ROADWORKS SUMMARY
South Downs/South Drive, South Downs, REDRUTH, TR15 2NN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for South Downs/South Drive, South Downs, TR15 2NN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to South Downs/South Drive, South Downs, REDRUTH, TR15 2NN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for South Downs/South Drive, South Downs are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cornwall Council logo
LONG TERM
Until
1 Sep 2025
Details
View Map
Share
Follow
A390 Between Junction At West Langarth Farm And Roundabout At Threemilestone

Cornwall Council are carrying out Highway improvement works on A390 Between Junction At West Langarth Farm And Roundabout At Threemilestone, Threemilestone.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 August 2022 at 07:30 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cornwall Council on 12 Feb 2025 at 10:18.

Cornwall Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Bissoe Hill

Cornwall Council are carrying out Highway repair and maintenance works on Bissoe Hill, Bissoe.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 16:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 28 Feb 2025 at 13:36.

Cornwall Council logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Road From Bissoe Hill To The Crossroads At Rose Cottage

Cornwall Council are carrying out Highway repair and maintenance works on Road From Bissoe Hill To The Crossroads At Rose Cottage, Bissoe.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 16:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 28 Feb 2025 at 13:36.

Wales And West Utilities logo
LONG TERM
Between
2 Jan and 16 Apr 2025
Details
View Map
Share
Follow
West End

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on West End, Redruth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 10 Sep 2024 at 15:50.

Cornwall Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Poldice

Cornwall Council are carrying out Highway repair and maintenance works on Poldice, St Day.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 January 2025 at 09:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 10:27.

Wales And West Utilities logo
LONG TERM
Until
16 May 2025
Details
View Map
Share
Follow
West End

Wales And West Utilities are carrying out Utility repair and maintenance works on West End, Redruth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 08:00 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 7 Mar 2025 at 10:14.

Cornwall Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Southgate Street

Cornwall Council are proposing to carry out Highway improvement works on Southgate Street, Redruth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cornwall Council on 14 Jan 2025 at 09:43.

Cornwall Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Trevingey Parc

Cornwall Council are carrying out Highway repair and maintenance works on Trevingey Parc, Redruth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 07:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 3 Mar 2025 at 12:17.

Cornwall Council logo
Between
2 and 29 Mar 2025
Details
View Map
Share
Shallow Adit

Cornwall Council were proposing to carry out Highway repair and maintenance works on Shallow Adit, Redruth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Sep 2024 at 14:00.

Cornwall Council logo
Between
2 and 29 Mar 2025
Details
View Map
Share
Scorrier Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Scorrier Road, Redruth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Sep 2024 at 13:44.

Cornwall Council logo
Between
2 and 29 Mar 2025
Details
View Map
Share
Scorrier

Cornwall Council were proposing to carry out Highway repair and maintenance works on Scorrier, Redruth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Sep 2024 at 14:02.

Cornwall Council logo
Between
2 and 29 Mar 2025
Details
View Map
Share
Rabys Row

Cornwall Council were proposing to carry out Highway repair and maintenance works on Rabys Row, Scorrier.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Sep 2024 at 13:43.

Cornwall Council logo
Between
2 and 29 Mar 2025
Details
View Map
Share
A3047 Between The A30 And White Cross

Cornwall Council were proposing to carry out Highway repair and maintenance works on A3047 Between The A30 And White Cross, Scorrier.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Sep 2024 at 13:39.

Cornwall Council logo
Between
2 and 29 Mar 2025
Details
View Map
Share
A3047 Between Scorrier Roundabout And White Cross

Cornwall Council were proposing to carry out Highway repair and maintenance works on A3047 Between Scorrier Roundabout And White Cross, Scorrier.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Sep 2024 at 13:41.

Cornwall Council logo
Between
2 and 29 Mar 2025
Details
View Map
Share
A3047 Road Bridge Across A30 At Scorrier

Cornwall Council were proposing to carry out Highway repair and maintenance works on A3047 Road Bridge Across A30 At Scorrier, Scorrier.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Sep 2024 at 13:24.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
Moorfield Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Moorfield Road, Pool.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 23 Dec 2024 at 06:59.

