ROADWORKS SUMMARY
Chywoone Hill, PENZANCE, TR18 5AN
Introduction
View current and future planned roadworks and road closures for Chywoone Hill, TR18 5AN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Chywoone Hill, PENZANCE, TR18 5AN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Chywoone Hill are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Tomorrow
Cornwall Council are carrying out Highway improvement works on A3071 Between Bosvenning Common Road And Tremethick Cross, Newbridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 10:15 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cornwall Council on 19 Nov 2024 at 14:41.
Tomorrow
Cornwall Council are carrying out Highway improvement works on Bodinnar Lane, Newbridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 10:15 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cornwall Council on 19 Nov 2024 at 14:41.
28 Oct 2024 and 27 Mar 2025
Cornwall Council are proposing to carry out roadworks on Coinagehall Street, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 27 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cornwall Council on 25 Nov 2024 at 09:05.
18 Nov and 13 Dec 2024
Cornwall Council are proposing to carry out roadworks on Quay Street, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 9 Sep 2024 at 11:41.
14 Feb 2025
Cornwall Council are carrying out Highway improvement works on New Road, Newlyn.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 18 Nov 2024 at 11:27.
18 Nov 2024 and 14 Feb 2025
Cornwall Council are proposing to carry out Highway improvement works on New Road, Newlyn.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 10 Sep 2024 at 12:51.
13 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Roscadghill Road, Heamoor.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 19:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 22 Nov 2024 at 19:06.
2 and 20 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Roscadghill Road, Heamoor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Oct 2024 at 14:47.
Sunday
South West Water are proposing to carry out Remedial works on School Lane, Marazion.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 25 Oct 2024 at 13:11.
Sunday
South West Water are proposing to carry out Remedial works on School Lane, Marazion.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 30 Aug 2024 at 10:08.
9 and 13 Dec 2024
Cornwall Council are proposing to carry out Highway repair and maintenance works on Access To Cemetery And Works From St Johns Terrace, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 10 Sep 2024 at 16:21.
9 and 13 Dec 2024
Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From St Johns Terrace To St Michaels Street, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 4 Nov 2024 at 10:20.
9 and 19 Dec 2024
Western Power Distribution (South West) are proposing to carry out Utility asset works on Queen Street, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 30 Oct 2024 at 13:42.
9 and 19 Dec 2024
Western Power Distribution (South West) are proposing to carry out Utility asset works on Queen Street, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 18 Sep 2024 at 14:50.
9 and 13 Dec 2024
Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From St Johns Terrace To St Michaels Street, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 6 Sep 2024 at 13:35.
9 and 13 Dec 2024
Cornwall Council are proposing to carry out Highway repair and maintenance works on Access To Cemetery And Works From St Johns Terrace, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 4 Nov 2024 at 12:05.
9 and 13 Dec 2024
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Peters Hill, Newlyn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 17 Oct 2024 at 12:12.
9 and 13 Dec 2024
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on St Peters Hill, Newlyn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 09:34.
9 and 23 Dec 2024
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on St Peters Hill, Newlyn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 11 Sep 2024 at 09:24.
1 and 6 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on St Peters Hill, Newlyn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 17 Oct 2024 at 11:28.
3 and 7 Jan 2025
BT are proposing to carry out Utility asset works on Brook Street, Mousehole.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 7 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 24 Oct 2024 at 16:02.
6 Jan and 4 Jul 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on St Clare Street, Penzance.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 4 Dec 2024 at 10:44.
6 and 9 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bread Street, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 25 Sep 2024 at 14:54.
6 and 9 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bread Street, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 27 Sep 2024 at 17:58.
6 Jan and 4 Jul 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on St Clare Street, Penzance.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 26 Sep 2024 at 15:13.
6 and 8 Jan 2025
BT are proposing to carry out Utility asset works on Trythogga, Gulval.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Oct 2024 at 13:48.
6 and 8 Jan 2025
BT are proposing to carry out Utility asset works on Trythogga, Gulval.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Oct 2024 at 11:14.
8 and 14 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Road From Penare Terrace To Lannoweth Road, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 11 Oct 2024 at 13:04.
20 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Chywoone Hill, Newlyn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 3 Dec 2024 at 14:08.
20 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Chywoone Hill, Newlyn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 6 Sep 2024 at 13:31.
20 and 22 Jan 2025
South West Water were proposing to carry out Utility repair and maintenance works on Old Bridge, Newlyn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 26 Sep 2024 at 09:36.
22 and 24 Jan 2025
Wildanet were proposing to carry out Statutory Infrastructure Works on Blowing House Hill, Ludgvan.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Wildanet on 22 Oct 2024 at 12:32.
22 and 24 Jan 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Blowing House Hill, Ludgvan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wildanet on 24 Oct 2024 at 16:25.
27 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway improvement works on A3071 Between Tremethick Cross And Mount Misery Roundabout, Tremethick Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 14 Nov 2024 at 15:15.
27 and 31 Jan 2025
South West Water were proposing to carry out Utility repair and maintenance works on Chapel Street, Mousehole.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 25 Oct 2024 at 08:13.
