ROADWORKS SUMMARY
Belvedere Row, ASHFORD, TN25 6FD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Belvedere Row, TN25 6FD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Belvedere Row, ASHFORD, TN25 6FD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Belvedere Row are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

South East Water logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
A2070 From M20 J10 Roundabout To J A2042 S

South East Water are carrying out Utility repair and maintenance works on A2070 From M20 J10 Roundabout To J A2042 S, Ashford.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 15:20 and could run through until 17 January 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 23 Dec 2024 at 16:30.

UK Power Networks South Eastern logo
Until
15 Jan 2025
Details
View Map
Share
Follow
Hinxhill Road From Junction With Goodcheap Lane To Nackolt Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Hinxhill Road From Junction With Goodcheap Lane To Nackolt Road, Wye.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:06 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jan 2025 at 14:58.

National Highways logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Church Lane

National Highways are proposing to carry out Works for road purposes on Church Lane, Aldington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 6 Nov 2024 at 16:46.

Affinity Water - South East logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Dymchurch Road

Affinity Water - South East are proposing to carry out Utility repair and maintenance works on Dymchurch Road, Hythe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water - South East on 18 Nov 2024 at 15:26.

Kent County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Church Lane

Kent County Council are proposing to carry out Highway improvement works on Church Lane, Monks Horton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 7 Nov 2024 at 08:32.

Kent County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Church Lane

Kent County Council are proposing to carry out Highway improvement works on Church Lane, Monks Horton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 6 Nov 2024 at 15:46.

Affinity Water - South East logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Dymchurch Road

Affinity Water - South East are proposing to carry out Utility repair and maintenance works on Dymchurch Road, Hythe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water - South East on 15 Nov 2024 at 16:18.

National Highways logo
LONG TERM
Between
6 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Church Lane

National Highways are proposing to carry out Works for road purposes on Church Lane, Aldington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 4 Dec 2024 at 15:51.

Kent County Council logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Newchurch Road

Kent County Council are proposing to carry out Highway improvement works on Newchurch Road, Bilsington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 4 Nov 2024 at 16:04.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Upper Malthouse Hill

BT are proposing to carry out Utility repair and maintenance works on Upper Malthouse Hill, Kent, Hythe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 13:37.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Upper Malthouse Hill

BT are proposing to carry out Utility repair and maintenance works on Upper Malthouse Hill, Kent, Hythe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 09:30.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Bartholomew Street

BT are proposing to carry out Utility repair and maintenance works on Bartholomew Street, Kent, Hythe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 14:01.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Bartholomew Street

BT are proposing to carry out Utility repair and maintenance works on Bartholomew Street, Kent, Hythe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 09:29.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Barrack Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrack Hill, Hythe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 12:51.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
North Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Road, Hythe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 12:48.

Southern Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Road

Southern Water are proposing to carry out Utility repair and maintenance works on Church Road, Willesborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Nov 2024 at 13:36.

Southern Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Road

Southern Water are proposing to carry out Utility repair and maintenance works on Church Road, Willesborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 12 Nov 2024 at 14:55.

Kent County Council logo
LONG TERM
Between
3 Feb and 13 Apr 2025
Details
View Map
Share
Follow
Frogmore Lane

Kent County Council are proposing to carry out Highway improvement works on Frogmore Lane, Bonnington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 13 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 6 Nov 2024 at 09:10.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Church Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Church Lane, Aldington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Dec 2024 at 09:09.

BT logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Cherry Glebe

BT are proposing to carry out Utility repair and maintenance works on Cherry Glebe, Mersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Dec 2024 at 17:03.

BT logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Cherry Glebe

BT are proposing to carry out Utility repair and maintenance works on Cherry Glebe, Mersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Dec 2024 at 15:05.

BT logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Blind Lane

BT are proposing to carry out Utility repair and maintenance works on Blind Lane, Mersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 18 Dec 2024 at 15:36.

National Highways logo
Between
3 and 24 Mar 2025
Details
View Map
Share
Follow
Red House Lane

National Highways are proposing to carry out Works for Rail Purposes on Red House Lane, Lyminge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Dec 2024 at 23:05.

UK Power Networks South Eastern logo
LONG TERM
Between
3 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Church Road

UK Power Networks South Eastern are proposing to carry out New service connection on Church Road, Sevington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Dec 2024 at 15:09.

UK Power Networks South Eastern logo
LONG TERM
Between
3 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Church Road

UK Power Networks South Eastern are proposing to carry out New service connection on Church Road, Sevington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Dec 2024 at 15:43.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Kennington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kennington Road, Willesborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 15:11.

National Highways logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Shuttlesfield Lane

National Highways are proposing to carry out Works for Rail Purposes on Shuttlesfield Lane, Ottinge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Dec 2024 at 15:37.

South East Water logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
Whatsole Street

South East Water are proposing to carry out Utility repair and maintenance works on Whatsole Street, Elmsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 27 Dec 2024 at 14:58.

UK Power Networks South Eastern logo
LONG TERM
Between
24 Mar and 23 May 2025
Details
View Map
Share
Follow
Hythe Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hythe Road, Smeeth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jan 2025 at 08:35.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 25 Jul 2025
Details
View Map
Share
Follow
Kennington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kennington Road, Willesborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2024 at 12:30.


Roadworks Map near to Belvedere Row, ASHFORD, TN25 6FD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 6 Jan 2025 04:05
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Belvedere Row, ASHFORD, TN25 6FD (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MAIN ROAD 
(0.0 miles)
BT
Utility repair and maintenance works - Verge - No carriageway incursion
Cancelled
(Scheduled: 6 Jan 2025 - 8 Jan 2025)
0.0
Details
Share
2
BT logo
SWAN LANE 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 2 Jan 2025 - 6 Jan 2025
0.2
Details
Share
Follow
3
BT logo
MAIN ROAD 
(0.3 miles)
BT
Utility repair and maintenance works - Verge - No carriageway incursion
Cancelled
(Scheduled: 6 Jan 2025 - 8 Jan 2025)
0.3
Details
Share
4
Trooli logo
BARROW HILL 
(0.4 miles)
Trooli
Utility asset works - Carriageway, Verge - Multi-way signals
Planned
Scheduled: 6 Jan 2025 - 8 Jan 2025
0.4
Details
Share
Follow
5
BT logo
BARROW HILL 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - Multi-way signals
Planned
Scheduled: 6 Jan 2025 - 8 Jan 2025
0.4
Details
Share
Follow
6
Trooli logo
MAIN ROAD 
(0.6 miles)
Trooli
Utility asset works - Carriageway, Verge - Multi-way signals
Planned
Scheduled: 6 Jan 2025 - 8 Jan 2025
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.