ROADWORKS SUMMARY
Ruckinge, ASHFORD, TN26 2NR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for TN26 2NR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ruckinge, ASHFORD, TN26 2NR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Kent County Council logo
LONG TERM
Until
12 Apr 2025
Details
View Map
Share
Follow
Wenhams Lane

Kent County Council are carrying out Highway improvement works on Wenhams Lane, Old Romney.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2024 at 07:25 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 1 Nov 2024 at 13:11.

Southern Gas Networks logo
LONG TERM
Between
21 Oct 2024 and 14 Mar 2025
Details
View Map
Share
Cycle Track From Turner Close To Cudworth Road

Southern Gas Networks were proposing to carry out roadworks on Cycle Track From Turner Close To Cudworth Road, Ashford.

These works were categorised as Major.

The works were originally planned to start 21 October 2024 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:20.

Kent County Council logo
LONG TERM
Between
28 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Crowbridge Road

Kent County Council are proposing to carry out Highway improvement works on Crowbridge Road, Willesborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 2 Oct 2024 at 15:20.

Kent County Council logo
LONG TERM
Between
28 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Crowbridge Road

Kent County Council are proposing to carry out Section 50 on Crowbridge Road, Willesborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 26 Sep 2024 at 15:02.

Kent County Council logo
LONG TERM
Between
28 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Crowbridge Road

Kent County Council are proposing to carry out Section 50 on Crowbridge Road, Willesborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 2 Oct 2024 at 15:18.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cudworth Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Cudworth Road, Willesborough.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 08:00 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:20.

Southern Gas Networks logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Gladstone Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Gladstone Road, Willesborough.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:30 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:09.

Southern Gas Networks logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Wotton Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wotton Road, Ashford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:31.

Southern Gas Networks logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Wotton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wotton Road, Ashford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 May 2024 at 07:49.

South East Water logo
Finishing
Friday
Details
View Map
Share
Follow
Magpie Hall Road

South East Water are carrying out Utility repair and maintenance works on Magpie Hall Road, Kingsnorth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:10 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 22 Nov 2024 at 11:29.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Wey Street

Kent County Council are proposing to carry out Highway improvement works on Wey Street, Snave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 30 Jul 2024 at 12:36.

Kent County Council logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Wey Street

Kent County Council are carrying out Highway improvement works on Wey Street, Snave.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 25 Nov 2024 at 09:04.

Kent County Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Tillery Lane

Kent County Council are proposing to carry out Highway improvement works on Tillery Lane, Brookland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 27 Nov 2024 at 06:13.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Wotton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wotton Road, Ashford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 07:33.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Wotton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wotton Road, Ashford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 3 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 May 2024 at 07:48.

Kent County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Church Lane

Kent County Council are proposing to carry out Highway improvement works on Church Lane, Shadoxhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 19 Nov 2024 at 10:44.

Kent County Council logo
LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Follow
Hamstreet Road

Kent County Council are carrying out Highway improvement works on Hamstreet Road, Ruckinge.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 00:00 and could run through until 4 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 14 Nov 2024 at 13:19.

UK Power Networks South Eastern logo
Between
6 and 13 Dec 2024
Details
View Map
Share
Follow
Warehorne Road

UK Power Networks South Eastern are proposing to carry out New service connection on Warehorne Road, Hamstreet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Oct 2024 at 10:56.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Mead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Road, Willesborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2024 at 11:33.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Gladstone Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gladstone Road, Willesborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2024 at 11:29.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hampden Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hampden Lane, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:54.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hampden Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hampden Lane, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2024 at 14:27.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Austin Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Austin Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2024 at 07:52.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Mead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Road, Willesborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2024 at 11:32.

UK Power Networks South Eastern logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Warehorne Road

UK Power Networks South Eastern are proposing to carry out New service connection on Warehorne Road, Hamstreet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 12:22.

Kent County Council logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Newchurch Road

Kent County Council are proposing to carry out Highway improvement works on Newchurch Road, Bilsington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 4 Nov 2024 at 16:04.

South East Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Brook Street

South East Water are proposing to carry out New service connection on Brook Street, Woodchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 6 Nov 2024 at 16:39.

South East Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Brook Street

South East Water are proposing to carry out New service connection on Brook Street, Woodchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 22 Nov 2024 at 08:48.

South East Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Brook Street

South East Water were proposing to carry out New service connection on Brook Street, Woodchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by South East Water on 16 Oct 2024 at 09:12.

BT logo
Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Snargate Road

BT are proposing to carry out Utility asset works on Snargate Road, Kenardington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Oct 2024 at 14:41.

BT logo
Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Snargate Road

BT are proposing to carry out Utility asset works on Snargate Road, Kenardington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Oct 2024 at 16:50.

Kent County Council logo
LONG TERM
Between
3 Feb and 13 Apr 2025
Details
View Map
Share
Follow
Frogmore Lane

Kent County Council are proposing to carry out Highway improvement works on Frogmore Lane, Bonnington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 13 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 6 Nov 2024 at 09:10.

Southern Gas Networks logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Kingsnorth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsnorth Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2024 at 14:35.

Southern Gas Networks logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Kingsnorth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsnorth Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:55.

South East Water logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Hamstreet Road

South East Water are proposing to carry out New service connection on Hamstreet Road, Ruckinge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 12 Nov 2024 at 12:25.

BT logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Cherry Glebe

BT are proposing to carry out Utility repair and maintenance works on Cherry Glebe, Mersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Nov 2024 at 15:35.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Warehorne Road

UK Power Networks South Eastern are proposing to carry out New service connection on Warehorne Road, Hamstreet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Nov 2024 at 09:49.

BT logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Blind Lane

BT are proposing to carry out Utility repair and maintenance works on Blind Lane, Mersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Nov 2024 at 14:25.

Network Rail logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Appledore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Nov 2024 at 09:47.


Roadworks Map near to Ruckinge, ASHFORD, TN26 2NR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 20:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ruckinge, ASHFORD, TN26 2NR (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South East Water logo
URGENT
  
COCK LANE 
(0.7 miles)
South East Water
Utility repair and maintenance works - Footway - Multi-way signals
Complete
22 Nov 2024 12:39 - 26 Nov 2024 15:50
0.7
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.