ROADWORKS SUMMARY
Oakview Place, UCKFIELD, TN22 5YW
Introduction
View current and future planned roadworks and road closures for Oakview Place, TN22 5YW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Oakview Place, UCKFIELD, TN22 5YW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Oakview Place are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Dec 2024
East Sussex County Council are carrying out Highway repair and maintenance works on Underhill, Maresfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 April 2023 at 08:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 7 Nov 2024 at 14:38.
Friday
East Sussex County Council are carrying out roadworks on Uckfield Bypass, Uckfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 19:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 5 Dec 2024 at 10:21.
Friday
East Sussex County Council were proposing to carry out roadworks on Eastbourne Road, Ridgewood, Uckfield.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 16:39.
Friday
UK Power Networks South Eastern were proposing to carry out New service connection on Budletts Lane, Coopers Green, Uckfield.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Sep 2024 at 09:39.
Today
GTC Pipelines were proposing to carry out New service connection on The Broyle, Ringmer.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by GTC Pipelines on 3 Sep 2024 at 13:30.
Friday
GTC Pipelines are carrying out New service connection on The Broyle, Ringmer.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by GTC Pipelines on 9 Dec 2024 at 08:58.
Today
GTC Pipelines are proposing to carry out New service connection on The Broyle, Ringmer.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by GTC Pipelines on 9 Sep 2024 at 11:16.
Today
GTC Pipelines are proposing to carry out New service connection on The Broyle, Ringmer.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by GTC Pipelines on 3 Sep 2024 at 13:44.
Today
GTC Pipelines were proposing to carry out New service connection on The Broyle, Ringmer.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by GTC Pipelines on 3 Sep 2024 at 13:28.
Friday
Electricity Network Company are carrying out New service connection on The Broyle, Ringmer.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 10:30 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 9 Dec 2024 at 09:17.
Today
Electricity Network Company are proposing to carry out New service connection on The Broyle, Ringmer.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 9 Sep 2024 at 11:18.
Today
Electricity Network Company are proposing to carry out New service connection on The Broyle, Ringmer.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 3 Sep 2024 at 13:43.
Friday
Electricity Network Company are carrying out Utility asset works on The Broyle, Ringmer.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Electricity Network Company on 9 Dec 2024 at 09:24.
Friday
UK Power Networks South Eastern were proposing to carry out New service connection on Coopers Green Road, Uckfield.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Sep 2024 at 09:39.
Today
East Sussex County Council are carrying out Highway repair and maintenance works on Eastbourne Road, Halland.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 20:00 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 13 Dec 2024 at 09:42.
Friday
East Sussex County Council are carrying out Highway repair and maintenance works on Lewes Road, Blackboys.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 21:10 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 16 Dec 2024 at 21:10.
Friday
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 23 Aug 2024 at 17:18.
Tuesday
Murphy Power Distribution are proposing to carry out New service connection on Allington Road, Newick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 23 Sep 2024 at 08:09.
Tuesday
Murphy Power Distribution are proposing to carry out New service connection on Allington Road, Newick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 1 Oct 2024 at 12:18.
Tuesday
Murphy Power Distribution are proposing to carry out New service connection on Allington Road, Newick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 7 Oct 2024 at 11:31.
3 and 6 Jan 2025
BT were proposing to carry out Utility asset works on Chapel Lane, East Sussex, Blackboys.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 January 2025 and run through until 6 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 24 Sep 2024 at 11:33.
6 and 10 Jan 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Framfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by East Sussex County Council on 23 Oct 2024 at 09:31.
6 and 8 Jan 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Sandy Lane, Framfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by East Sussex County Council on 2 Oct 2024 at 09:42.
6 and 10 Jan 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Framfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by East Sussex County Council on 14 Oct 2024 at 15:35.
6 and 8 Jan 2025
South East Water are proposing to carry out Utility repair and maintenance works on Church Street, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 29 Nov 2024 at 12:54.
6 and 8 Jan 2025
South East Water are proposing to carry out Utility repair and maintenance works on Church Street, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 6 Nov 2024 at 13:39.
