ROADWORKS SUMMARY
Berry Pomeroy, TOTNES, TQ9 6LN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for TQ9 6LN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Berry Pomeroy, TOTNES, TQ9 6LN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Torbay Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Kings Ash Road

Torbay Council are carrying out Works for road purposes on Kings Ash Road, Paignton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 07:00 and could run through until 31 January 2025. The works will impact the carriageway, cycleway and footpath.

This roadwork event was last updated by Torbay Council on 17 Dec 2024 at 16:01.

Wales And West Utilities logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Marldon Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Marldon Road, Torquay.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:30 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 3 Dec 2024 at 12:47.

Wales And West Utilities logo
LONG TERM
Between
25 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Marldon Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Marldon Road, Torquay.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 15 Aug 2024 at 14:39.

South West Water logo
Finishing
Today
Details
View Map
Share
Follow
Bow Bridge To Cross Lanes

South West Water are carrying out Utility repair and maintenance works on Bow Bridge To Cross Lanes, Ashprington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 16:35 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South West Water on 13 Dec 2024 at 08:51.

Airband Community Internet logo
Finishing
Today
Details
View Map
Share
Bourton Road

Airband Community Internet were proposing to carry out Utility asset works on Bourton Road, Totnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 13 Sep 2024 at 10:37.

Devon County Council logo
Finishing
Friday
Details
View Map
Share
Follow
A384 Hood Manor To Riverford

Devon County Council are proposing to carry out Highway repair and maintenance works on A384 Hood Manor To Riverford, Staverton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 5 Sep 2024 at 10:10.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
True Street Cross

BT are proposing to carry out Utility asset works on True Street Cross, Berry Pomeroy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 7 Oct 2024 at 10:35.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
True Street Cross

BT are proposing to carry out Utility asset works on True Street Cross, Berry Pomeroy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Sep 2024 at 16:07.

Nexfibre Networks Limited logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Maudlin Road

Nexfibre Networks Limited were proposing to carry out Utility asset works on Maudlin Road, Totnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 1 Oct 2024 at 16:17.

Nexfibre Networks Limited logo
Between
2 and 8 Jan 2025
Details
View Map
Share
Maudlin Road

Nexfibre Networks Limited were proposing to carry out Utility asset works on Maudlin Road, Totnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 2 Oct 2024 at 10:52.

Wales And West Utilities logo
LONG TERM
Between
2 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Fore Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Fore Street, Totnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 7 Oct 2024 at 09:52.

Wales And West Utilities logo
LONG TERM
Between
2 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Fore Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Fore Street, Totnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 8 Aug 2024 at 11:40.

Wales And West Utilities logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Highfield Crescent

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Highfield Crescent, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 1 May 2024 at 07:25.

The Environment Agency logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Torquay Road Rear 216 - 212

The Environment Agency are proposing to carry out Utility repair and maintenance works on Torquay Road Rear 216 - 212, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by The Environment Agency on 25 Nov 2024 at 14:53.

Devon County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Willing Cross To Tigley Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Willing Cross To Tigley Cross, Dartington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 31 Oct 2024 at 15:14.

Wales And West Utilities logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Highfield Crescent

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Highfield Crescent, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 1 May 2024 at 10:15.

South West Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
High Street

South West Water were proposing to carry out Utility repair and maintenance works on High Street, Totnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South West Water on 23 Sep 2024 at 11:12.

Nexfibre Networks Limited logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Maudlin Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Maudlin Road, Totnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 3 Oct 2024 at 08:13.

Torbay Council logo
LONG TERM
Between
6 Jan and 26 Apr 2025
Details
View Map
Share
Follow
Torbay Road

Torbay Council are proposing to carry out Highway improvement works on Torbay Road, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Torbay Council on 24 Oct 2024 at 18:38.

South West Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
High Street

South West Water were proposing to carry out Utility repair and maintenance works on High Street, Totnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South West Water on 19 Sep 2024 at 15:36.

Torbay Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hamelin Way

Torbay Council are proposing to carry out Highway repair and maintenance works on Hamelin Way, Torquay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Torbay Council on 25 Oct 2024 at 22:04.