Cornwall Council logo
Until
4 Apr 2025
Details
View Map
Share
Follow
Moorfield Road

Cornwall Council are carrying out Highway repair and maintenance works on Moorfield Road, Pool.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 March 2025 at 07:30 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 11 Mar 2025 at 12:40.

Cornwall Council logo
Between
16 Mar and 12 Apr 2025
Details
View Map
Share
Follow
Lanner Hill

Cornwall Council are proposing to carry out Highway repair and maintenance works on Lanner Hill, Lanner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 March 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 9 Oct 2024 at 13:19.

Cornwall Council logo
Until
12 Apr 2025
Details
View Map
Share
Follow
Lanner Hill

Cornwall Council are carrying out Highway repair and maintenance works on Lanner Hill, Lanner.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 19:00 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 18 Mar 2025 at 07:40.

BT logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Higher North Country

BT were proposing to carry out Utility asset works on Higher North Country, Redruth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 15 Nov 2024 at 14:37.

BT logo
Between
17 and 31 Mar 2025
Details
View Map
Share
North Country

BT were proposing to carry out Utility asset works on North Country, Redruth.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 15 Nov 2024 at 14:41.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
Road From Terrigal To Chatmar Pet Hotel

Cornwall Council are carrying out Highway repair and maintenance works on Road From Terrigal To Chatmar Pet Hotel, Goonearl, Scorrier.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 17 Mar 2025 at 10:19.

BT logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Forge

BT are proposing to carry out Utility asset works on Forge, Mawla.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Nov 2024 at 13:58.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
Road From Bridge Farm To Terrigal

Cornwall Council are carrying out Highway repair and maintenance works on Road From Bridge Farm To Terrigal, Skinners Bottom, Redruth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 07:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 17 Mar 2025 at 10:19.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Road From Bridge Farm To Terrigal

Cornwall Council were proposing to carry out Highway repair and maintenance works on Road From Bridge Farm To Terrigal, Skinners Bottom, Redruth.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 17 Mar 2025 at 10:19.

BT logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Road From Mawla Well Junction To Mawla Turn

BT are proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 14:39.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
Road From Junction South West Of Hawthorn Cottage To Ivy Chimney Villa

Cornwall Council are carrying out Highway repair and maintenance works on Road From Junction South West Of Hawthorn Cottage To Ivy Chimney Villa, Wheal Rose, Scorrier.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 07:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 17 Mar 2025 at 10:33.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
Road From Wheal Britain Farm To North Hill

Cornwall Council are carrying out Highway repair and maintenance works on Road From Wheal Britain Farm To North Hill, Two Burrows, Blackwater.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 07:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 17 Mar 2025 at 10:33.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
Road From Ivy Chimney Villa To Wheal Britain Farm

Cornwall Council are carrying out Highway repair and maintenance works on Road From Ivy Chimney Villa To Wheal Britain Farm, Skinners Bottom, Redruth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 07:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 17 Mar 2025 at 10:33.

BT logo
Between
17 and 31 Mar 2025
Details
View Map
Share
Follow
Mile Hill

BT are proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Nov 2024 at 13:54.

BT logo
Finishing
Friday
Details
View Map
Share
Road From Mawla Well Junction To Mawla Turn

BT were proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 15 Nov 2024 at 15:05.

BT logo
Finishing
Friday
Details
View Map
Share
Road From Mawla Well Junction To Mawla Turn

BT were proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 29 Nov 2024 at 13:27.

Wales And West Utilities logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Station Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Station Road, Pool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Jan 2025 at 15:12.

Wales And West Utilities logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Station Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Station Road, Pool.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 Jan 2025 at 09:23.

BT logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Forge

BT were proposing to carry out Utility asset works on Forge, Mawla.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 2 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 29 Nov 2024 at 13:29.

BT logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Road From Mawla Well Junction To Mawla Turn

BT are proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Dec 2024 at 14:54.

BT logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Mile Hill

BT were proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 April 2025 and run through until 4 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 29 Nov 2024 at 13:32.

Wales And West Utilities logo
LONG TERM
Between
7 Apr and 23 May 2025
Details
View Map
Share
Follow
Blowinghouse Hill

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Blowinghouse Hill, Redruth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 10 Sep 2024 at 16:04.

