View current and future planned roadworks and road closures for Upper Wood Lane, TQ6 0DQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Upper Wood Lane, DARTMOUTH, TQ6 0DQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Upper Wood Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Devon County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Road From Swannaton Road To Brandaris

Devon County Council are carrying out Highway repair and maintenance works on Road From Swannaton Road To Brandaris, Warfleet, Dartmouth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 February 2024 at 08:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 6 Sep 2024 at 14:53.

South West Water logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Dartmouth Road

South West Water are carrying out Utility repair and maintenance works on Dartmouth Road, Churston, Paignton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2024 at 20:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Nov 2024 at 12:44.

Torbay Council logo
LONG TERM
Between
18 Nov 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Monksbridge Road

Torbay Council are proposing to carry out Highway repair and maintenance works on Monksbridge Road, Brixham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Torbay Council on 7 Oct 2024 at 09:39.

South West Water logo
Finishing
Today
Details
View Map
Share
Follow
Wood Lane

South West Water are carrying out Utility repair and maintenance works on Wood Lane, Kingswear.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 09:19 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 12 Dec 2024 at 12:50.

Western Power Distribution (South West) logo
Finishing
Friday
Details
View Map
Share
Follow
Beacon Road

Western Power Distribution (South West) are proposing to carry out New service connection on Beacon Road, Kingswear.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 5 Dec 2024 at 13:58.

Western Power Distribution (South West) logo
Finishing
Friday
Details
View Map
Share
Follow
Beacon Road

Western Power Distribution (South West) are carrying out New service connection on Beacon Road, Kingswear.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 12:14 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 16 Dec 2024 at 13:36.

Western Power Distribution (South West) logo
Finishing
Friday
Details
View Map
Share
Follow
Ridley Hill

Western Power Distribution (South West) are proposing to carry out New service connection on Ridley Hill, Kingswear.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 19 Sep 2024 at 08:26.

Western Power Distribution (South West) logo
Finishing
Friday
Details
View Map
Share
Church Hill

Western Power Distribution (South West) were proposing to carry out New service connection on Church Hill, Kingswear.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Dec 2024 at 16:10.

BT logo
Between
5 and 19 Jan 2025
Details
View Map
Share
Follow
Greenover Road

BT are proposing to carry out Utility asset works on Greenover Road, Brixham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Sep 2024 at 11:32.

BT logo
Between
5 and 19 Jan 2025
Details
View Map
Share
Follow
Greenover Road

BT are proposing to carry out Utility asset works on Greenover Road, Brixham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Sep 2024 at 14:48.

BT logo
Between
5 and 19 Jan 2025
Details
View Map
Share
Follow
Burton Street

BT are proposing to carry out Utility asset works on Burton Street, Brixham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Sep 2024 at 14:51.

BT logo
Between
5 and 19 Jan 2025
Details
View Map
Share
Follow
Burton Street

BT are proposing to carry out Utility asset works on Burton Street, Brixham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Oct 2024 at 14:04.

BT logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Road To Cotton Farm

BT are proposing to carry out Utility asset works on Road To Cotton Farm, Dartmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 7 Oct 2024 at 15:13.

BT logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Road To Cotton Farm

BT are proposing to carry out Utility asset works on Road To Cotton Farm, Dartmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 29 Oct 2024 at 08:40.

BT logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Road To Cotton Farm

BT are proposing to carry out Utility asset works on Road To Cotton Farm, Dartmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 15 Oct 2024 at 15:30.

Wales And West Utilities logo
Between
6 and 10 Jan 2025
Details
View Map
Share
South Ford Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on South Ford Road, Dartmouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 25 Sep 2024 at 12:01.

Wales And West Utilities logo
Between
6 and 10 Jan 2025
Details
View Map
Share
South Ford Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on South Ford Road, Dartmouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 27 Sep 2024 at 15:11.

Wales And West Utilities logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Milton Street

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Milton Street, Brixham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Sep 2024 at 14:02.

Wales And West Utilities logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Milton Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Milton Street, Brixham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 18 Sep 2024 at 11:56.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Newcomen Road

BT are proposing to carry out Utility asset works on Newcomen Road, Dartmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Jul 2024 at 14:18.

Western Power Distribution (South West) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Victoria Road

Western Power Distribution (South West) were proposing to carry out Utility repair and maintenance works on Victoria Road, Dartmouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 21 Nov 2024 at 14:09.

Western Power Distribution (South West) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Western Power Distribution (South West) are proposing to carry out Utility repair and maintenance works on Victoria Road, Dartmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 29 Nov 2024 at 09:29.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
South Town

BT are proposing to carry out Utility asset works on South Town, Dartmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 25 Jul 2024 at 14:17.

Devon County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Paignton Road

Devon County Council are proposing to carry out Highway repair and maintenance works on Paignton Road, Stoke Gabriel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 7 Nov 2024 at 14:55.

South West Water logo
Between
31 Jan and 4 Feb 2025
Details
View Map
Share
New Road

South West Water were proposing to carry out Utility repair and maintenance works on New Road, Brixham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 23 Oct 2024 at 14:14.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Above Town

BT are proposing to carry out Utility asset works on Above Town, Dartmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Nov 2024 at 08:42.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Above Town

BT are proposing to carry out Utility asset works on Above Town, Dartmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Nov 2024 at 08:42.