Torbay Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hamelin Way

Torbay Council are proposing to carry out Highway repair and maintenance works on Hamelin Way, Torquay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Torbay Council on 25 Oct 2024 at 16:21.

Devon County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
A384 Hood Manor To Riverford

Devon County Council are proposing to carry out Highway repair and maintenance works on A384 Hood Manor To Riverford, Dartington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 25 Sep 2024 at 11:48.

Airband Community Internet logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
The Grove

Airband Community Internet are proposing to carry out Utility asset works on The Grove, Totnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 24 Sep 2024 at 17:22.

Airband Community Internet logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
The Grove

Airband Community Internet are proposing to carry out Utility asset works on The Grove, Totnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Airband Community Internet on 18 Oct 2024 at 10:35.

Network Rail logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Seaway Road

Network Rail are proposing to carry out Works for Rail Purposes on Seaway Road, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 Sep 2024 at 09:05.

Network Rail logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Seaway Road

Network Rail are proposing to carry out Works for Rail Purposes on Seaway Road, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Sep 2024 at 09:30.

South West Water logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Marldon Cross Hill

South West Water were proposing to carry out Remedial works on Marldon Cross Hill, Marldon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 17 Oct 2024 at 10:26.

Wales And West Utilities logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Seaway Road Rear 2 - 12

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Seaway Road Rear 2 - 12, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 12:58.

Wales And West Utilities logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Seaway Road Rear 2 - 12

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Seaway Road Rear 2 - 12, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 19 Sep 2024 at 15:54.

South West Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Tanners Road

South West Water are proposing to carry out Utility repair and maintenance works on Tanners Road, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 14 Oct 2024 at 08:54.

Devon County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Paignton Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Paignton Road, Stoke Gabriel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 7 Nov 2024 at 14:55.

South West Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Tanners Road

South West Water are proposing to carry out Utility repair and maintenance works on Tanners Road, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 2 Oct 2024 at 11:52.

The Environment Agency logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Torquay Road Rear 216 - 212

The Environment Agency are proposing to carry out Utility repair and maintenance works on Torquay Road Rear 216 - 212, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the verge only.

This roadwork event was last updated by The Environment Agency on 9 Dec 2024 at 09:11.

South West Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Colley End Road

South West Water are proposing to carry out Utility asset works on Colley End Road, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 2 Oct 2024 at 09:59.

South West Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Road From Cott Cross To The Queens Arms

South West Water are proposing to carry out Utility repair and maintenance works on Road From Cott Cross To The Queens Arms, Dartington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 16 Oct 2024 at 12:16.

Devon County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Washbourne Cross To Washbourne Bridge Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Washbourne Cross To Washbourne Bridge Cross, Washbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 16 Oct 2024 at 17:00.

Devon County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Washbourne Cross To Washbourne Bridge Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Washbourne Cross To Washbourne Bridge Cross, Washbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 17 Oct 2024 at 09:47.

South West Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Road Heading Northeast From Comptonpool Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road Heading Northeast From Comptonpool Cross, Marldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Nov 2024 at 10:52.

South West Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Road Heading Southeast From Bulleigh Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road Heading Southeast From Bulleigh Cross, Ipplepen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Nov 2024 at 10:52.

Western Power Distribution (South West) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Langridge Road

Western Power Distribution (South West) are proposing to carry out New service connection on Langridge Road, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Nov 2024 at 22:08.

Western Power Distribution (South West) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Langridge Road

Western Power Distribution (South West) are proposing to carry out New service connection on Langridge Road, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 4 Nov 2024 at 09:54.

Western Power Distribution (South West) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Langridge Road

Western Power Distribution (South West) were proposing to carry out New service connection on Langridge Road, Paignton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 4 Dec 2024 at 10:44.

Western Power Distribution (South West) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Langridge Road

Western Power Distribution (South West) were proposing to carry out New service connection on Langridge Road, Paignton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 2 Dec 2024 at 11:40.

Devon County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Willing Cross To Tigley Cross

Devon County Council are proposing to carry out Highway repair and maintenance works on Willing Cross To Tigley Cross, Dartington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 31 Oct 2024 at 13:46.

Wales And West Utilities logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Hayes Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Hayes Road, Paignton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 6 Nov 2024 at 12:07.

