ROADWORKS SUMMARY
Nanturras Parc, PENZANCE, TR20 9HP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Nanturras Parc, TR20 9HP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Nanturras Parc, PENZANCE, TR20 9HP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Nanturras Parc are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cornwall Council logo
LONG TERM
Until
11 Jul 2025
Details
View Map
Share
Follow
St Clare Street

Cornwall Council are carrying out Highway repair and maintenance works on St Clare Street, Penzance.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:30 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 28 May 2025 at 13:01.

Cornwall Council logo
LONG TERM
Between
6 Jan and 4 Jul 2025
Details
View Map
Share
Follow
St Clare Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on St Clare Street, Penzance.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cornwall Council on 11 Dec 2024 at 15:50.

Cornwall Council logo
LONG TERM
Between
6 Jan and 4 Jul 2025
Details
View Map
Share
Follow
St Clare Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on St Clare Street, Penzance.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cornwall Council on 26 Sep 2024 at 15:13.

Western Power Distribution (South West) logo
LONG TERM
Between
10 Feb and 14 Oct 2025
Details
View Map
Share
Prospect Place

Western Power Distribution (South West) were proposing to carry out Utility asset works on Prospect Place, Hayle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 10 Jan 2025 at 11:12.

Western Power Distribution (South West) logo
LONG TERM
Between
10 Feb and 14 Oct 2025
Details
View Map
Share
Prospect Place

Western Power Distribution (South West) were proposing to carry out Utility asset works on Prospect Place, Hayle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 16 Dec 2024 at 10:48.

Western Power Distribution (South West) logo
LONG TERM
Between
10 Feb and 14 Oct 2025
Details
View Map
Share
Chapel Lane

Western Power Distribution (South West) were proposing to carry out Utility asset works on Chapel Lane, Hayle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 16 Dec 2024 at 10:48.

Cornwall Council logo
LONG TERM
Between
21 Mar 2025 and 21 Mar 2026
Details
View Map
Share
Follow
Coinagehall Street

Cornwall Council are proposing to carry out Highway improvement works on Coinagehall Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 21 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 11:09.

Cornwall Council logo
LONG TERM
Until
21 Mar 2026
Details
View Map
Share
Follow
Coinagehall Street

Cornwall Council are carrying out Highway improvement works on Coinagehall Street, Penzance.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 07:30 and could run through until 21 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 27 Mar 2025 at 08:23.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Follow
Trevassack Hill

Electricity Network Company are carrying out Utility asset works on Trevassack Hill, Hayle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 12 May 2025 at 09:41.

Electricity Network Company logo
Finishing
Friday
Details
View Map
Share
Trevassack Hill

Electricity Network Company were proposing to carry out Utility asset works on Trevassack Hill, Hayle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 21 Feb 2025 at 12:26.

Electricity Network Company logo
LONG TERM
Between
12 May and 20 Jun 2025
Details
View Map
Share
Follow
Trevassack Hill

Electricity Network Company are proposing to carry out Utility asset works on Trevassack Hill, Hayle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Mar 2025 at 11:28.

Finishing
Tomorrow
Details
View Map
Share
Follow
Green Lane

Wildanet are carrying out Statutory Infrastructure Works on Green Lane, Marazion.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 09:30 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 29 May 2025 at 10:10.

Finishing
Tomorrow
Details
View Map
Share
Follow
Green Lane

Wildanet are proposing to carry out Statutory Infrastructure Works on Green Lane, Marazion.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 10:30.

Western Power Distribution (South West) logo
Finishing
Friday
Details
View Map
Share
Follow
Penwith Street

Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Penwith Street, Penzance.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 01:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 2 Jun 2025 at 10:28.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
Clarence Street

Cornwall Council are carrying out Highway improvement works on Clarence Street, Penzance.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 19:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 3 Jun 2025 at 07:54.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Viaduct Hill

Cornwall Council are proposing to carry out Highway repair and maintenance works on Viaduct Hill, Hayle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Mar 2025 at 11:37.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
High Lanes

Cornwall Council are proposing to carry out Highway repair and maintenance works on High Lanes, Hayle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Mar 2025 at 11:37.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
St Georges Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on St Georges Road, Hayle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Mar 2025 at 11:38.