27 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Bosvenning Common Road, Newbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 14 Nov 2024 at 15:10.
27 and 31 Jan 2025
Cornwall Council were proposing to carry out Highway improvement works on A3071 Between Bosvenning Common Road And Tremethick Cross, Newbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 14 Nov 2024 at 12:46.
27 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway improvement works on A3071 Between Bosvenning Common Road And Tremethick Cross, Newbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 14 Nov 2024 at 15:15.
27 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway improvement works on North Road, Newbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 14 Nov 2024 at 15:14.
27 and 31 Jan 2025
Cornwall Council were proposing to carry out Highway improvement works on North Road, Newbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 13 Nov 2024 at 13:41.
27 and 31 Jan 2025
Cornwall Council were proposing to carry out Highway improvement works on A3071 Between Bosvenning Common Road And Lane To Botrea, Newbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 13 Nov 2024 at 13:38.
27 and 31 Jan 2025
Cornwall Council were proposing to carry out Highway improvement works on A3071 Between Bosvenning Common Road And Lane To Botrea, Newbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 13 Nov 2024 at 13:11.
27 and 31 Jan 2025
Cornwall Council are proposing to carry out Highway improvement works on A3071 Between Bosvenning Common Road And Lane To Botrea, Newbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 14 Nov 2024 at 15:14.
27 and 31 Jan 2025
South West Water were proposing to carry out Utility repair and maintenance works on Road From Lower Grumbla Road To Sancreed Road, Sancreed.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by South West Water on 14 Nov 2024 at 09:51.
28 Jan and 3 Feb 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Road Between Angwinack And Lower Quarter, Vellanoweth, Ludgvan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wildanet on 24 Oct 2024 at 16:23.
28 Jan and 7 Feb 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Road From New Road To Grumbla, St Just.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 14 Nov 2024 at 09:20.
3 and 7 Feb 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Parade Hill, Mousehole.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 21 Nov 2024 at 13:19.
3 and 21 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Roscadghill Road, Heamoor.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Oct 2024 at 13:35.
3 and 11 Feb 2025
Western Power Distribution (South West) were proposing to carry out New service connection on Parade Hill, Mousehole.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 15 Nov 2024 at 10:52.
3 and 5 Feb 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Castle Road, Ludgvan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wildanet on 24 Oct 2024 at 16:35.
4 and 6 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on New Street, Penzance.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by South West Water on 25 Oct 2024 at 08:17.
4 and 6 Feb 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Castle Road, Ludgvan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wildanet on 11 Nov 2024 at 11:25.
5 and 7 Feb 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Tregender Lane, Crowlas.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wildanet on 24 Oct 2024 at 16:26.
10 and 28 Feb 2025
Cornwall Council were proposing to carry out Highway repair and maintenance works on Lands End Road, St Buryan.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 7 Nov 2024 at 07:59.
10 and 21 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Nanseglos Hill To Lesingey Lane, Tremethick Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 9 Oct 2024 at 15:21.
10 and 21 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Lesingey Lane To Tremethick Cross, Tremethick Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 9 Oct 2024 at 15:22.
10 and 14 Feb 2025
South West Water were proposing to carry out Remedial works on Bread Street, Penzance.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 14 Nov 2024 at 09:57.
10 and 21 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Boscathnoe Lane, Madron.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 9 Oct 2024 at 15:22.
12 and 18 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Kenegie Hill, Gulval.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 14 Nov 2024 at 15:13.
17 Feb and 11 Apr 2025
South West Water are proposing to carry out Utility repair and maintenance works on Pendrea Road, Gulval.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 14 Nov 2024 at 09:49.
17 Feb and 11 Apr 2025
South West Water are proposing to carry out Utility repair and maintenance works on Trevarrack Lane, Gulval.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 14 Nov 2024 at 09:56.
17 and 21 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Mousehole.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 14 Nov 2024 at 14:20.
24 Feb and 10 Apr 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Station Road, Long Rock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 15 Nov 2024 at 16:12.
24 Feb and 10 Apr 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Road From Eastern Green To Roundabout East Of Godolphin Villa, Long Rock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (South West) on 15 Nov 2024 at 16:12.
24 and 26 Feb 2025
BT are proposing to carry out Utility asset works on North Cliff, Mousehole.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 22 Nov 2024 at 14:58.
24 and 28 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Road From Lower Grumbla Road To Sancreed Road, Sancreed.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South West Water on 20 Nov 2024 at 10:22.
25 and 27 Feb 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Rosehill, Marazion.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Dec 2024 at 13:03.
25 and 27 Feb 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Road Between St Buryan And Trevorgans Cross Near Crows An Wra, St Buryan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Dec 2024 at 10:22.
3 and 7 Mar 2025
South West Water are proposing to carry out Remedial works on Bread Street, Penzance.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 28 Nov 2024 at 11:09.
Roadworks Map near to Chywoone Hill, PENZANCE, TR18 5AN
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Chywoone Hill, PENZANCE, TR18 5AN (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 4 Dec 2024 - 10 Dec 2024)
(Scheduled: 18 Nov 2024 - 14 Feb 2025)
Contains public sector information licensed under the Open Government Licence v3.0.