ROADWORKS SUMMARY
Woodchurch, ASHFORD, TN26 3PJ
Introduction
View current and future planned roadworks and road closures for TN26 3PJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Woodchurch, ASHFORD, TN26 3PJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
7 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Gladstone Road, Willesborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:30 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 15:43.
4 Mar 2025
Kent County Council are carrying out Highway improvement works on Hamstreet Road, Ruckinge.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 December 2024 at 00:00 and could run through until 4 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 14 Nov 2024 at 13:19.
28 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Hampden Lane, Ashford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2025 at 09:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Jan 2025 at 19:36.
6 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hampden Lane, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 May 2024 at 14:27.
Tomorrow
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Austin Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 May 2024 at 07:52.
Today
South East Water are proposing to carry out New service connection on Beaver Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 22 Nov 2024 at 12:24.
Tuesday
Southern Water are proposing to carry out Utility repair and maintenance works on Beaver Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 19 Dec 2024 at 17:56.
Tuesday
Southern Water are proposing to carry out Utility repair and maintenance works on Beaver Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 11:59.
Wednesday
South East Water are proposing to carry out New service connection on Bethersden Road, Woodchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 9 Dec 2024 at 09:12.
3 and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsnorth Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 May 2024 at 14:35.
4 and 7 Feb 2025
South East Water are proposing to carry out New service connection on Hamstreet Road, Ruckinge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 22 Jan 2025 at 18:57.
4 and 7 Feb 2025
South East Water are proposing to carry out New service connection on Hamstreet Road, Ruckinge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 10 Dec 2024 at 11:43.
10 Feb and 31 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Stanhope Road, Stanhope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 10 Jan 2025 at 14:36.
10 and 18 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Appledore Road, Tenterden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 17:14.
10 and 18 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Appledore Road, Tenterden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Nov 2024 at 13:01.
10 Feb and 31 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Stanhope Road, Stanhope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 10 Jan 2025 at 16:09.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Warehorne Road, Hamstreet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Nov 2024 at 09:49.
17 and 19 Feb 2025
Kent County Council are proposing to carry out Section 50 on Appledore Road, Tenterden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 6 Dec 2024 at 11:18.
17 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsnorth Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 14:28.
19 and 21 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Appledore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Jan 2025 at 09:51.
19 and 21 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Appledore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 22 Nov 2024 at 09:47.
20 and 28 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Appledore Road, Tenterden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Jan 2025 at 15:43.
24 and 26 Feb 2025
South East Water are proposing to carry out New service connection on Brook Street, Woodchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 11 Dec 2024 at 10:54.
3 Mar and 23 Jun 2025
Kent County Council are proposing to carry out Highway improvement works on Lower Road, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 31 Dec 2024 at 09:52.
3 and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gladstone Road, Willesborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 11:26.
3 and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gladstone Road, Willesborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 12:42.
3 and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cudworth Road, Willesborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 11:49.
3 and 21 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Lower Road, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 31 Dec 2024 at 14:24.
3 and 21 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Lower Road, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 4 Dec 2024 at 16:55.
3 and 21 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Lower Road, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 6 Dec 2024 at 08:59.
3 and 7 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Warehorne Road, Hamstreet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Dec 2024 at 10:43.
3 and 21 Mar 2025
Kent County Council were proposing to carry out Highway improvement works on Lower Road, Stone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 19 Dec 2024 at 14:14.
3 and 21 Mar 2025
Kent County Council are proposing to carry out Highway improvement works on Newchurch Road, Bilsington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 13 Jan 2025 at 15:03.
10 and 12 Mar 2025
South East Water are proposing to carry out New service connection on Bethersden Road, Woodchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 19 Dec 2024 at 16:49.
11 and 13 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Coldblow, Woodchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 7 Jan 2025 at 15:48.
11 and 13 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Coldblow, Woodchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 20 Dec 2024 at 08:04.
17 Mar and 3 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsnorth Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 May 2024 at 14:54.
18 and 20 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Snargate Road, Warehorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 3 Jan 2025 at 10:31.
18 and 20 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Snargate Road, Warehorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 23 Dec 2024 at 13:32.
18 and 20 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Snargate Road, Warehorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 20 Dec 2024 at 10:48.
31 Mar and 9 Apr 2025
Southern Gas Networks are proposing to carry out New service connection on The Martins, High Halden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 31 Dec 2024 at 14:12.
7 and 11 Apr 2025
Kent County Council are proposing to carry out Section 50 on Church Hill, High Halden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kent County Council on 30 Jan 2025 at 14:15.
7 and 17 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsnorth Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 14:42.
14 and 18 Apr 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Warehorne Road, Hamstreet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Jan 2025 at 21:17.
18 and 21 Apr 2025
BT are proposing to carry out Utility asset works on Stone Cross Road, Kent, Bilsington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2025 and could run through until 21 April 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 20 Jan 2025 at 15:44.
18 and 21 Apr 2025
BT are proposing to carry out Utility asset works on Stone Cross Road, Kent, Bilsington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2025 and could run through until 21 April 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 22 Jan 2025 at 19:02.
18 and 21 Apr 2025
BT are proposing to carry out Utility asset works on Church Road, Kent, Warehorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2025 and could run through until 21 April 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 22 Jan 2025 at 19:12.
18 and 21 Apr 2025
BT are proposing to carry out Utility asset works on Church Road, Kent, Warehorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2025 and could run through until 21 April 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 20 Jan 2025 at 14:24.
22 and 24 Apr 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Beaver Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 27 Jan 2025 at 10:38.
28 Apr and 2 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Warehorne Road, Hamstreet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Jan 2025 at 21:17.
Roadworks Map near to Woodchurch, ASHFORD, TN26 3PJ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Woodchurch, ASHFORD, TN26 3PJ (1 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.