6 and 8 Jan 2025
South East Water are proposing to carry out Utility repair and maintenance works on Church Street, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 1 Oct 2024 at 11:26.
6 and 8 Jan 2025
South East Water are proposing to carry out Utility repair and maintenance works on Church Street, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 11 Oct 2024 at 16:31.
6 and 24 Jan 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Station Road, Buxted.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 27 Sep 2024 at 11:53.
6 and 24 Jan 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Station Road, Buxted.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 Sep 2024 at 11:29.
6 Jan and 7 Feb 2025
East Sussex County Council are proposing to carry out roadworks on London Road, East Hoathly.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 28 Oct 2024 at 10:56.
6 and 8 Jan 2025
South East Water are proposing to carry out Utility repair and maintenance works on Church Street, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 1 Nov 2024 at 12:54.
13 and 17 Jan 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 23 Aug 2024 at 17:19.
13 and 17 Jan 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 Sep 2024 at 11:28.
13 and 15 Jan 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Spithurst Road, Barcombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 22 Oct 2024 at 12:34.
13 and 15 Jan 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on School Hill, Barcombe Cross.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 22 Oct 2024 at 12:27.
16 Jan and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Eastbourne Road, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Oct 2024 at 11:22.
20 Jan and 1 Feb 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 29 Nov 2024 at 11:23.
25 Jan and 2 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Eastbourne Road, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 11:31.
30 Jan and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Uckfield Bypass, Little Horsted, Uckfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 14 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 10:09.
1 and 9 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Eastbourne Road, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Nov 2024 at 10:59.
3 and 18 Feb 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 18 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 9 Aug 2024 at 11:52.
6 and 15 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Uckfield Bypass, Little Horsted, Uckfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 15 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 08:27.
17 Feb and 18 Apr 2025
East Sussex County Council are proposing to carry out roadworks on Eastbourne Road, Ridgewood, Uckfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 28 Oct 2024 at 12:47.
17 and 19 Feb 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Church Street, Fletching.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 26 Nov 2024 at 12:29.
17 and 19 Feb 2025
South East Water were proposing to carry out New service connection on Southview Drive, Uckfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South East Water on 26 Nov 2024 at 11:53.
18 and 26 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Uckfield Road, Stoneham, Ringmer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 10:02.
18 and 26 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Uckfield Road, Stoneham, Ringmer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 11:40.
24 and 26 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Sandhill Lane, East Sussex, Halland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 28 Nov 2024 at 08:14.
3 and 29 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 10 Dec 2024 at 08:33.
3 and 29 Mar 2025
East Sussex County Council are proposing to carry out Highway improvement works on Lewes Road, Blackboys.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 31 Oct 2024 at 10:23.
3 and 29 Mar 2025
East Sussex County Council are proposing to carry out Highway improvement works on Lewes Road, Blackboys.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 15 Oct 2024 at 14:07.
3 and 14 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Snatts Road, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 12 Nov 2024 at 15:10.
3 and 14 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Snatts Road, Uckfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 27 Nov 2024 at 15:39.
10 Mar and 22 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ringmer Road, Ringmer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2024 at 08:18.
10 and 12 Mar 2025
South East Water are proposing to carry out Utility asset works on Pound Green Lane, Buxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 13 Dec 2024 at 08:38.
10 Mar and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bradfords Lane, Little Horsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 10:39.
10 Mar and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bradfords Lane, Little Horsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 10:19.
10 Mar and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bradfords Lane, Little Horsted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 10:37.
10 and 14 Mar 2025
South East Water are proposing to carry out Utility asset works on Bishops Lane, Ringmer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 13 Dec 2024 at 10:01.
10 Mar and 22 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ringmer Road, Ringmer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 08:42.
10 Mar and 22 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ringmer Road, Ringmer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 11:26.
10 Mar and 29 Apr 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Ringmer Road, Ringmer.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 29 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2024 at 08:02.
17 and 19 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Fowley Lane, High Hurstwood, Buxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 11 Dec 2024 at 12:21.
Roadworks Map near to Oakview Place, UCKFIELD, TN22 5YW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Oakview Place, UCKFIELD, TN22 5YW (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.