Western Power Distribution (South West) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Glenmore Road

Western Power Distribution (South West) are proposing to carry out New service connection on Glenmore Road, Brixham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 8 Nov 2024 at 16:41.

Western Power Distribution (South West) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Glenmore Road

Western Power Distribution (South West) are proposing to carry out New service connection on Glenmore Road, Brixham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Nov 2024 at 14:52.

South West Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
King Street

South West Water are proposing to carry out Utility repair and maintenance works on King Street, Brixham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 1 Nov 2024 at 13:01.

South West Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
King Street

South West Water are proposing to carry out Utility repair and maintenance works on King Street, Brixham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 13 Nov 2024 at 14:23.

South West Water logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Riverside Road

South West Water are proposing to carry out Utility repair and maintenance works on Riverside Road, Dittisham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 29 Nov 2024 at 09:36.

South West Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Drew Street

South West Water were proposing to carry out Utility repair and maintenance works on Drew Street, Brixham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 27 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 8 Nov 2024 at 10:25.

Western Power Distribution (South West) logo
Between
26 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Victoria Road

Western Power Distribution (South West) are proposing to carry out Utility repair and maintenance works on Victoria Road, Dartmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 25 Nov 2024 at 11:26.

Western Power Distribution (South West) logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Follow
Lake Street

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Lake Street, Dartmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 13 Dec 2024 at 12:09.

Western Power Distribution (South West) logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Lake Street

Western Power Distribution (South West) were proposing to carry out Disconnection or alteration of supply on Lake Street, Dartmouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 11 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Dec 2024 at 12:27.

Devon County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Forder To Eastdown

Devon County Council are proposing to carry out Highway repair and maintenance works on Forder To Eastdown, Blackawton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 23 Oct 2024 at 10:55.

Devon County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Forder To Eastdown

Devon County Council are proposing to carry out Highway repair and maintenance works on Forder To Eastdown, Blackawton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 22 Oct 2024 at 15:34.

BT logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Above Town

BT are proposing to carry out Utility asset works on Above Town, Dartmouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Dec 2024 at 12:22.

Devon County Council logo
Between
13 and 21 Mar 2025
Details
View Map
Share
Follow
Merrifield Cross To Orestone

Devon County Council are proposing to carry out Highway repair and maintenance works on Merrifield Cross To Orestone, Hansel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Devon County Council on 11 Dec 2024 at 16:01.


Roadworks Map near to Upper Wood Lane, DARTMOUTH, TQ6 0DQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Upper Wood Lane, DARTMOUTH, TQ6 0DQ (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South West Water logo
URGENT
  
WOOD LANE 
(0.3 miles)
South West Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 12 Dec 2024 09:19
(Scheduled: 12 Dec 2024 - 18 Dec 2024)
0.3
Details
Share
Follow
2
Western Power Distribution (South West) logo
MAJOR
  
RIDLEY HILL 
(0.3 miles)
Western Power Distribution (South West)
New service connection - Carriageway - Road closure
Planned
Scheduled: 16 Dec 2024 - 20 Dec 2024
0.3
Details
Share
Follow
3
Western Power Distribution (South West) logo
MAJOR
  
BEACON ROAD 
(0.4 miles)
Western Power Distribution (South West)
New service connection - Carriageway - Road closure
Planned
Scheduled: 16 Dec 2024 - 20 Dec 2024
0.4
Details
Share
Follow
4
Western Power Distribution (South West) logo
MAJOR
  
BEACON ROAD 
(0.4 miles)
Western Power Distribution (South West)
New service connection - Carriageway - Road closure
In Progress
Since: 16 Dec 2024 12:14
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.4
Details
Share
Follow
5
Western Power Distribution (South West) logo
MAJOR
  
CHURCH HILL 
(0.4 miles)
Western Power Distribution (South West)
New service connection - Carriageway - Road closure
Cancelled
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.4
Details
Share
6
Western Power Distribution (South West) logo
MAJOR
  
CHURCH HILL 
(0.4 miles)
Western Power Distribution (South West)
New service connection - Carriageway - Some carriageway incursion
Planned
Scheduled: 16 Dec 2024 - 20 Dec 2024
0.4
Details
Share
Follow
7
Western Power Distribution (South West) logo
MAJOR
  
CHURCH HILL 
(0.4 miles)
Western Power Distribution (South West)
New service connection - Carriageway - Some carriageway incursion
In Progress
Since: 16 Dec 2024 12:34
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.4
Details
Share
Follow
8
Devon County Council logo
URGENT
  
ROAD FROM SWANNATON ROAD TO BRANDARIS, WARFLEET 
(0.7 miles)
Devon County Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 23 Feb 2024 08:00
(Scheduled: 23 Feb 2024 - 31 Mar 2025)
0.7
Details
Share
Follow
9
Western Power Distribution (South West) logo
COOMBE ROAD 
(0.7 miles)
Western Power Distribution (South West)
New service connection - Footway - Some carriageway incursion
Cancelled
(Scheduled: 9 Dec 2024 - 18 Dec 2024)
0.7
Details
Share
10
Western Power Distribution (South West) logo
COOMBE ROAD 
(0.7 miles)
Western Power Distribution (South West)
New service connection - Footway - Lane closure
Complete
9 Dec 2024 04:00 - 12 Dec 2024 13:56
0.7
Details
Share