ROADWORKS SUMMARY
Oakleigh Drive, HEATHFIELD, TN21 8HQ
Introduction
View current and future planned roadworks and road closures for Oakleigh Drive, TN21 8HQ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Oakleigh Drive, HEATHFIELD, TN21 8HQ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Oakleigh Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
5 Apr 2025
South East Water are carrying out Utility repair and maintenance works on Cade Street, Heathfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 05:08 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 30 Jan 2025 at 13:50.
18 Mar 2025
South East Water are carrying out Utility asset works on Battle Road, Punnetts Town.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:30 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 23 Dec 2024 at 08:25.
Tomorrow
South East Water are carrying out Utility repair and maintenance works on Hugletts Lane, Cade Street, Heathfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 11:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 13 Jan 2025 at 08:50.
28 Feb 2025
South East Water are carrying out Remedial works on Station Approach, Heathfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 December 2024 at 10:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 23 Jan 2025 at 14:06.
5 Apr 2025
South East Water are carrying out Utility repair and maintenance works on Battle Road, Heathfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 January 2025 at 12:00 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 17 Jan 2025 at 15:21.
5 Apr 2025
South East Water are carrying out Utility repair and maintenance works on Burwash Road, Heathfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 January 2025 at 12:00 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 27 Jan 2025 at 10:22.
7 Feb 2025
East Sussex County Council are carrying out roadworks on London Road, East Hoathly.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 07:00 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 6 Jan 2025 at 07:28.
Wednesday
UK Power Networks South Eastern are proposing to carry out Utility asset works on Back Lane, Rushlake Green, Warbleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2024 at 09:16.
Wednesday
UK Power Networks South Eastern are proposing to carry out Utility asset works on Back Lane, Rushlake Green, Warbleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 10:00.
Wednesday
UK Power Networks South Eastern are proposing to carry out Utility asset works on Bodle Street Road, Rushlake Green, Warbleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2024 at 09:23.
Wednesday
UK Power Networks South Eastern are proposing to carry out Utility asset works on Bodle Street Road, Rushlake Green, Warbleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 10:00.
13 Jan and 7 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Pound Green, Buxted.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 11:13.
17 Feb 2025
East Sussex County Council are carrying out Highway repair and maintenance works on Little Trodgers Lane, Mayfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 January 2025 at 12:30 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 16 Jan 2025 at 14:37.
Saturday
East Sussex County Council are carrying out Highway repair and maintenance works on High Street, Cross In Hand.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 20:05 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 20 Jan 2025 at 20:05.
20 Jan and 14 Feb 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Cross In Hand Road, Heathfield.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 27 Dec 2024 at 10:29.
Saturday
East Sussex County Council are carrying out Highway repair and maintenance works on Lewes Road, Cross In Hand, Heathfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 20:05 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 20 Jan 2025 at 20:05.
20 Jan and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on The Toll, Hadlow Down.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 11:26.
Saturday
East Sussex County Council are carrying out Highway repair and maintenance works on Lewes Road, Blackboys.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 20:06 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 20 Jan 2025 at 20:06.
20 Jan and 14 Feb 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Little London Road, Heathfield.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 27 Dec 2024 at 10:29.
Tomorrow
South East Water are proposing to carry out New service connection on Magreed Lane, Broad Oak, Heathfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 31 Oct 2024 at 15:25.
Monday
South East Water are carrying out Utility repair and maintenance works on Stone Cross, Mayfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 January 2025 at 11:35 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 29 Jan 2025 at 14:21.
East Sussex County Council carried out Highway repair and maintenance works on Marle Green, North Corner, Horam.
The road was closed for some or all of the period.
The works were completed on 30 January 2025 The works impacted the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 Jan 2025 at 17:05.
Wednesday
UK Power Networks South Eastern are proposing to carry out New service connection on Meres Lane, Cross In Hand.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Jan 2025 at 11:07.
Wednesday
UK Power Networks South Eastern are proposing to carry out New service connection on Meres Lane, Cross In Hand.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Dec 2024 at 16:33.
