ROADWORKS SUMMARY
Cave Lane, PENZANCE, TR19 6SW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cave Lane, TR19 6SW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cave Lane, PENZANCE, TR19 6SW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cave Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cornwall Council logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
A3071 Between Bosvenning Common Road And Tremethick Cross

Cornwall Council are carrying out Highway improvement works on A3071 Between Bosvenning Common Road And Tremethick Cross, Newbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 10:15 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cornwall Council on 19 Nov 2024 at 14:41.

Cornwall Council logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Bodinnar Lane

Cornwall Council are carrying out Highway improvement works on Bodinnar Lane, Newbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 10:15 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cornwall Council on 19 Nov 2024 at 14:41.

Cornwall Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Coinagehall Street

Cornwall Council are proposing to carry out roadworks on Coinagehall Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 9 Sep 2024 at 11:40.

Cornwall Council logo
Finishing
Tomorrow
Details
View Map
Share
Chywoone Hill

Cornwall Council were proposing to carry out Highway repair and maintenance works on Chywoone Hill, Newlyn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 2 Sep 2024 at 13:44.

Cornwall Council logo
LONG TERM
Until
14 Feb 2025
Details
View Map
Share
Follow
New Road

Cornwall Council are carrying out Highway improvement works on New Road, Newlyn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 18 Nov 2024 at 11:27.

Cornwall Council logo
LONG TERM
Between
18 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Follow
New Road

Cornwall Council are proposing to carry out Highway improvement works on New Road, Newlyn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 10 Sep 2024 at 12:51.

Cornwall Council logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Quay Street

Cornwall Council are proposing to carry out roadworks on Quay Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 9 Sep 2024 at 11:41.

Between
22 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Roscadghill Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Roscadghill Road, Heamoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Nov 2024 at 13:55.

Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Roscadghill Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Roscadghill Road, Heamoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Oct 2024 at 14:47.

South West Water logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
School Lane

South West Water are proposing to carry out Remedial works on School Lane, Marazion.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 25 Oct 2024 at 13:11.

South West Water logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
School Lane

South West Water are proposing to carry out Remedial works on School Lane, Marazion.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 30 Aug 2024 at 10:08.

Western Power Distribution (South West) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Queen Street

Western Power Distribution (South West) are proposing to carry out Utility asset works on Queen Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 30 Oct 2024 at 13:42.

Western Power Distribution (South West) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Queen Street

Western Power Distribution (South West) are proposing to carry out Utility asset works on Queen Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 18 Sep 2024 at 14:50.

Cornwall Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Road From St Johns Terrace To St Michaels Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From St Johns Terrace To St Michaels Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 4 Nov 2024 at 10:20.

Cornwall Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Access To Cemetery And Works From St Johns Terrace

Cornwall Council are proposing to carry out Highway repair and maintenance works on Access To Cemetery And Works From St Johns Terrace, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 10 Sep 2024 at 16:21.

Cornwall Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Access To Cemetery And Works From St Johns Terrace

Cornwall Council are proposing to carry out Highway repair and maintenance works on Access To Cemetery And Works From St Johns Terrace, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 4 Nov 2024 at 12:05.

Cornwall Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Road From St Johns Terrace To St Michaels Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From St Johns Terrace To St Michaels Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 6 Sep 2024 at 13:35.

Wales And West Utilities logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
St Peters Hill

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Peters Hill, Newlyn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 17 Oct 2024 at 12:12.

Wales And West Utilities logo
Between
9 and 13 Dec 2024
Details
View Map
Share
St Peters Hill

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on St Peters Hill, Newlyn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 09:34.

Wales And West Utilities logo
Between
9 and 23 Dec 2024
Details
View Map
Share
St Peters Hill

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on St Peters Hill, Newlyn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 11 Sep 2024 at 09:24.

Wales And West Utilities logo
Between
1 and 6 Jan 2025
Details
View Map
Share
Follow
St Peters Hill

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Peters Hill, Newlyn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 17 Oct 2024 at 11:28.

BT logo
Between
3 and 7 Jan 2025
Details
View Map
Share
Follow
Brook Street

BT are proposing to carry out Utility asset works on Brook Street, Mousehole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Oct 2024 at 16:02.

Wales And West Utilities logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Bread Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bread Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 25 Sep 2024 at 14:54.

Wales And West Utilities logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Bread Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bread Street, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 27 Sep 2024 at 17:58.

Cornwall Council logo
LONG TERM
Between
6 Jan and 4 Jul 2025
Details
View Map
Share
Follow
St Clare Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on St Clare Street, Penzance.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 26 Sep 2024 at 15:13.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Trythogga

BT are proposing to carry out Utility asset works on Trythogga, Gulval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Oct 2024 at 13:48.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Trythogga

BT are proposing to carry out Utility asset works on Trythogga, Gulval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Oct 2024 at 11:14.

