ROADWORKS SUMMARY
Bonaventure Road, SALCOMBE, TQ8 8BG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Bonaventure Road, TQ8 8BG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Bonaventure Road, SALCOMBE, TQ8 8BG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bonaventure Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wales And West Utilities logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
A381 Oldaway Tongue To Langworthys Barn

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on A381 Oldaway Tongue To Langworthys Barn, West Alvington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 29 Jul 2024 at 13:50.

Wales And West Utilities logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
A381 Oldaway Tongue To Langworthys Barn

Wales And West Utilities are carrying out Utility repair and maintenance works on A381 Oldaway Tongue To Langworthys Barn, West Alvington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 15:00 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 16 Dec 2024 at 17:42.

Wales And West Utilities logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
A381 Oldaway Tongue To Burleigh Lane End

Wales And West Utilities are carrying out Utility repair and maintenance works on A381 Oldaway Tongue To Burleigh Lane End, South Milton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 15:00 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 16 Dec 2024 at 17:43.

Wales And West Utilities logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
A381 Oldaway Tongue To Burleigh Lane End

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on A381 Oldaway Tongue To Burleigh Lane End, South Milton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 29 Jul 2024 at 13:49.

Wales And West Utilities logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
A381 Burleigh Lane End To Luckhams Lane

Wales And West Utilities are carrying out Utility repair and maintenance works on A381 Burleigh Lane End To Luckhams Lane, Malborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 15:00 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 16 Dec 2024 at 17:43.

Wales And West Utilities logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
A381 Burleigh Lane End To Luckhams Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on A381 Burleigh Lane End To Luckhams Lane, Malborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wales And West Utilities on 29 Jul 2024 at 13:49.

Western Power Distribution (South West) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Kiln Lane To A379

Western Power Distribution (South West) are proposing to carry out Utility asset works on Kiln Lane To A379, Stokenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 30 Oct 2024 at 12:06.

Western Power Distribution (South West) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Kiln Lane

Western Power Distribution (South West) are proposing to carry out Utility asset works on Kiln Lane, Stokenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 10 Oct 2024 at 09:48.

Wales And West Utilities logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Main Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Main Road, Salcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Wales And West Utilities on 17 Sep 2024 at 14:08.

Western Power Distribution (South West) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Kiln Lane

Western Power Distribution (South West) are proposing to carry out Utility asset works on Kiln Lane, Stokenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 30 Oct 2024 at 12:06.

Wales And West Utilities logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Main Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Main Road, Salcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Wales And West Utilities on 13 Sep 2024 at 09:56.

Wales And West Utilities logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Main Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Main Road, Salcombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 11 Sep 2024 at 16:05.

Western Power Distribution (South West) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Kiln Lane

Western Power Distribution (South West) were proposing to carry out Utility asset works on Kiln Lane, Stokenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 23 Sep 2024 at 20:18.

Western Power Distribution (South West) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Kiln Lane To A379

Western Power Distribution (South West) are proposing to carry out Utility asset works on Kiln Lane To A379, Stokenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 10 Oct 2024 at 09:49.

Wales And West Utilities logo
LONG TERM
Between
9 Jan and 3 Mar 2025
Details
View Map
Share
Main Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Main Road, Salcombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 January 2025 and run through until 3 March 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Wales And West Utilities on 11 Sep 2024 at 12:40.

Devon County Council logo
Between
20 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Coleridge Lane

Devon County Council are proposing to carry out Highway repair and maintenance works on Coleridge Lane, Chillington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 17 Oct 2024 at 14:03.

Devon County Council logo
Between
20 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Coleridge Lane

Devon County Council are proposing to carry out Highway repair and maintenance works on Coleridge Lane, Chillington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 17 Oct 2024 at 12:58.

South West Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Bennett Road

South West Water were proposing to carry out Utility repair and maintenance works on Bennett Road, Salcombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 14 Oct 2024 at 10:15.

South West Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Bennett Road

South West Water were proposing to carry out Utility repair and maintenance works on Bennett Road, Salcombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 24 Oct 2024 at 12:18.

Devon County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Rock Cottage To Rust Cottage Past The Post Office

Devon County Council are proposing to carry out Highway repair and maintenance works on Rock Cottage To Rust Cottage Past The Post Office, Kellaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 12 Dec 2024 at 11:20.

South West Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Island Street

South West Water are proposing to carry out Utility repair and maintenance works on Island Street, Salcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 6 Nov 2024 at 14:06.