Wales And West Utilities logo
LONG TERM
Between
7 Apr and 23 May 2025
Details
View Map
Share
Follow
Blowinghouse Hill

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Blowinghouse Hill, Redruth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 10:57.

BT logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Forge

BT are proposing to carry out Utility asset works on Forge, Mawla.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Dec 2024 at 14:56.

BT logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Follow
Mile Hill

BT are proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Dec 2024 at 11:18.

BT logo
Between
9 and 11 Apr 2025
Details
View Map
Share
Follow
Mile Hill

BT are proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 17 Dec 2024 at 12:54.

Western Power Distribution (South West) logo
Between
22 and 27 Apr 2025
Details
View Map
Share
Brea Adit

Western Power Distribution (South West) were proposing to carry out Permanent reinstatement on Brea Adit, Brea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 27 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Jan 2025 at 13:47.

Western Power Distribution (South West) logo
Between
22 and 27 Apr 2025
Details
View Map
Share
Brea Adit

Western Power Distribution (South West) were proposing to carry out Permanent reinstatement on Brea Adit, Brea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 April 2025 and run through until 27 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 29 Jan 2025 at 12:08.

BT logo
Between
23 and 25 Apr 2025
Details
View Map
Share
Road From Mawla Well Junction To Mawla Turn

BT were proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 22 Jan 2025 at 10:30.

Western Power Distribution (South West) logo
Between
28 Apr and 28 May 2025
Details
View Map
Share
Treskillard

Western Power Distribution (South West) were proposing to carry out Utility asset works on Treskillard, Redruth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 28 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 21 Jan 2025 at 11:33.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Forge

BT were proposing to carry out Utility asset works on Forge, Mawla.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 22 Jan 2025 at 10:32.

BT logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Mile Hill

BT were proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 22 Jan 2025 at 10:26.

Cornwall Council logo
Between
5 and 9 May 2025
Details
View Map
Share
Follow
Penvale

Cornwall Council are proposing to carry out Highway repair and maintenance works on Penvale, St Gluvias.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 20 Jan 2025 at 13:16.

Cornwall Council logo
Between
5 and 9 May 2025
Details
View Map
Share
Follow
A39 Between Junction At Visicks Works And Sticken Bridge

Cornwall Council are proposing to carry out Highway repair and maintenance works on A39 Between Junction At Visicks Works And Sticken Bridge, Perranarworthal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 20 Jan 2025 at 13:15.

Cornwall Council logo
Between
5 and 9 May 2025
Details
View Map
Share
Follow
Barras Moor

Cornwall Council are proposing to carry out Highway repair and maintenance works on Barras Moor, Perranarworthal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 20 Jan 2025 at 13:15.

Western Power Distribution (South West) logo
Between
6 and 11 May 2025
Details
View Map
Share
Follow
Brea Adit

Western Power Distribution (South West) are proposing to carry out Permanent reinstatement on Brea Adit, Brea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 4 Feb 2025 at 14:44.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
A393 Between Burnthouse And Four Cross

Cornwall Council are proposing to carry out Highway repair and maintenance works on A393 Between Burnthouse And Four Cross, Treluswell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:49.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Burnthouse

Cornwall Council are proposing to carry out Highway repair and maintenance works on Burnthouse, St Gluvias.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:56.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
St Michaels Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on St Michaels Road, Ponsanooth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:50.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
A393 Between Junction North Of Lower Penlean House And Park Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on A393 Between Junction North Of Lower Penlean House And Park Road, Ponsanooth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:56.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
A393 Between Pelean Cross And Junction North Of Lower Penlean House

Cornwall Council are proposing to carry out Highway repair and maintenance works on A393 Between Pelean Cross And Junction North Of Lower Penlean House, Pelean Cross, Ponsanooth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:52.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
A393 Between District Boundary At Pellyn Wollas And Pelean Cross

Cornwall Council are proposing to carry out Highway repair and maintenance works on A393 Between District Boundary At Pellyn Wollas And Pelean Cross, Pelean Cross, Ponsanooth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:50.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
A393 Between District Boundaries Between Pengreep And Pelean Cross

Cornwall Council are proposing to carry out Highway repair and maintenance works on A393 Between District Boundaries Between Pengreep And Pelean Cross, Ponsanooth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:51.