South West Water logo
Between
8 and 14 Jan 2025
Details
View Map
Share
Follow
Road From Penare Terrace To Lannoweth Road

South West Water are proposing to carry out Utility repair and maintenance works on Road From Penare Terrace To Lannoweth Road, Penzance.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Oct 2024 at 13:04.

Cornwall Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Chywoone Hill

Cornwall Council are proposing to carry out Highway repair and maintenance works on Chywoone Hill, Newlyn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 6 Sep 2024 at 13:31.

South West Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Old Bridge

South West Water were proposing to carry out Utility repair and maintenance works on Old Bridge, Newlyn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 26 Sep 2024 at 09:36.

Cornwall Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
A3071 Between Bosvenning Common Road And Tremethick Cross

Cornwall Council are proposing to carry out Highway improvement works on A3071 Between Bosvenning Common Road And Tremethick Cross, Newbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Nov 2024 at 15:15.

Cornwall Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
A3071 Between Bosvenning Common Road And Tremethick Cross

Cornwall Council were proposing to carry out Highway improvement works on A3071 Between Bosvenning Common Road And Tremethick Cross, Newbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Nov 2024 at 12:46.

South West Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Chapel Street

South West Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Mousehole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 25 Oct 2024 at 08:13.

Cornwall Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
A3071 Between Tremethick Cross And Mount Misery Roundabout

Cornwall Council are proposing to carry out Highway improvement works on A3071 Between Tremethick Cross And Mount Misery Roundabout, Tremethick Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Nov 2024 at 15:15.

South West Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Road From Lower Grumbla Road To Sancreed Road

South West Water were proposing to carry out Utility repair and maintenance works on Road From Lower Grumbla Road To Sancreed Road, Sancreed.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by South West Water on 14 Nov 2024 at 09:51.

Between
3 and 21 Feb 2025
Details
View Map
Share
Roscadghill Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Roscadghill Road, Heamoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Oct 2024 at 13:35.

Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Castle Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Castle Road, Ludgvan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 24 Oct 2024 at 16:35.

Western Power Distribution (South West) logo
Between
3 and 11 Feb 2025
Details
View Map
Share
Parade Hill

Western Power Distribution (South West) were proposing to carry out New service connection on Parade Hill, Mousehole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 15 Nov 2024 at 10:52.

Western Power Distribution (South West) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Parade Hill

Western Power Distribution (South West) are proposing to carry out New service connection on Parade Hill, Mousehole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 21 Nov 2024 at 13:19.

Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Castle Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Castle Road, Ludgvan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 11 Nov 2024 at 11:25.

South West Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
New Street

South West Water were proposing to carry out Utility repair and maintenance works on New Street, Penzance.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South West Water on 25 Oct 2024 at 08:17.

Cornwall Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Boscathnoe Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on Boscathnoe Lane, Madron.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 9 Oct 2024 at 15:22.

South West Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Bread Street

South West Water were proposing to carry out Remedial works on Bread Street, Penzance.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 14 Nov 2024 at 09:57.

Cornwall Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Lands End Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Lands End Road, St Buryan.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 7 Nov 2024 at 07:59.

Cornwall Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Road From Lesingey Lane To Tremethick Cross

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Lesingey Lane To Tremethick Cross, Tremethick Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 9 Oct 2024 at 15:22.

Cornwall Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Road From Nanseglos Hill To Lesingey Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Nanseglos Hill To Lesingey Lane, Tremethick Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 9 Oct 2024 at 15:21.

Cornwall Council logo
Between
12 and 18 Feb 2025
Details
View Map
Share
Follow
Kenegie Hill

Cornwall Council are proposing to carry out Highway repair and maintenance works on Kenegie Hill, Gulval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Nov 2024 at 15:13.

South West Water logo
LONG TERM
Between
17 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Pendrea Road

South West Water are proposing to carry out Utility repair and maintenance works on Pendrea Road, Gulval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 14 Nov 2024 at 09:49.

South West Water logo
LONG TERM
Between
17 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Trevarrack Lane

South West Water are proposing to carry out Utility repair and maintenance works on Trevarrack Lane, Gulval.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 14 Nov 2024 at 09:56.

South West Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chapel Street

South West Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Mousehole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 14 Nov 2024 at 14:20.


Roadworks Map near to Cave Lane, PENZANCE, TR19 6SW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 21:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cave Lane, PENZANCE, TR19 6SW (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
COMMERCIAL ROAD 
(0.2 miles)
BT
Utility asset works - Carriageway - Give and take
Complete
20 Nov 2024 18:00 - 23:00
0.2
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.