ROADWORKS SUMMARY
Chafford Lane, TUNBRIDGE WELLS, TN3 0SP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Chafford Lane, TN3 0SP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Chafford Lane, TUNBRIDGE WELLS, TN3 0SP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Chafford Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
7 Apr 2025 and 19 Jul 2026
Details
View Map
Share
Upper Grosvenor Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Upper Grosvenor Road, Royal Tunbridge Wells.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 19 July 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Feb 2025 at 14:15.

Southern Gas Networks logo
LONG TERM
Between
7 Apr 2025 and 17 May 2026
Details
View Map
Share
Upper Grosvenor Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Upper Grosvenor Road, Royal Tunbridge Wells.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 17 May 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 15:50.

Southern Gas Networks logo
LONG TERM
Between
7 Apr and 16 Nov 2025
Details
View Map
Share
Follow
Silverdale Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Silverdale Lane, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 11:18.

Southern Gas Networks logo
LONG TERM
Between
7 Apr and 16 Nov 2025
Details
View Map
Share
Follow
Queens Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queens Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 14:37.

Southern Gas Networks logo
LONG TERM
Between
7 Apr and 16 Nov 2025
Details
View Map
Share
Follow
Hasletts Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hasletts Close, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 13:13.

Southern Gas Networks logo
LONG TERM
Between
7 Apr 2025 and 5 Jul 2026
Details
View Map
Share
Follow
Upper Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grosvenor Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 5 July 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 15:59.

Southern Gas Networks logo
LONG TERM
Between
5 May and 30 Nov 2025
Details
View Map
Share
Follow
Upper Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grosvenor Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Mar 2025 at 15:27.

East Sussex County Council logo
LONG TERM
Between
5 May and 30 Sep 2025
Details
View Map
Share
Fairview Lane

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Fairview Lane, Broadwater Forest, Eridge Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 7 Mar 2025 at 11:34.

Southern Gas Networks logo
LONG TERM
Between
5 May and 5 Oct 2025
Details
View Map
Share
Follow
Upper Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grosvenor Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 07:59.

Southern Gas Networks logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Upper Grosvenor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Upper Grosvenor Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 08:00 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 09:45.

Southern Gas Networks logo
LONG TERM
Between
11 May 2025 and 5 Jul 2026
Details
View Map
Share
Grosvenor Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Grosvenor Road, Royal Tunbridge Wells.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 May 2025 and run through until 5 July 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 10:00.

Southern Gas Networks logo
LONG TERM
Between
11 May 2025 and 5 Jul 2026
Details
View Map
Share
Hanover Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hanover Road, Royal Tunbridge Wells.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 May 2025 and run through until 5 July 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 09:59.

Kent County Council logo
LONG TERM
Between
27 May 2025 and 3 Jun 2026
Details
View Map
Share
Follow
Prospect Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Prospect Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 30 Jan 2025 at 16:07.

East Sussex County Council logo
LONG TERM
Between
5 Jun and 31 Oct 2025
Details
View Map
Share
Bunny Lane

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Bunny Lane, Frant.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 June 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 7 Mar 2025 at 11:47.

East Sussex County Council logo
LONG TERM
Between
5 Jun and 31 Oct 2025
Details
View Map
Share
Bunny Lane

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Bunny Lane, Frant.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 June 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 22 Apr 2025 at 09:03.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Church Hill

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Church Hill, Crowborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 22 Apr 2025 at 10:44.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Fairview Lane

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Fairview Lane, Broadwater Forest, Eridge Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 22 Apr 2025 at 08:55.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Fairview Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Fairview Lane, Broadwater Forest, Eridge Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Sussex County Council on 2 Apr 2025 at 08:40.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Hendal Hill

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Hendal Hill, Groombridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 22 Apr 2025 at 09:28.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Hendal Hill

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Hendal Hill, Groombridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Sussex County Council on 31 Mar 2025 at 13:08.

East Sussex County Council logo
LONG TERM
Until
1 Oct 2025
Details
View Map
Share
Follow
Eridge Road

East Sussex County Council are carrying out Highway repair and maintenance works on Eridge Road, Eridge Green.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 June 2025 at 21:00 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 1 Jul 2025 at 13:37.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 1 Oct 2025
Details
View Map
Share
Bunny Lane

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Bunny Lane, Frant.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 12 May 2025 at 18:14.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 29 Sep 2025
Details
View Map
Share
Bunny Lane

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Bunny Lane, Frant.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 29 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 12 May 2025 at 18:21.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 1 Oct 2025
Details
View Map
Share
Bunny Lane

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Bunny Lane, Frant.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 16 May 2025 at 13:53.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Bunny Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Bunny Lane, Frant.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Sussex County Council on 29 May 2025 at 12:43.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Cherry Gardens Hill

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Cherry Gardens Hill, Groombridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 22 Apr 2025 at 09:28.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Cherry Gardens Hill

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Cherry Gardens Hill, Groombridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Sussex County Council on 31 Mar 2025 at 13:06.

