ROADWORKS SUMMARY
Langholm Road, ASHFORD, TN23 4NJ
Introduction
View current and future planned roadworks and road closures for Langholm Road, TN23 4NJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Langholm Road, ASHFORD, TN23 4NJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Langholm Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
29 Sep and 6 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Godinton Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 25 Apr 2024 at 14:34.
2 Jan 2025
Kent County Council are carrying out Highway improvement works on Hurstford Lane, Charing.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 October 2024 at 08:00 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 20 Sep 2024 at 14:24.
21 Oct 2024 and 14 Mar 2025
Southern Gas Networks were proposing to carry out roadworks on Cycle Track From Turner Close To Cudworth Road, Ashford.
These works were categorised as Major.
The works were originally planned to start 21 October 2024 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:20.
9 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Thornlea, Ashford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 October 2024 at 09:00 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 08:48.
Wednesday
UK Power Networks South Eastern are carrying out New service connection on Ashford Road, Great Chart.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Oct 2024 at 08:34.
Wednesday
UK Power Networks South Eastern are carrying out New service connection on Chilmington Green Road, Stubbs Cross, Great Chart.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 31 October 2024 at 14:00 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 14:20.
Wednesday
UK Power Networks South Eastern are proposing to carry out New service connection on Chilmington Green Road, Stubbs Cross, Great Chart.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 09:38.
28 Oct and 13 Dec 2024
Kent County Council are proposing to carry out Highway improvement works on Crowbridge Road, Willesborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kent County Council on 2 Oct 2024 at 15:20.
28 Oct and 13 Dec 2024
Kent County Council are proposing to carry out Section 50 on Crowbridge Road, Willesborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kent County Council on 2 Oct 2024 at 15:18.
28 Oct and 13 Dec 2024
Kent County Council are proposing to carry out Section 50 on Crowbridge Road, Willesborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kent County Council on 26 Sep 2024 at 15:02.
24 Jan 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Gladstone Road, Willesborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:30 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:09.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Cudworth Road, Willesborough.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 08:00 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:20.
3 Dec 2024
Southern Water are carrying out Utility repair and maintenance works on Christchurch Road, Ashford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 09:04 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 11:11.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Kennington Road, Willesborough.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 13:25 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:07.
Friday
South East Water are carrying out Utility repair and maintenance works on Magpie Hall Road, Kingsnorth.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 10:10 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 22 Nov 2024 at 11:29.
31 Jan 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Godinton Road, Ashford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:10.
18 Nov and 2 Dec 2024
National Highways are proposing to carry out Works for road purposes on Sandyhurst Lane, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by National Highways on 18 Sep 2024 at 16:14.
18 Nov and 2 Dec 2024
National Highways are proposing to carry out Works for road purposes on Sandyhurst Lane, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by National Highways on 27 Sep 2024 at 13:38.
18 Nov and 13 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wotton Road, Ashford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:31.
18 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wotton Road, Ashford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 May 2024 at 07:49.
Tomorrow
South East Water are carrying out Utility repair and maintenance works on Middle Row, Ashford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 15:09 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 22 Nov 2024 at 08:36.
Wednesday
South East Water are carrying out Utility repair and maintenance works on The Forstal, Wye.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 12:48 and could run through until 27 November 2024. The works will impact the verge only.
This roadwork event was last updated by South East Water on 22 Nov 2024 at 15:13.
2 Dec 2024 and 3 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wotton Road, Ashford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 3 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 May 2024 at 07:48.
2 Dec 2024 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Loudon Way, Ashford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 11:59.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cypress Avenue, Ashford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 11:59.
2 and 4 Dec 2024
Kent County Council are proposing to carry out Highway improvement works on Church Lane, Shadoxhurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 19 Nov 2024 at 10:44.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wotton Road, Ashford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 07:33.
6 and 10 Dec 2024
Southern Water are proposing to carry out Utility repair and maintenance works on Church Road, Willesborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 11 Oct 2024 at 10:40.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gladstone Road, Willesborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2024 at 11:29.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Austin Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 May 2024 at 07:52.
6 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hampden Lane, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 May 2024 at 14:27.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Road, Willesborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2024 at 11:32.
6 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Road, Willesborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2024 at 11:33.
6 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hampden Lane, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:54.
13 Jan and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springwood Drive, Ashford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 12:00.
15 Jan and 6 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Canterbury Road, Kennington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Oct 2024 at 16:25.
15 Jan and 6 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Canterbury Road, Kennington.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Oct 2024 at 13:12.
20 and 24 Jan 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Church Road, Willesborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Nov 2024 at 14:55.
20 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Godinton Road, Ashford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 14:52.
27 and 29 Jan 2025
South East Water were proposing to carry out Utility repair and maintenance works on The Street, Westwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South East Water on 24 Oct 2024 at 15:02.
28 and 30 Jan 2025
South East Water are proposing to carry out New service connection on Beaver Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 22 Nov 2024 at 12:24.
31 Jan and 4 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Beaver Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Nov 2024 at 11:59.
3 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crowbridge Road, Willesborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2024 at 11:35.
3 and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsnorth Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:55.
3 and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsnorth Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 May 2024 at 14:35.
3 and 5 Feb 2025
South East Water are proposing to carry out New service connection on Bethersden Road, Woodchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 11 Nov 2024 at 11:50.
4 and 10 Feb 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Rylands Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 16:11.
13 and 17 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Cherry Glebe, Mersham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 19 Nov 2024 at 15:35.
17 and 19 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Godinton Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 19 Nov 2024 at 12:36.
Roadworks Map near to Langholm Road, ASHFORD, TN23 4NJ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Langholm Road, ASHFORD, TN23 4NJ (28 Events)
(Scheduled Dates)
(miles)
(Scheduled: 20 Nov 2024 - 26 Nov 2024)
(Scheduled: 6 Nov 2024 - 3 Dec 2024)
(Scheduled: 11 Nov 2024 - 20 Dec 2024)
(Scheduled: 22 Nov 2024 - 26 Nov 2024)
(Scheduled: 4 Nov 2024 - 29 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.