South West Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Compton Pool Cross To Compton

South West Water are proposing to carry out Utility repair and maintenance works on Compton Pool Cross To Compton, Compton, Marldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Nov 2024 at 10:53.

South West Water logo
Between
5 and 10 Feb 2025
Details
View Map
Share
High Street

South West Water were proposing to carry out Utility repair and maintenance works on High Street, Totnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 10 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South West Water on 30 Sep 2024 at 10:56.

South West Water logo
Between
5 and 10 Feb 2025
Details
View Map
Share
High Street

South West Water were proposing to carry out Utility repair and maintenance works on High Street, Totnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 10 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South West Water on 7 Oct 2024 at 15:51.

Torbay Council logo
LONG TERM
Between
10 Feb and 1 May 2025
Details
View Map
Share
Follow
Totnes Road

Torbay Council are proposing to carry out Highway improvement works on Totnes Road, Paignton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Torbay Council on 6 Dec 2024 at 14:38.

South West Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Weirfields

South West Water were proposing to carry out Utility repair and maintenance works on Weirfields, Totnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South West Water on 22 Nov 2024 at 08:05.

South West Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Leigh Bridge To Broadpark Stile

South West Water are proposing to carry out Utility repair and maintenance works on Leigh Bridge To Broadpark Stile, Harberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 5 Nov 2024 at 09:45.

BT logo
Between
16 Feb and 2 Mar 2025
Details
View Map
Share
A381 Brockhills Cross To Main Road

BT were proposing to carry out Utility asset works on A381 Brockhills Cross To Main Road, Harbertonford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 2 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 1 Nov 2024 at 13:32.

BT logo
Between
16 Feb and 2 Mar 2025
Details
View Map
Share
Follow
A381 Brockhills Cross To Main Road

BT are proposing to carry out Utility asset works on A381 Brockhills Cross To Main Road, Harbertonford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 2 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Nov 2024 at 10:13.

South West Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Blackdown Cross To Tideford Cross

South West Water are proposing to carry out Utility repair and maintenance works on Blackdown Cross To Tideford Cross, Allaleigh, Blackawton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 25 Oct 2024 at 12:14.

South West Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Road Heading Northeast From Comptonpool Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road Heading Northeast From Comptonpool Cross, Marldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 7 Nov 2024 at 12:48.

South West Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Road Heading Southeast From Bulleigh Cross

South West Water are proposing to carry out Utility repair and maintenance works on Road Heading Southeast From Bulleigh Cross, Ipplepen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 7 Nov 2024 at 12:45.

Wales And West Utilities logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Shorton Valley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Shorton Valley Road, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 07:58.

South West Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Compton Pool Cross To Compton

South West Water are proposing to carry out Utility repair and maintenance works on Compton Pool Cross To Compton, Compton, Marldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 7 Nov 2024 at 12:48.

Wales And West Utilities logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Shorton Valley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Shorton Valley Road, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 Nov 2024 at 08:40.

Wales And West Utilities logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Coombe Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Coombe Road, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 11 Nov 2024 at 15:37.

Wales And West Utilities logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Coombe Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Coombe Road, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 07:58.

Torbay Council logo
LONG TERM
Between
17 Feb and 6 Jun 2025
Details
View Map
Share
Follow
Torbay Road

Torbay Council are proposing to carry out Highway improvement works on Torbay Road, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Torbay Council on 18 Dec 2024 at 08:02.

Wales And West Utilities logo
Between
19 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Roundham Gardens

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Roundham Gardens, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 8 Nov 2024 at 09:49.

Devon County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Ashprington Cross To Ashprington Roundabout Along Zc44

Devon County Council are proposing to carry out Highway repair and maintenance works on Ashprington Cross To Ashprington Roundabout Along Zc44, Ashprington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 22 Oct 2024 at 10:44.

South West Water logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Riverside Road

South West Water are proposing to carry out Utility repair and maintenance works on Riverside Road, Dittisham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 29 Nov 2024 at 09:36.

Devon County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Ashprington Cross To Ashprington Roundabout Along Zc44

Devon County Council are proposing to carry out Highway repair and maintenance works on Ashprington Cross To Ashprington Roundabout Along Zc44, Ashprington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 21 Oct 2024 at 14:36.