East Sussex County Council logo
LONG TERM
Until
1 Oct 2025
Details
View Map
Share
Follow
Bunny Lane

East Sussex County Council are carrying out Highway repair and maintenance works on Bunny Lane, Frant.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 June 2025 at 20:00 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 10 Jul 2025 at 10:36.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Church Hill

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Church Hill, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Sussex County Council on 31 Mar 2025 at 13:11.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Hendal Hill

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Hendal Hill, Groombridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 7 Mar 2025 at 11:58.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Eridge Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Eridge Road, Eridge Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by East Sussex County Council on 9 Jun 2025 at 16:37.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 1 Oct 2025
Details
View Map
Share
Eridge Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Eridge Road, Eridge Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 16 May 2025 at 14:02.

East Sussex County Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Eridge Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Eridge Road, Eridge Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 22 Apr 2025 at 09:18.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Silverdale Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Silverdale Lane, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 08:12.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Queens Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queens Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Mar 2025 at 06:33.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 30 Nov 2025
Details
View Map
Share
Follow
Queens Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queens Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Mar 2025 at 15:28.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Hasletts Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hasletts Close, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 08:12.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 23 Nov 2025
Details
View Map
Share
Follow
Upper Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grosvenor Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jul 2025 at 16:36.

Southern Gas Networks logo
LONG TERM
Until
23 Nov 2025
Details
View Map
Share
Follow
Upper Grosvenor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Upper Grosvenor Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 August 2025 at 12:30 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 07:48.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Dunstan Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dunstan Road, Royal Tunbridge Wells.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jul 2025 at 16:12.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Forest Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Forest Road, Royal Tunbridge Wells.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 07:06.

Southern Gas Networks logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Forest Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Forest Road, Royal Tunbridge Wells.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 07:30 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 11:34.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 24 Oct 2025
Details
View Map
Share
Bayham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bayham Road, Royal Tunbridge Wells.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 10:45.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Bayham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bayham Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 08:46.

Southern Gas Networks logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Bayham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bayham Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 07:30 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 13:05.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Grosvenor Bridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grosvenor Bridge, Royal Tunbridge Wells.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jul 2025 at 09:45.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 13 Oct 2025
Details
View Map
Share
Broadmead

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Broadmead, Royal Tunbridge Wells.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 13 October 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 13:41.

Southern Gas Networks logo
LONG TERM
Between
1 Sep 2025 and 16 Jan 2026
Details
View Map
Share
Broadwater Down

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Broadwater Down, Royal Tunbridge Wells.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 16 January 2026. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 13:41.

East Sussex County Council logo
LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Holtye Road

East Sussex County Council are carrying out roadworks on Holtye Road, Hammerwood.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 September 2025 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 8 Sep 2025 at 07:14.

South East Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Coppings Road

South East Water are carrying out Utility repair and maintenance works on Coppings Road, Leigh.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 09:53 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 18 Sep 2025 at 09:30.

Southern Gas Networks logo
Until
15 Oct 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Park Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 08:30 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2025 at 09:05.

South East Water logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Hartfield Road

South East Water are proposing to carry out New service connection on Hartfield Road, Cowden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 16 Apr 2025 at 08:16.

Southern Gas Networks logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jul 2025 at 10:00.

Virgin Media logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Dowding Way

Virgin Media are proposing to carry out Utility asset works on Dowding Way, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 17 Mar 2025 at 11:44.

East Sussex County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Whitehouse Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Whitehouse Lane, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 12 May 2025 at 13:27.

East Sussex County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Whitehouse Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Whitehouse Lane, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 20 May 2025 at 13:37.

Southern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Broadwater Rise

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Broadwater Rise, Royal Tunbridge Wells.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 13:42.

UK Power Networks South Eastern logo
LONG TERM
Between
13 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Penshurst Road

UK Power Networks South Eastern are proposing to carry out New service connection on Penshurst Road, Poundsbridge, Speldhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Aug 2025 at 07:17.

Vattenfall Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Western Road

Vattenfall Networks are proposing to carry out New service connection on Western Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vattenfall Networks on 26 Jun 2025 at 12:05.

South East Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Kingswood Road

South East Water are proposing to carry out New service connection on Kingswood Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 1 Jul 2025 at 07:26.