Western Power Distribution (South West) logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Chapel Lane

Western Power Distribution (South West) were proposing to carry out Utility asset works on Chapel Lane, Hayle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 17 Mar 2025 at 09:52.

South West Water logo
Finishing
Friday
Details
View Map
Share
Follow
Chapel Hill

South West Water are carrying out Utility repair and maintenance works on Chapel Hill, St Erth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:39 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 2 Jun 2025 at 09:55.

South West Water logo
Finishing
Friday
Details
View Map
Share
Follow
Chapel Hill

South West Water are proposing to carry out Utility repair and maintenance works on Chapel Hill, St Erth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 4 Mar 2025 at 11:16.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
Taroveor Road

Cornwall Council are proposing to carry out Highway improvement works on Taroveor Road, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 7 Feb 2025 at 13:48.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
St Clare Street

Cornwall Council are proposing to carry out Highway improvement works on St Clare Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 7 Feb 2025 at 13:48.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
St Clare Street

Cornwall Council are carrying out Highway improvement works on St Clare Street, Penzance.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 19:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 3 Jun 2025 at 07:54.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
Clarence Street

Cornwall Council are proposing to carry out Highway improvement works on Clarence Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 7 Feb 2025 at 13:48.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
Taroveor Road

Cornwall Council are carrying out Highway improvement works on Taroveor Road, Penzance.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 19:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 3 Jun 2025 at 07:54.

Western Power Distribution (South West) logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Prospect Place

Western Power Distribution (South West) were proposing to carry out Utility asset works on Prospect Place, Hayle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 17 Mar 2025 at 09:46.

Finishing
Thursday
Details
View Map
Share
Beacon Road

Wildanet were proposing to carry out Statutory Infrastructure Works on Beacon Road, Marazion.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2025 and run through until 5 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 18 Mar 2025 at 12:07.

Between
5 and 11 Jun 2025
Details
View Map
Share
Follow
Gwallon Lane

Wildanet are proposing to carry out Statutory Infrastructure Works on Gwallon Lane, Marazion.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 11:14.

Electricity Network Company logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Trevassack Hill

Electricity Network Company are proposing to carry out Utility asset works on Trevassack Hill, Hayle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 20 Feb 2025 at 14:48.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Godolphin Bridge

BT are proposing to carry out Utility asset works on Godolphin Bridge, Townshend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 27 May 2025 at 13:13.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Godolphin Bridge

BT are proposing to carry out Utility asset works on Godolphin Bridge, Townshend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 28 Jan 2025 at 14:58.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Trescowe Common

BT are proposing to carry out Utility asset works on Trescowe Common, Germoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 28 Jan 2025 at 14:59.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Trescowe Common

BT are proposing to carry out Utility asset works on Trescowe Common, Germoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 27 May 2025 at 13:04.

Between
10 and 12 Jun 2025
Details
View Map
Share
Foundry Lane

Wildanet were proposing to carry out Utility repair and maintenance works on Foundry Lane, Hayle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wildanet on 26 Mar 2025 at 14:35.

Between
12 and 17 Jun 2025
Details
View Map
Share
Follow
Road From Rospeath Lane To Gwallon Lane

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Rospeath Lane To Gwallon Lane, Gwallon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 11:14.

Western Power Distribution (South West) logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Chapel Lane

Western Power Distribution (South West) were proposing to carry out Utility asset works on Chapel Lane, Hayle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 1 Apr 2025 at 12:55.

South West Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Bread Street

South West Water were proposing to carry out Utility repair and maintenance works on Bread Street, Penzance.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 14 Mar 2025 at 13:35.

Western Power Distribution (South West) logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Prospect Place

Western Power Distribution (South West) were proposing to carry out Utility asset works on Prospect Place, Hayle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 8 Apr 2025 at 12:38.

South West Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Bread Street

South West Water are proposing to carry out Utility repair and maintenance works on Bread Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Mar 2025 at 15:10.