South West Water logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Road Back Of South Sands Beach

South West Water are proposing to carry out Utility repair and maintenance works on Road Back Of South Sands Beach, Bolthead, Salcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 17 Oct 2024 at 09:29.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Green Park Way

BT are proposing to carry out Utility asset works on Green Park Way, Chillington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Nov 2024 at 10:53.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
A379 Coleridge Lane To Carehouse Cross

BT are proposing to carry out Utility asset works on A379 Coleridge Lane To Carehouse Cross, Chillington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Nov 2024 at 10:53.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Coleridge Lane

BT are proposing to carry out Utility asset works on Coleridge Lane, Chillington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Nov 2024 at 10:53.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
A379 Coleridge Lane To Carehouse Cross

BT are proposing to carry out Utility asset works on A379 Coleridge Lane To Carehouse Cross, Stokenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Nov 2024 at 10:53.

Western Power Distribution (South West) logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Galmpton To Malborough

Western Power Distribution (South West) are proposing to carry out Utility asset works on Galmpton To Malborough, Malborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Nov 2024 at 14:57.

Western Power Distribution (South West) logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Galmpton To Malborough

Western Power Distribution (South West) are proposing to carry out Utility asset works on Galmpton To Malborough, Malborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 7 Nov 2024 at 14:39.

Devon County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Road From West Alvington Cross To Ilbert Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From West Alvington Cross To Ilbert Road, West Alvington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 18 Nov 2024 at 15:57.

Devon County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Road From West Alvington Cross To Ilbert Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Road From West Alvington Cross To Ilbert Road, West Alvington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 19 Nov 2024 at 08:24.

South West Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Whitlocksworthy To Sutton Cross

South West Water were proposing to carry out Utility repair and maintenance works on Whitlocksworthy To Sutton Cross, South Milton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 27 Nov 2024 at 11:22.

Devon County Council logo
Between
24 Feb and 4 Mar 2025
Details
View Map
Share
Follow
East Portlemouth Corner To Mill Bay

Devon County Council are proposing to carry out Section 50 on East Portlemouth Corner To Mill Bay, East Portlemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 13 Dec 2024 at 15:49.

South West Water logo
Between
25 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Allenhayes Road

South West Water are proposing to carry out Utility repair and maintenance works on Allenhayes Road, Salcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 22 Oct 2024 at 09:50.

South West Water logo
Between
25 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Bennett Road

South West Water are proposing to carry out Utility repair and maintenance works on Bennett Road, Salcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 13 Nov 2024 at 12:03.

South West Water logo
Between
25 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Bennett Road

South West Water are proposing to carry out Utility repair and maintenance works on Bennett Road, Salcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 6 Nov 2024 at 15:34.

Devon County Council logo
Between
11 and 17 Mar 2025
Details
View Map
Share
Follow
Rock Cottage To Rust Cottage Past The Post Office

Devon County Council are proposing to carry out Highway repair and maintenance works on Rock Cottage To Rust Cottage Past The Post Office, Kellaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 11 Dec 2024 at 16:55.


Roadworks Map near to Bonaventure Road, SALCOMBE, TQ8 8BG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Bonaventure Road, SALCOMBE, TQ8 8BG (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South West Water logo
URGENT
  
BONAVENTURE ROAD 
(0.0 miles)
South West Water
Utility repair and maintenance works - Carriageway - Give and take
Complete
13 Dec 2024 09:51 - 11:24
0.0
Details
Share
2
South West Water logo
URGENT
  
KINGSALE ROAD 
(0.1 miles)
South West Water
Utility repair and maintenance works - Carriageway - Give and take
Complete
12 Dec 2024 09:30 - 13 Dec 2024 13:20
0.1
Details
Share
3
South West Water logo
URGENT
  
KINGSALE ROAD 
(0.1 miles)
South West Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
12 Dec 2024 09:30 - 13 Dec 2024 13:20
0.1
Details
Share
4
South West Water logo
URGENT
  
DEVON ROAD 
(0.2 miles)
South West Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 16 Dec 2024 12:48
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.2
Details
Share
Follow
5
Western Power Distribution (South West) logo
URGENT
  
CAMPERDOWN ROAD 
(0.3 miles)
Western Power Distribution (South West)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 17 Dec 2024 10:56
(Scheduled: 17 Dec 2024 - 25 Dec 2024)
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.