ROADWORKS SUMMARY
The Slade, TUNBRIDGE WELLS, TN3 8HJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Slade, TN3 8HJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Slade, TUNBRIDGE WELLS, TN3 8HJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Slade are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Fairglen Road

South East Water are proposing to carry out Utility asset works on Fairglen Road, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 23 Aug 2024 at 11:56.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Buckhurst Lane

South East Water are proposing to carry out Utility asset works on Buckhurst Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 23 Aug 2024 at 11:43.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Wadhurst Road

South East Water are proposing to carry out Utility repair and maintenance works on Wadhurst Road, Mark Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 24 Jul 2024 at 17:32.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Best Beech Hill

South East Water were proposing to carry out Utility asset works on Best Beech Hill, Wadhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 28 Aug 2024 at 14:32.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Best Beech Hill

South East Water were proposing to carry out Utility repair and maintenance works on Best Beech Hill, Wadhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 23 Aug 2024 at 11:40.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Best Beech Lane

South East Water are proposing to carry out Utility repair and maintenance works on Best Beech Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 6 Jun 2024 at 14:24.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Mayfield Lane

South East Water are proposing to carry out Utility asset works on Mayfield Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 23 Aug 2024 at 14:11.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Tidebrook Road

South East Water are proposing to carry out Utility asset works on Tidebrook Road, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 23 Aug 2024 at 11:50.

South East Water logo
LONG TERM
Until
24 Mar 2025
Details
View Map
Share
Follow
Best Beech Lane

South East Water are carrying out Utility asset works on Best Beech Lane, Wadhurst.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 07:30 and could run through until 24 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 6 Nov 2024 at 12:59.

South East Water logo
LONG TERM
Until
24 Mar 2025
Details
View Map
Share
Follow
Best Beech Hill

South East Water are carrying out Utility asset works on Best Beech Hill, Wadhurst.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 07:30 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 28 Oct 2024 at 07:46.

South East Water logo
LONG TERM
Between
11 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Fairglen Road

South East Water are proposing to carry out Utility asset works on Fairglen Road, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 30 Sep 2024 at 11:24.

South East Water logo
LONG TERM
Between
11 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Buckhurst Lane

South East Water are proposing to carry out Utility asset works on Buckhurst Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 30 Sep 2024 at 11:22.

UK Power Networks South Eastern logo
Between
18 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Grovehurst Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Grovehurst Lane, Horsmonden, Tonbridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 3 December 2024. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Aug 2024 at 07:32.

UK Power Networks South Eastern logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Grovehurst Lane

UK Power Networks South Eastern are carrying out New service connection on Grovehurst Lane, Horsmonden, Tonbridge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 14:00 and could run through until 6 December 2024. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 15:12.

South East Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Spelmonden Road

South East Water are carrying out Utility repair and maintenance works on Spelmonden Road, Horsmonden, Tonbridge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 14:30 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by South East Water on 20 Nov 2024 at 07:56.

South East Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Sheepstreet Lane

South East Water are carrying out Utility repair and maintenance works on Sheepstreet Lane, Etchingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 02:40 and could run through until 26 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 21 Nov 2024 at 14:46.

UK Power Networks South Eastern logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Sheepstreet Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Sheepstreet Lane, Etchingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2024 at 13:27.

East Sussex County Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Stonegate Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Stonegate Road, Stonegate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 19 Nov 2024 at 10:05.

East Sussex County Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Bardown Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Bardown Road, Stonegate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 19 Nov 2024 at 10:05.

UK Power Networks South Eastern logo
Between
8 and 13 Dec 2024
Details
View Map
Share
Follow
Brenchley Road

UK Power Networks South Eastern are proposing to carry out New service connection on Brenchley Road, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Nov 2024 at 14:04.

UK Power Networks South Eastern logo
Between
8 and 13 Dec 2024
Details
View Map
Share
Follow
Brenchley Road

UK Power Networks South Eastern are proposing to carry out New service connection on Brenchley Road, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 11:34.

Kent County Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Petteridge Lane

Kent County Council are proposing to carry out Highway improvement works on Petteridge Lane, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 11 Oct 2024 at 07:36.

Kent County Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Petteridge Lane

Kent County Council are proposing to carry out Highway improvement works on Petteridge Lane, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 19 Sep 2024 at 15:47.

UK Power Networks South Eastern logo
Between
10 and 21 Jan 2025
Details
View Map
Share
Follow
Coppers Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Coppers Lane, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 15:07.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Crook Road

UK Power Networks South Eastern are proposing to carry out New service connection on Crook Road, Brenchley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 14:20.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Crook Road

UK Power Networks South Eastern are proposing to carry out New service connection on Crook Road, Brenchley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Oct 2024 at 12:38.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Crook Road

UK Power Networks South Eastern are proposing to carry out New service connection on Crook Road, Brenchley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 08:05.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Furnace Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Furnace Lane, Brenchley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 08:07.

UK Power Networks South Eastern logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Coppers Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Coppers Lane, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 10:02.

UK Power Networks South Eastern logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Sheepstreet Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Sheepstreet Lane, Etchingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Oct 2024 at 12:31.

South East Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Bardown Road

South East Water are proposing to carry out New service connection on Bardown Road, Stonegate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 1 Oct 2024 at 09:16.

South East Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Bardown Road

South East Water are proposing to carry out New service connection on Bardown Road, Stonegate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 10 Oct 2024 at 11:16.

UK Power Networks South Eastern logo
Between
1 and 28 Feb 2025
Details
View Map
Share
Follow
Furnace Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Furnace Lane, Brenchley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Oct 2024 at 12:28.

UK Power Networks South Eastern logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Sheepstreet Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Sheepstreet Lane, Etchingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 10:01.

South East Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Blue Coats Lane

South East Water are proposing to carry out Utility repair and maintenance works on Blue Coats Lane, Goudhurst, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 7 Nov 2024 at 11:06.

South East Water logo
LONG TERM
Between
3 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Wadhurst Road

South East Water are proposing to carry out Utility asset works on Wadhurst Road, Mark Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 23 Sep 2024 at 16:14.

South East Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Newbury Lane

South East Water are proposing to carry out New service connection on Newbury Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 11 Nov 2024 at 11:39.

East Sussex County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Wenbans Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Wenbans Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 12 Nov 2024 at 10:23.

South East Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Myskyns Road

South East Water are proposing to carry out New service connection on Myskyns Road, Stonegate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 31 Oct 2024 at 16:16.

South East Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Myskyns Road

South East Water are proposing to carry out New service connection on Myskyns Road, Stonegate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 1 Nov 2024 at 11:33.

South East Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Myskyns Road

South East Water are proposing to carry out New service connection on Myskyns Road, Stonegate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 15 Nov 2024 at 14:46.

South East Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Sheepstreet Lane

South East Water were proposing to carry out New service connection on Sheepstreet Lane, Etchingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by South East Water on 15 Nov 2024 at 11:57.


Roadworks Map near to The Slade, TUNBRIDGE WELLS, TN3 8HJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 02:24
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Slade, TUNBRIDGE WELLS, TN3 8HJ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.