South West Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Bread Street

South West Water are proposing to carry out Utility repair and maintenance works on Bread Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 May 2025 at 15:34.

South West Water logo
LONG TERM
Between
16 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Trevarrack Lane

South West Water are proposing to carry out Utility repair and maintenance works on Trevarrack Lane, Gulval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 15 May 2025 at 10:09.

South West Water logo
LONG TERM
Between
16 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Trevarrack Lane

South West Water are proposing to carry out Utility repair and maintenance works on Trevarrack Lane, Gulval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Mar 2025 at 11:24.

South West Water logo
LONG TERM
Between
16 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Pendrea Road

South West Water are proposing to carry out Utility repair and maintenance works on Pendrea Road, Gulval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 15 May 2025 at 10:11.

South West Water logo
LONG TERM
Between
16 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Pendrea Road

South West Water are proposing to carry out Utility repair and maintenance works on Pendrea Road, Gulval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Mar 2025 at 10:26.

Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Poniou Lane

Wildanet are proposing to carry out Statutory Infrastructure Works on Poniou Lane, Long Rock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 20 May 2025 at 12:16.

Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Foundry Lane

Wildanet are proposing to carry out Utility repair and maintenance works on Foundry Lane, Hayle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wildanet on 28 Apr 2025 at 09:27.

Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Foundry Lane

Wildanet are proposing to carry out Utility repair and maintenance works on Foundry Lane, Hayle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wildanet on 26 Mar 2025 at 16:10.

Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Poniou Lane

Wildanet are proposing to carry out Statutory Infrastructure Works on Poniou Lane, Long Rock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 10:37.

Cornwall Council logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Tyringham Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Tyringham Road, Lelant.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 May 2025 at 12:19.

Cornwall Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Tyringham Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Tyringham Road, Lelant.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Mar 2025 at 15:40.

Cornwall Council logo
LONG TERM
Between
30 Jun and 19 Dec 2025
Details
View Map
Share
Follow
Market Jew Street

Cornwall Council are proposing to carry out Highway improvement works on Market Jew Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 4 Mar 2025 at 12:00.

Cornwall Council logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Godolphin Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Godolphin Road, Long Rock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 3 Jun 2025 at 08:44.

Cornwall Council logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Godolphin Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Godolphin Road, Long Rock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Apr 2025 at 10:55.

Cornwall Council logo
LONG TERM
Between
21 Jul and 28 Nov 2025
Details
View Map
Share
Follow
Market Jew Street

Cornwall Council are proposing to carry out Highway improvement works on Market Jew Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 9 May 2025 at 11:05.

Cornwall Council logo
LONG TERM
Between
21 Jul and 28 Nov 2025
Details
View Map
Share
Follow
Market Place

Cornwall Council are proposing to carry out Highway improvement works on Market Place, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 9 May 2025 at 10:56.

Cornwall Council logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Hatchs Hill

Cornwall Council are proposing to carry out Highway repair and maintenance works on Hatchs Hill, Angarrack.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 9 May 2025 at 10:21.

Wales And West Utilities logo
Between
19 and 22 Aug 2025
Details
View Map
Share
Follow
St Johns Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Johns Street, Hayle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 May 2025 at 10:07.

Between
21 and 27 Aug 2025
Details
View Map
Share
Follow
Road From Popworks Hill To Helnoweth

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Popworks Hill To Helnoweth, Gulval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 27 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 27 May 2025 at 13:26.

Between
26 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Poldown

Wildanet are proposing to carry out Statutory Infrastructure Works on Poldown, Breage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 3 Jun 2025 at 14:36.


Roadworks Map near to Nanturras Parc, PENZANCE, TR20 9HP (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 15:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Nanturras Parc, PENZANCE, TR20 9HP (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South West Water logo
TRESCOWE ROAD 
(0.3 miles)
South West Water
Utility repair and maintenance works - Verge - Some carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.3
Details
Share
Follow
2
Cornwall Council logo
TRESCOWE ROAD 
(0.3 miles)
Cornwall Council
Section 50 - Carriageway, Verge - Two-way signals
Planned
Scheduled: 2 Jun 2025 - 12 Jun 2025
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.