Details
View Map
Share
Follow
Road From Penwartha Road To The B3284 Junction West Of Penwortha

Western Power Distribution (South West) are proposing to carry out Utility asset works on Road From Penwartha Road To The B3284 Junction West Of Penwortha, Penwartha.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Feb 2025 at 11:53.

Western Power Distribution (South West) logo
Finishing
Thursday
Details
View Map
Share
Follow
Road From Penwartha Road To The B3284 Junction West Of Penwortha

Western Power Distribution (South West) are proposing to carry out Utility asset works on Road From Penwartha Road To The B3284 Junction West Of Penwortha, Penwartha.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 26 Feb 2025 at 11:28.

South West Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Mill Road

South West Water were proposing to carry out Utility repair and maintenance works on Mill Road, Bolingey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 26 Mar 2025 at 11:12.

South West Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Penwartha Road

South West Water were proposing to carry out Utility repair and maintenance works on Penwartha Road, Bolingey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 26 Mar 2025 at 11:14.

South West Water logo
Between
25 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Mill Road

South West Water are proposing to carry out Utility repair and maintenance works on Mill Road, Bolingey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 27 Mar 2025 at 09:43.

South West Water logo
Between
25 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Mill Road

South West Water are proposing to carry out Utility repair and maintenance works on Mill Road, Bolingey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 22 May 2025 at 13:03.

South West Water logo
Between
25 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Penwartha Road

South West Water are proposing to carry out Utility repair and maintenance works on Penwartha Road, Bolingey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 27 Mar 2025 at 09:43.

South West Water logo
Between
25 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Penwartha Road

South West Water are proposing to carry out Utility repair and maintenance works on Penwartha Road, Bolingey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 22 May 2025 at 13:03.

South West Water logo
Between
26 and 30 Jun 2025
Details
View Map
Share
Follow
Nancekuke

South West Water are proposing to carry out Utility repair and maintenance works on Nancekuke, Redruth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 25 Mar 2025 at 11:48.

South West Water logo
Between
26 and 30 Jun 2025
Details
View Map
Share
Follow
Nancekuke

South West Water are proposing to carry out Utility repair and maintenance works on Nancekuke, Redruth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 29 May 2025 at 09:25.

Western Power Distribution (South West) logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Road From Junction At Sawmills Cottage To Junction East Of Black Dogs Shaft

Western Power Distribution (South West) are proposing to carry out Utility asset works on Road From Junction At Sawmills Cottage To Junction East Of Black Dogs Shaft, Wheal Busy, Chacewater.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 8 Apr 2025 at 12:37.

Western Power Distribution (South West) logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Road From Junction At Sawmills Cottage To Junction East Of Black Dogs Shaft

Western Power Distribution (South West) are proposing to carry out Utility asset works on Road From Junction At Sawmills Cottage To Junction East Of Black Dogs Shaft, Wheal Busy, Chacewater.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 25 Mar 2025 at 13:05.

Cornwall Council logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Road From Junction At Fernleigh To Junction South East Of Millstream Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction At Fernleigh To Junction South East Of Millstream Cottage, Manor Parsley, Mount Hawke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 6 May 2025 at 11:59.

Cornwall Council logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Road From Coast Road To Junction At Fernleigh

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Coast Road To Junction At Fernleigh, Mount Hawke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 6 May 2025 at 11:59.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Mile Hill

BT were proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 15 Apr 2025 at 13:57.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Mile Hill

BT were proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 29 Apr 2025 at 15:46.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Follow
Mile Hill

BT are proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 May 2025 at 10:19.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Higher North Country

BT were proposing to carry out Utility asset works on Higher North Country, Redruth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 2 Apr 2025 at 11:42.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Follow
Higher North Country

BT are proposing to carry out Utility asset works on Higher North Country, Redruth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 May 2025 at 10:18.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Higher North Country

BT were proposing to carry out Utility asset works on Higher North Country, Redruth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 30 Apr 2025 at 16:27.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Follow
Higher North Country

BT are proposing to carry out Utility asset works on Higher North Country, Redruth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 May 2025 at 15:21.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Follow
Forge

BT are proposing to carry out Utility asset works on Forge, Mawla.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 May 2025 at 15:23.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Forge

BT were proposing to carry out Utility asset works on Forge, Mawla.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 30 Apr 2025 at 16:24.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Follow
Forge

BT are proposing to carry out Utility asset works on Forge, Mawla.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 May 2025 at 10:18.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Forge

BT were proposing to carry out Utility asset works on Forge, Mawla.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 2 Apr 2025 at 11:40.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Forge

BT were proposing to carry out Utility asset works on Forge, Mawla.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 15 Apr 2025 at 13:59.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Follow
Road From Mawla Well Junction To Mawla Turn

BT are proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 May 2025 at 15:18.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Follow
Road From Mawla Well Junction To Mawla Turn

BT are proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 May 2025 at 10:17.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Road From Mawla Well Junction To Mawla Turn

BT were proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 30 Apr 2025 at 16:22.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Road From Mawla Well Junction To Mawla Turn

BT were proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 15 Apr 2025 at 13:58.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Road From Mawla Well Junction To Mawla Turn

BT were proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 2 Apr 2025 at 11:40.

Cornwall Council logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Road From Junction South West Of Hawthorn Cottage To Ivy Chimney Villa

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction South West Of Hawthorn Cottage To Ivy Chimney Villa, Wheal Rose, Scorrier.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 6 May 2025 at 12:00.

BT logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Follow
Mile Hill

BT are proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 May 2025 at 07:20.

Cornwall Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Short Cross Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Short Cross Road, Mount Hawke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 7 May 2025 at 11:13.

Cornwall Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Church Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Church Road, Mount Hawke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 7 May 2025 at 11:13.

Cornwall Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Road From Church Road To Two Burrows

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Church Road To Two Burrows, The Halt, Mount Hawke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 7 May 2025 at 11:14.

Cornwall Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Road From Kenmare To Short Cross Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Kenmare To Short Cross Road, Short Cross, Mount Hawke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 7 May 2025 at 11:13.

Cornwall Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Road From Wheal Music To Short Cross Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Wheal Music To Short Cross Road, Mount Hawke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 7 May 2025 at 11:12.

Cornwall Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Road From Oakdene To Kenmere

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Oakdene To Kenmere, Menagissey, Mount Hawke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 7 May 2025 at 11:12.

Cornwall Council logo
Between
3 and 17 Aug 2025
Details
View Map
Share
Follow
Road From Whitehall Cottages Junction To House Zimapan

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Whitehall Cottages Junction To House Zimapan, Scorrier.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 20 May 2025 at 14:15.

Cornwall Council logo
Between
3 and 17 Aug 2025
Details
View Map
Share
Follow
B3298 Between Tregullow And Tolgullow

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3298 Between Tregullow And Tolgullow, Tregullow, Scorrier.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 20 May 2025 at 14:16.


Roadworks Map near to The Quay, ST. AGNES, TR5 0RU (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 08:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Quay, ST. AGNES, TR5 0RU (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.