14 Feb 2025
East Sussex County Council are carrying out Highway repair and maintenance works on Frog Hole Lane, Five Ashes.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 08:00 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 30 Jan 2025 at 11:18.
Wednesday
East Sussex County Council are carrying out Highway repair and maintenance works on Five Chimneys Lane, Hadlow Down.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 07:51 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 30 Jan 2025 at 07:51.
Tuesday
UK Power Networks South Eastern are proposing to carry out New service connection on Meres Lane, Cross In Hand.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 9 Jan 2025 at 14:06.
Tuesday
UK Power Networks South Eastern were proposing to carry out New service connection on Meres Lane, Cross In Hand.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Jan 2025 at 14:59.
Tuesday
UK Power Networks South Eastern are proposing to carry out New service connection on Meres Lane, Cross In Hand.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Jan 2025 at 09:23.
3 and 18 Feb 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 18 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 9 Aug 2024 at 11:52.
10 and 12 Feb 2025
BT are proposing to carry out Utility asset works on Tilsmore Road, Heathfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 23 Jan 2025 at 14:11.
11 and 13 Feb 2025
South East Water are proposing to carry out New service connection on Grove Hill, Hellingly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 30 Dec 2024 at 09:58.
11 and 13 Feb 2025
South East Water are proposing to carry out New service connection on Grove Hill, Hellingly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 25 Sep 2024 at 11:41.
17 and 19 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bicycle Arms Road, High Cross, Rotherfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Oct 2024 at 13:30.
17 Feb and 7 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Main Road, Hadlow Down.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 14:49.
17 Feb and 7 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Main Road, Hadlow Down.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 11:33.
21 and 23 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bicycle Arms Road, High Cross, Rotherfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 13:03.
21 and 23 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Bicycle Arms Road, High Cross, Rotherfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 12:12.
24 Feb and 19 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Back Lane, Rushlake Green, Warbleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 13:55.
24 Feb and 19 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Back Lane, Rushlake Green, Warbleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Dec 2024 at 07:47.
24 Feb and 19 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Bodle Street Road, Rushlake Green, Warbleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 13:55.
24 Feb and 19 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Bodle Street Road, Rushlake Green, Warbleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Dec 2024 at 07:59.
3 and 5 Mar 2025
BT are proposing to carry out Utility repair and maintenance works on Ghyll Road, East Sussex, Heathfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 12 Dec 2024 at 15:01.
3 and 5 Mar 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Heathfield Road, Burwash.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 20 Jan 2025 at 17:56.
3 and 29 Mar 2025
East Sussex County Council are proposing to carry out Highway improvement works on Lewes Road, Blackboys.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 15 Oct 2024 at 14:07.
3 and 29 Mar 2025
East Sussex County Council are proposing to carry out Highway improvement works on Lewes Road, Blackboys.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 31 Oct 2024 at 10:23.
3 and 29 Mar 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 29 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 19 Dec 2024 at 11:58.
3 and 29 Mar 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 22 Jan 2025 at 08:37.
3 and 29 Mar 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Lewes Road, Blackboys.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 29 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 21 Jan 2025 at 08:29.
6 and 27 Mar 2025
East Sussex County Council are proposing to carry out roadworks on London Road, East Hoathly.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 28 Jan 2025 at 11:54.
10 Mar and 2 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Curtains Hill, Hadlow Down.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Nov 2024 at 10:45.
10 Mar and 2 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Curtains Hill, Hadlow Down.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 11:53.
10 and 12 Mar 2025
South East Water are proposing to carry out Utility asset works on Pound Green Lane, Buxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 10 Jan 2025 at 15:25.
10 Mar and 2 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Curtains Hill, Hadlow Down.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Jan 2025 at 14:22.
10 and 13 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Nettlesworth Lane, Vines Cross, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 15 Jan 2025 at 11:27.
10 and 13 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Nettlesworth Lane, Vines Cross, Horam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 18 Dec 2024 at 08:24.
17 Mar and 4 Apr 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on School Hill, Old Heathfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 4 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 16 Jan 2025 at 09:03.
24 Mar and 9 Apr 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Five Chimneys Lane, Hadlow Down.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 9 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 16 Jan 2025 at 09:06.