Western Power Distribution (South West) logo
Between
12 May and 10 Jun 2025
Details
View Map
Share
Treskillard

Western Power Distribution (South West) were proposing to carry out Utility asset works on Treskillard, Redruth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 10 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Jan 2025 at 09:38.

Western Power Distribution (South West) logo
Between
12 May and 10 Jun 2025
Details
View Map
Share
Follow
Treskillard

Western Power Distribution (South West) are proposing to carry out Utility asset works on Treskillard, Redruth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 4 Feb 2025 at 14:44.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
A393 Between The Junction North Of Pengreep Barton And District Boundary At Pengreep

Cornwall Council are proposing to carry out Highway repair and maintenance works on A393 Between The Junction North Of Pengreep Barton And District Boundary At Pengreep, Ponsanooth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:52.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
A393 Between Merrymeeting And Junction North Of Pengreep Barton

Cornwall Council are proposing to carry out Highway repair and maintenance works on A393 Between Merrymeeting And Junction North Of Pengreep Barton, Burncoose, Gwennap.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:49.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
A393 Between Penventon House And Comford

Cornwall Council are proposing to carry out Highway repair and maintenance works on A393 Between Penventon House And Comford, Comford, Redruth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:51.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
A393 Between The District Boundary And Penventon House

Cornwall Council are proposing to carry out Highway repair and maintenance works on A393 Between The District Boundary And Penventon House, Gwennap.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:36.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
A393 Between Lanner Moor And Treviskey

Cornwall Council are proposing to carry out Highway repair and maintenance works on A393 Between Lanner Moor And Treviskey, Treviskey, Lanner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:56.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
A393 Between Comford And Merrymeeting

Cornwall Council are proposing to carry out Highway repair and maintenance works on A393 Between Comford And Merrymeeting, Comford, Redruth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:51.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Lanner Moor

Cornwall Council are proposing to carry out Highway repair and maintenance works on Lanner Moor, Lanner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:50.

Cornwall Council logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Lanner Hill

Cornwall Council are proposing to carry out Highway repair and maintenance works on Lanner Hill, Lanner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 14:50.

BT logo
Between
12 and 28 May 2025
Details
View Map
Share
Follow
Higher North Country

BT are proposing to carry out Utility asset works on Higher North Country, Redruth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 7 Feb 2025 at 13:54.

BT logo
Between
12 and 28 May 2025
Details
View Map
Share
Follow
Forge

BT are proposing to carry out Utility asset works on Forge, Mawla.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 7 Feb 2025 at 13:53.

BT logo
Between
12 and 28 May 2025
Details
View Map
Share
Follow
Mile Hill

BT are proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 7 Feb 2025 at 13:55.

BT logo
Between
12 and 28 May 2025
Details
View Map
Share
Follow
Road From Mawla Well Junction To Mawla Turn

BT are proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 7 Feb 2025 at 13:54.

Western Power Distribution (South West) logo
Between
19 May and 15 Jun 2025
Details
View Map
Share
Road From Little Trewince To Rame Cross

Western Power Distribution (South West) were proposing to carry out Utility asset works on Road From Little Trewince To Rame Cross, Rame Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 15 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 27 Feb 2025 at 13:12.

Western Power Distribution (South West) logo
Between
19 May and 15 Jun 2025
Details
View Map
Share
Follow
Road From Little Trewince To Rame Cross

Western Power Distribution (South West) are proposing to carry out Utility asset works on Road From Little Trewince To Rame Cross, Rame Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 4 Mar 2025 at 11:53.

Western Power Distribution (South West) logo
Between
19 May and 15 Jun 2025
Details
View Map
Share
Road From Little Trewince To Rame Cross

Western Power Distribution (South West) were proposing to carry out Utility asset works on Road From Little Trewince To Rame Cross, Rame Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 15 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 20 Mar 2025 at 10:54.

Cornwall Council logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Cliff View Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Cliff View Road, Camborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Mar 2025 at 09:21.