South West Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Hulstercombe Linhay To Lovelane Farm

South West Water are proposing to carry out Utility repair and maintenance works on Hulstercombe Linhay To Lovelane Farm, Marldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 25 Oct 2024 at 10:02.

South West Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Fore Street

South West Water were proposing to carry out Utility repair and maintenance works on Fore Street, Totnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 2 Dec 2024 at 09:24.

South West Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Fore Street

South West Water were proposing to carry out Utility repair and maintenance works on Fore Street, Totnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 28 Nov 2024 at 10:51.

South West Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
High Street

South West Water were proposing to carry out Utility repair and maintenance works on High Street, Totnes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South West Water on 2 Dec 2024 at 08:39.

Devon County Council logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Furzegood

Devon County Council are proposing to carry out Highway repair and maintenance works on Furzegood, Marldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 21 Oct 2024 at 15:29.

Devon County Council logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Furzegood

Devon County Council are proposing to carry out Highway repair and maintenance works on Furzegood, Marldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 22 Oct 2024 at 10:32.

South West Water logo
Between
28 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Ashprington Roundabout To Bow Bridge Cross Along Zc44

South West Water are proposing to carry out Utility repair and maintenance works on Ashprington Roundabout To Bow Bridge Cross Along Zc44, Ashprington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 14 Nov 2024 at 16:22.

Western Power Distribution (South West) logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Road From Waterford Cross To Ashwick House

Western Power Distribution (South West) are proposing to carry out New service connection on Road From Waterford Cross To Ashwick House, Broadhempston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 2 Dec 2024 at 15:37.

Wales And West Utilities logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Alta Vista Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Alta Vista Road, Paignton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 10 Dec 2024 at 11:07.

Wales And West Utilities logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Alta Vista Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Alta Vista Road, Paignton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 10 Dec 2024 at 09:20.

BT logo
Between
14 and 18 Mar 2025
Details
View Map
Share
Follow
Blackpost Lane To Weston Lane

BT are proposing to carry out Utility asset works on Blackpost Lane To Weston Lane, Berry Pomeroy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Dec 2024 at 11:52.

BT logo
Between
14 and 18 Mar 2025
Details
View Map
Share
Follow
Blackpost Lane To Weston Lane

BT are proposing to carry out Utility asset works on Blackpost Lane To Weston Lane, Berry Pomeroy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Dec 2024 at 12:10.

BT logo
Between
14 and 18 Mar 2025
Details
View Map
Share
Follow
Weston Lane

BT are proposing to carry out Utility asset works on Weston Lane, Totnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Dec 2024 at 11:52.

BT logo
Between
14 and 18 Mar 2025
Details
View Map
Share
Follow
Weston Lane

BT are proposing to carry out Utility asset works on Weston Lane, Totnes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Dec 2024 at 12:10.

Wales And West Utilities logo
LONG TERM
Between
17 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Langdon Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Langdon Road, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 16 Dec 2024 at 09:56.

Wales And West Utilities logo
LONG TERM
Between
17 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Butland Avenue

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Butland Avenue, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 16 Dec 2024 at 15:40.

Wales And West Utilities logo
LONG TERM
Between
17 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Butland Avenue

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Butland Avenue, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 16 Dec 2024 at 09:54.

Wales And West Utilities logo
LONG TERM
Between
17 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Langdon Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Langdon Road, Preston, Paignton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 16 Dec 2024 at 15:39.

Wales And West Utilities logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Roundham Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Roundham Road, Paignton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 10 Dec 2024 at 09:36.

Wales And West Utilities logo
Between
17 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Roundham Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Roundham Road, Paignton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 10 Dec 2024 at 11:08.


Roadworks Map near to Berry Pomeroy, TOTNES, TQ9 6LN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Berry Pomeroy, TOTNES, TQ9 6LN (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MAJOR
  
TRUE STREET CROSS 
(0.6 miles)
BT
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.6
Details
Share
Follow
2
BT logo
MAJOR
  
TRUE STREET CROSS 
(0.6 miles)
BT
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.6
Details
Share
Follow
3
Virgin Media logo
COURTFIELD 
(0.9 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 19 Dec 2024
0.9
Details
Share
Follow