South East Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Kingswood Road

South East Water are proposing to carry out New service connection on Kingswood Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 1 Jul 2025 at 12:09.

Network Rail logo
LONG TERM
Between
27 Oct and 5 Dec 2025
Details
View Map
Share
Follow
Warwick Park

Network Rail are proposing to carry out roadworks on Warwick Park, Royal Tunbridge Wells.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Sep 2025 at 14:41.

Southern Gas Networks logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Dunstan Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dunstan Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 15:00.

Kent County Council logo
Between
31 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Rusthall High Street

Kent County Council are proposing to carry out Highway improvement works on Rusthall High Street, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Jul 2025 at 13:56.

Kent County Council logo
Between
31 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Rusthall Road

Kent County Council are proposing to carry out Highway improvement works on Rusthall Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Jul 2025 at 13:56.

Kent County Council logo
Between
31 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Longmeads

Kent County Council are proposing to carry out Highway improvement works on Longmeads, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Jul 2025 at 13:58.

Southern Gas Networks logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Follow
Meadow Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Meadow Road, Off Upper Grosvenor Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jul 2025 at 14:14.

Southern Gas Networks logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Follow
Meadow Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Meadow Road, Off Upper Grosvenor Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jul 2025 at 09:59.

Vattenfall Networks logo
Between
6 and 19 Nov 2025
Details
View Map
Share
Follow
Western Road

Vattenfall Networks are proposing to carry out New service connection on Western Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vattenfall Networks on 7 Jul 2025 at 15:34.

Kent County Council logo
Between
7 and 13 Nov 2025
Details
View Map
Share
Follow
Longmeads

Kent County Council are proposing to carry out Highway improvement works on Longmeads, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Jul 2025 at 15:08.

Kent County Council logo
Between
7 and 13 Nov 2025
Details
View Map
Share
Follow
Rusthall Road

Kent County Council are proposing to carry out Highway improvement works on Rusthall Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Jul 2025 at 15:22.

Kent County Council logo
Between
7 and 13 Nov 2025
Details
View Map
Share
Follow
Rusthall High Street

Kent County Council are proposing to carry out Highway improvement works on Rusthall High Street, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Jul 2025 at 15:21.

National Highways logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
Quarry Hill Road

National Highways are proposing to carry out Works for road purposes on Quarry Hill Road, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Sep 2025 at 16:00.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Dunstan Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Dunstan Road, Royal Tunbridge Wells.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 10:00.

Southern Gas Networks logo
LONG TERM
Between
17 Nov 2025 and 5 Jul 2026
Details
View Map
Share
Park Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Park Road, Royal Tunbridge Wells.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 5 July 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 10:01.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Grosvenor Bridge

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Grosvenor Bridge, Royal Tunbridge Wells.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 10:00.

Southern Gas Networks logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Castle Street

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Castle Street, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 15:38.

Southern Gas Networks logo
LONG TERM
Between
17 Nov 2025 and 5 Jul 2026
Details
View Map
Share
Meadow Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Meadow Road, Off Upper Grosvenor Road, Royal Tunbridge Wells.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 5 July 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 10:00.

UK Power Networks South Eastern logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
The Green

UK Power Networks South Eastern are proposing to carry out Utility asset works on The Green, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Aug 2025 at 14:21.

UK Power Networks South Eastern logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Poundsbridge

UK Power Networks South Eastern are proposing to carry out New service connection on Poundsbridge, Penshurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Aug 2025 at 07:33.

UK Power Networks South Eastern logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Poundsbridge

UK Power Networks South Eastern are proposing to carry out New service connection on Poundsbridge, Penshurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Aug 2025 at 07:18.

East Sussex County Council logo
Between
8 and 10 Dec 2025
Details
View Map
Share
Follow
Cherry Gardens Hill

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Cherry Gardens Hill, Groombridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 3 Sep 2025 at 14:39.

East Sussex County Council logo
Between
8 and 10 Dec 2025
Details
View Map
Share
Cherry Gardens Hill

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Cherry Gardens Hill, Groombridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 10 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 12 Sep 2025 at 14:05.

Network Rail logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Tonbridge Road

Network Rail are proposing to carry out Works for Rail Purposes on Tonbridge Road, Bough Beech.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Sep 2025 at 06:17.

UK Power Networks South Eastern logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Woodside Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Woodside Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Sep 2025 at 14:23.


Roadworks Map near to Chafford Lane, TUNBRIDGE WELLS, TN3 0SP (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 22:33
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Chafford Lane, TUNBRIDGE WELLS, TN3 0SP (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.