Wales And West Utilities logo
Between
28 May and 2 Jun 2025
Details
View Map
Share
Follow
Cardrew Close

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cardrew Close, Redruth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 20 Feb 2025 at 14:08.

Wales And West Utilities logo
Between
28 May and 2 Jun 2025
Details
View Map
Share
Follow
Cardrew Close

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cardrew Close, Redruth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 21 Feb 2025 at 11:45.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Church Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on Church Street, Camborne.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Mar 2025 at 11:39.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
College Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on College Street, Camborne.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Mar 2025 at 11:38.

BT logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Park Holly

BT were proposing to carry out Utility asset works on Park Holly, Treswithian.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Mar 2025 at 14:16.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Treswithian Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Treswithian Road, Treswithian.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Mar 2025 at 11:38.

BT logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Weeth Road

BT were proposing to carry out Utility asset works on Weeth Road, Camborne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Mar 2025 at 14:15.

BT logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Marriotts Avenue

BT were proposing to carry out Utility asset works on Marriotts Avenue, Camborne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Mar 2025 at 14:16.

BT logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Jethan Drive

BT were proposing to carry out Utility asset works on Jethan Drive, Camborne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Mar 2025 at 14:16.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Cusgarne To Junction At Mill Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Cusgarne To Junction At Mill Cottage, Cusgarne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Mar 2025 at 11:37.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Coombe Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on Coombe Lane, Bissoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 14 Mar 2025 at 11:39.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Coombe Lane To Coldwind Cross On Grenna Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Coombe Lane To Coldwind Cross On Grenna Lane, Hicks Mill, Bissoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:28.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Junction At Riverside To Junction At Bissoe Tramway Cycle Hire

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction At Riverside To Junction At Bissoe Tramway Cycle Hire, Point Mills, Bissoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 11:34.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Bissoe To Junction North Of Hollybush Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Bissoe To Junction North Of Hollybush Cottage, Bissoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 11:35.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Cross Lanes To Bissoe

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Cross Lanes To Bissoe, Bissoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 11:35.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Junction At Bissoe Tramway Cycle Hire To Grenna Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction At Bissoe Tramway Cycle Hire To Grenna Lane, Bissoe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 11:35.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Wheal Sperris Villa To Junction North Of Hugus Farm

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Wheal Sperris Villa To Junction North Of Hugus Farm, Hugus, Truro.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 11:31.

BT logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Follow
Higher North Country

BT are proposing to carry out Utility asset works on Higher North Country, Redruth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Feb 2025 at 11:03.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Terrigal To Chatmar Pet Hotel

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Terrigal To Chatmar Pet Hotel, Goonearl, Scorrier.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:23.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Roundabout At The A3047 And A30 Slip To Blackbirds Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Roundabout At The A3047 And A30 Slip To Blackbirds Cottage, Scorrier.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:29.

BT logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Follow
Forge

BT are proposing to carry out Utility asset works on Forge, Mawla.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Feb 2025 at 11:04.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Bridge Farm To Terrigal

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Bridge Farm To Terrigal, Skinners Bottom, Redruth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:23.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Blackbirds Cottage To Junction At Snowdrop Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Blackbirds Cottage To Junction At Snowdrop Cottage, Blackwater.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:30.

BT logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Follow
Road From Mawla Well Junction To Mawla Turn

BT are proposing to carry out Utility asset works on Road From Mawla Well Junction To Mawla Turn, Nancekuke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Feb 2025 at 10:56.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Homeleigh To Grove Farm

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Homeleigh To Grove Farm, Blackwater.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:29.

BT logo
Between
2 and 18 Jun 2025
Details
View Map
Share
Follow
Mile Hill

BT are proposing to carry out Utility asset works on Mile Hill, Porthtowan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Feb 2025 at 11:02.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Grove Farm To Junction At Meadowside

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Grove Farm To Junction At Meadowside, East Hill, Blackwater.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:31.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Wheal Music To Short Cross Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Wheal Music To Short Cross Road, Mount Hawke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:22.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Road From Junction At Meadowside To Cledma

Cornwall Council were proposing to carry out Highway repair and maintenance works on Road From Junction At Meadowside To Cledma, Blackwater.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 14 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 13:03.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Road From Junction At Meadowside To Cledma

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction At Meadowside To Cledma, Blackwater.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 13 Mar 2025 at 10:24.