24 Mar and 5 Apr 2025
East Sussex County Council were proposing to carry out Highway repair and maintenance works on Burwash Road, Heathfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 5 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 27 Nov 2024 at 15:11.
24 Mar and 5 Apr 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Burwash Road, Heathfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 5 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 23 Jan 2025 at 15:20.
24 Mar and 4 Apr 2025
South East Water are proposing to carry out Utility repair and maintenance works on Forest Lane, Punnetts Town.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 8 Mar 2024 at 10:25.
31 Mar and 2 Apr 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Heathfield Road, Burwash.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 20 Jan 2025 at 17:58.
2 and 4 Apr 2025
South East Water are proposing to carry out Utility repair and maintenance works on Nursery Lane, Cross In Hand, Heathfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the verge only.
This roadwork event was last updated by South East Water on 8 Jan 2025 at 15:47.
7 and 18 Apr 2025
South East Water are proposing to carry out Highway repair and maintenance works on Battle Road, Heathfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 12 Mar 2024 at 15:04.
7 and 18 Apr 2025
South East Water are proposing to carry out Highway repair and maintenance works on Cade Street, Heathfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 12 Mar 2024 at 15:03.
14 and 23 Apr 2025
East Sussex County Council were proposing to carry out Core Sampling on Coggins Mill Lane, Mayfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 23 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 12 Dec 2024 at 13:48.
14 and 23 Apr 2025
East Sussex County Council were proposing to carry out Core Sampling on Tidebrook Road, Rushers Cross, Mayfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 23 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 12 Dec 2024 at 13:49.
14 and 16 Apr 2025
South East Water are proposing to carry out Utility repair and maintenance works on Tunbridge Wells Road, Mayfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 30 Jan 2025 at 12:59.
14 and 16 Apr 2025
South East Water are proposing to carry out Utility asset works on Pound Green Lane, Buxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 20 Jan 2025 at 16:26.
14 and 16 Apr 2025
South East Water are proposing to carry out Utility asset works on Pound Green Lane, Buxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 20 Jan 2025 at 14:26.
16 and 18 Apr 2025
South East Water are proposing to carry out New service connection on Wilderness Lane, Hadlow Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 9 Jan 2025 at 07:46.
21 and 23 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Ghyll Road, East Sussex, Heathfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Jan 2025 at 11:09.
22 Apr and 1 May 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Furnace Lane, Warbleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 1 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by East Sussex County Council on 8 Jan 2025 at 10:33.
22 Apr and 16 May 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Rookery Lane, Rushlake Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 24 Jul 2024 at 10:52.
22 Apr and 16 May 2025
East Sussex County Council are proposing to carry out Highway improvement works on Earls Down, Dallington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 24 Jul 2024 at 10:53.
28 Apr and 30 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on The Toll, Hadlow Down.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 10 Dec 2024 at 12:31.
28 Apr and 2 May 2025
East Sussex County Council are proposing to carry out Highway repair and maintenance works on Coggins Mill Lane, Mayfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by East Sussex County Council on 15 Jan 2025 at 13:21.
28 and 30 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Blackdown Lane, East Sussex, Punnetts Town.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 15 Jan 2025 at 23:45.
28 and 30 Apr 2025
South East Water are proposing to carry out New service connection on Swife Lane, Broad Oak, Heathfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 9 Jan 2025 at 14:10.
28 Apr and 30 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on The Toll, Hadlow Down.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 14:09.
28 Apr and 2 May 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Mayfield Flat, Cross In Hand, Heathfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 10 Jan 2025 at 12:09.
Roadworks Map near to Oakleigh Drive, HEATHFIELD, TN21 8HQ (Loading...)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Oakleigh Drive, HEATHFIELD, TN21 8HQ (8 Events)
(Scheduled Dates)
(miles)
(Scheduled: 19 Dec 2024 - 28 Feb 2025)
(Scheduled: 2 Jan 2025 - 5 Apr 2025)
(Scheduled: 2 Jan 2025 - 5 Apr 2025)
Contains public sector information licensed under the Open Government Licence v3.0.