Cornwall Council logo
LONG TERM
Between
4 Jun and 14 Jul 2025
Details
View Map
Share
Road From Coombe Lane To Coldwind Cross On Grenna Lane

Cornwall Council were proposing to carry out Highway repair and maintenance works on Road From Coombe Lane To Coldwind Cross On Grenna Lane, Hicks Mill, Bissoe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 14 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 15:51.

Cornwall Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Penvale

Cornwall Council are proposing to carry out Highway repair and maintenance works on Penvale, St Gluvias.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 3 Feb 2025 at 12:49.

Cornwall Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Barras Moor

Cornwall Council are proposing to carry out Highway repair and maintenance works on Barras Moor, Perranarworthal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 3 Feb 2025 at 12:49.

BT logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Ringwell Hill

BT are proposing to carry out Utility asset works on Ringwell Hill, Carnon Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 19 Mar 2025 at 11:51.

BT logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Road From Grenna Lane To Chyreen Lane

BT are proposing to carry out Utility asset works on Road From Grenna Lane To Chyreen Lane, Quenchwell, Carnon Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 19 Mar 2025 at 11:51.

Western Power Distribution (South West) logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Post Box Row

Western Power Distribution (South West) are proposing to carry out Utility asset works on Post Box Row, Brea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 13 Feb 2025 at 17:24.

Western Power Distribution (South West) logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Higher Brea

Western Power Distribution (South West) are proposing to carry out Remedial works on Higher Brea, Brea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 13 Feb 2025 at 17:24.

Western Power Distribution (South West) logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Lower Brea

Western Power Distribution (South West) are proposing to carry out Remedial works on Lower Brea, Brea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 13 Feb 2025 at 17:24.

Western Power Distribution (South West) logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Tincroft Road

Western Power Distribution (South West) are proposing to carry out Remedial works on Tincroft Road, Carn Brea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 13 Feb 2025 at 17:25.

Western Power Distribution (South West) logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Brea Arch

Western Power Distribution (South West) are proposing to carry out Remedial works on Brea Arch, Brea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 13 Feb 2025 at 17:25.

Western Power Distribution (South West) logo
LONG TERM
Between
15 Jun and 31 Jul 2025
Details
View Map
Share
Follow
Kerrier Way

Western Power Distribution (South West) are proposing to carry out Utility asset works on Kerrier Way, Camborne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 14 Mar 2025 at 09:51.

Western Power Distribution (South West) logo
LONG TERM
Between
16 Jun and 10 Aug 2025
Details
View Map
Share
Follow
Rame Common

Western Power Distribution (South West) are proposing to carry out Utility asset works on Rame Common, Rame.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 10 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 4 Mar 2025 at 09:33.

Western Power Distribution (South West) logo
LONG TERM
Between
16 Jun and 10 Aug 2025
Details
View Map
Share
Rame Common

Western Power Distribution (South West) were proposing to carry out Utility asset works on Rame Common, Rame.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 10 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 20 Mar 2025 at 10:54.

Western Power Distribution (South West) logo
LONG TERM
Between
16 Jun and 10 Aug 2025
Details
View Map
Share
Rame Common

Western Power Distribution (South West) were proposing to carry out Utility asset works on Rame Common, Rame.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 10 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 27 Feb 2025 at 11:50.

Cornwall Council logo
LONG TERM
Between
16 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Albert Street

Cornwall Council are proposing to carry out Highway improvement works on Albert Street, Camborne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 4 Mar 2025 at 11:47.

Cornwall Council logo
LONG TERM
Between
16 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Albert Street

Cornwall Council are proposing to carry out Highway improvement works on Albert Street, Camborne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 11 Mar 2025 at 15:07.

Cornwall Council logo
LONG TERM
Between
16 Jun and 29 Aug 2025
Details
View Map
Share
Follow
North Parade

Cornwall Council are proposing to carry out Highway improvement works on North Parade, Camborne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 4 Mar 2025 at 11:49.

Cornwall Council logo
LONG TERM
Between
16 Jun and 29 Aug 2025
Details
View Map
Share
Follow
North Parade

Cornwall Council are proposing to carry out Highway improvement works on North Parade, Camborne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 11 Mar 2025 at 14:57.

Cornwall Council logo
LONG TERM
Between
16 Jun and 29 Aug 2025
Details
View Map
Share
Follow
North Parade

Cornwall Council are proposing to carry out Highway improvement works on North Parade, Camborne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 15:00.

Cornwall Council logo
LONG TERM
Between
16 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Park Road

Cornwall Council are proposing to carry out Highway improvement works on Park Road, Camborne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 4 Mar 2025 at 11:48.

Cornwall Council logo
LONG TERM
Between
16 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Park Road

Cornwall Council are proposing to carry out Highway improvement works on Park Road, Camborne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 11 Mar 2025 at 15:08.

Cornwall Council logo
LONG TERM
Between
16 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Roskear Road

Cornwall Council are proposing to carry out Highway improvement works on Roskear Road, Camborne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 4 Mar 2025 at 11:44.

Cornwall Council logo
LONG TERM
Between
16 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Roskear Road

Cornwall Council are proposing to carry out Highway improvement works on Roskear Road, Camborne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 11 Mar 2025 at 15:07.

South West Water logo
Between
18 and 22 Jun 2025
Details
View Map
Share
Follow
Pendarves Street

South West Water are proposing to carry out Utility repair and maintenance works on Pendarves Street, Tuckingmill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 19 Mar 2025 at 12:00.


Roadworks Map near to South Downs/South Drive, South Downs, REDRUTH, TR15 2NN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Mar 2025 06:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to South Downs/South Drive, South Downs, REDRUTH, TR15 2NN (25 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cornwall Council logo
MAJOR
  
LANNER HILL 
(0.1 miles)
Cornwall Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 16 Mar 2025 - 12 Apr 2025
0.1
Details
Share
Follow
2
Cornwall Council logo
MAJOR
  
LANNER HILL 
(0.1 miles)
Cornwall Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 17 Mar 2025 19:00
(Scheduled: 16 Mar 2025 - 12 Apr 2025)
0.1
Details
Share
Follow
3
Cornwall Council logo
MAJOR
  
PENNANCE ROAD 
(0.4 miles)
Cornwall Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 17 Mar 2025 19:00
(Scheduled: 16 Mar 2025 - 12 Apr 2025)
0.4
Details
Share
Follow
4
Cornwall Council logo
MAJOR
  
PENNANCE ROAD 
(0.4 miles)
Cornwall Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 16 Mar 2025 - 12 Apr 2025
0.4
Details
Share
Follow
5
Cornwall Council logo
MAJOR
  
SOUTHGATE STREET 
(0.4 miles)
Cornwall Council
Highway improvement works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 3 Feb 2025 - 28 Mar 2025
0.4
Details
Share
Follow
6
Cornwall Council logo
MAJOR
  
ROAD FROM LANNER HILL TO LANNER GREEN 
(0.5 miles)
Cornwall Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 17 Mar 2025 19:00
(Scheduled: 16 Mar 2025 - 12 Apr 2025)
0.5
Details
Share
Follow
7
Cornwall Council logo
MAJOR
  
ROAD FROM LANNER HILL TO LANNER GREEN 
(0.5 miles)
Cornwall Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 16 Mar 2025 - 12 Apr 2025
0.5
Details
Share
Follow
8
Cornwall Council logo
MAJOR
  
LANNARTH GLAS 
(0.6 miles)
Cornwall Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 17 Mar 2025 19:00
(Scheduled: 16 Mar 2025 - 12 Apr 2025)
0.6
Details
Share
Follow
9
Cornwall Council logo
MAJOR
  
LANNARTH GLAS 
(0.6 miles)
Cornwall Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 16 Mar 2025 - 12 Apr 2025
0.6
Details
Share
Follow
10
Cornwall Council logo
MAJOR
  
LANNER GREEN 
(0.7 miles)
Cornwall Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 17 Mar 2025 19:00
(Scheduled: 16 Mar 2025 - 12 Apr 2025)
0.7
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.