ROADWORKS SUMMARY
Fir Toll Road, MAYFIELD, TN20 6NB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fir Toll Road, TN20 6NB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fir Toll Road, MAYFIELD, TN20 6NB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fir Toll Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

South East Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Cade Street

South East Water are carrying out Utility repair and maintenance works on Cade Street, Heathfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 05:08 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 28 Nov 2024 at 15:39.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Wadhurst Road

South East Water are proposing to carry out Utility repair and maintenance works on Wadhurst Road, Mark Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 24 Jul 2024 at 17:32.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Fairglen Road

South East Water are proposing to carry out Utility asset works on Fairglen Road, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 23 Aug 2024 at 11:56.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Buckhurst Lane

South East Water are proposing to carry out Utility asset works on Buckhurst Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 23 Aug 2024 at 11:43.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Tidebrook Road

South East Water are proposing to carry out Utility asset works on Tidebrook Road, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 23 Aug 2024 at 11:50.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Mayfield Lane

South East Water are proposing to carry out Utility asset works on Mayfield Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 23 Aug 2024 at 14:11.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Best Beech Lane

South East Water are proposing to carry out Utility repair and maintenance works on Best Beech Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 3 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 6 Jun 2024 at 14:24.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Best Beech Hill

South East Water were proposing to carry out Utility repair and maintenance works on Best Beech Hill, Wadhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 23 Aug 2024 at 11:40.

South East Water logo
LONG TERM
Between
7 Oct 2024 and 3 Mar 2025
Details
View Map
Share
Best Beech Hill

South East Water were proposing to carry out Utility asset works on Best Beech Hill, Wadhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 28 Aug 2024 at 14:32.

South East Water logo
LONG TERM
Until
24 Mar 2025
Details
View Map
Share
Follow
Best Beech Lane

South East Water are carrying out Utility asset works on Best Beech Lane, Wadhurst.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 07:30 and could run through until 24 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 6 Nov 2024 at 12:59.

South East Water logo
LONG TERM
Until
24 Mar 2025
Details
View Map
Share
Follow
Best Beech Hill

South East Water are carrying out Utility asset works on Best Beech Hill, Wadhurst.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 07:30 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 28 Oct 2024 at 07:46.

Southern Gas Networks logo
LONG TERM
Between
1 Nov 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Aviemore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aviemore Road, Crowborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 13:53.

Southern Gas Networks logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Warren Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Warren Road, Crowborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 15:45 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 12:11.

South East Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Hugletts Lane

South East Water are carrying out Utility repair and maintenance works on Hugletts Lane, Cade Street, Heathfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 11:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 29 Nov 2024 at 12:23.

South East Water logo
LONG TERM
Between
11 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Fairglen Road

South East Water are proposing to carry out Utility asset works on Fairglen Road, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 30 Sep 2024 at 11:24.

South East Water logo
LONG TERM
Between
11 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Buckhurst Lane

South East Water are proposing to carry out Utility asset works on Buckhurst Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South East Water on 30 Sep 2024 at 11:22.

East Sussex County Council logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Palesgate Lane

East Sussex County Council are carrying out Highway repair and maintenance works on Palesgate Lane, Crowborough.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 09:00 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 11 Nov 2024 at 16:47.

Southern Gas Networks logo
LONG TERM
Between
3 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Rannoch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rannoch Road, Crowborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 16:29.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Crowborough Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Crowborough Hill, Crowborough.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 10:15 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 09:53.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Station Road, Mayfield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 10:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 16:16.

UK Power Networks South Eastern logo
Finishing
Today
Details
View Map
Share
Follow
Horleigh Green Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Horleigh Green Road, Five Ashes.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 08:45 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Dec 2024 at 09:24.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
West Beeches Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on West Beeches Road, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2024 at 13:31.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
West Beeches Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on West Beeches Road, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Oct 2024 at 12:19.

East Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Western Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Western Road, Crowborough.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 17 Dec 2024 at 13:23.

Southern Water logo
LONG TERM
Between
23 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
The Farthings

Southern Water are proposing to carry out Utility repair and maintenance works on The Farthings, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 9 Oct 2024 at 13:41.

South East Water logo
LONG TERM
Between
2 Jan and 5 Apr 2025
Details
View Map
Share
Follow
Burwash Road

South East Water are proposing to carry out Utility repair and maintenance works on Burwash Road, Heathfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 16 Oct 2024 at 11:48.

South East Water logo
LONG TERM
Between
2 Jan and 5 Apr 2025
Details
View Map
Share
Follow
Battle Road

South East Water are proposing to carry out Utility repair and maintenance works on Battle Road, Heathfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 17 Oct 2024 at 16:19.

BT logo
Between
3 and 6 Jan 2025
Details
View Map
Share
Chapel Lane

BT were proposing to carry out Utility asset works on Chapel Lane, East Sussex, Blackboys.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 6 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 24 Sep 2024 at 11:33.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Mount Pleasant

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mount Pleasant, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 13:19.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Aviemore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aviemore Road, Crowborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 10:52.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Mount Pleasant

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mount Pleasant, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 09:39.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Mount Pleasant

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mount Pleasant, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 13:01.

East Sussex County Council logo
Between
6 and 12 Jan 2025
Details
View Map
Share
Follow
Newick Lane

East Sussex County Council are proposing to carry out Section 50 on Newick Lane, Mayfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 31 Oct 2024 at 13:48.

East Sussex County Council logo
Between
6 and 12 Jan 2025
Details
View Map
Share
Follow
Newick Lane

East Sussex County Council are proposing to carry out Section 50 on Newick Lane, Mayfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 1 Nov 2024 at 10:10.

East Sussex County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Newick Lane

East Sussex County Council are proposing to carry out Section 50 on Newick Lane, Mayfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 31 Oct 2024 at 13:49.

UK Power Networks South Eastern logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Pound Green

UK Power Networks South Eastern are proposing to carry out New service connection on Pound Green, Buxted.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 11:13.

UK Power Networks South Eastern logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
The Toll

UK Power Networks South Eastern are proposing to carry out New service connection on The Toll, Hadlow Down.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 11:26.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Whitehill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Whitehill Road, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Oct 2024 at 13:13.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Bicycle Arms Road

UK Power Networks South Eastern are proposing to carry out New service connection on Bicycle Arms Road, High Cross, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Oct 2024 at 12:59.

East Sussex County Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Little London Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Little London Road, Heathfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 18 Jul 2024 at 10:46.

East Sussex County Council logo
Between
20 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Lewes Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Lewes Road, Cross In Hand, Heathfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 29 Nov 2024 at 11:23.

East Sussex County Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Cross In Hand Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Cross In Hand Road, Heathfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 18 Jul 2024 at 10:47.

East Sussex County Council logo
Between
20 Jan and 1 Feb 2025
Details
View Map
Share
Follow
High Street

East Sussex County Council are proposing to carry out Highway repair and maintenance works on High Street, Cross In Hand.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 29 Nov 2024 at 11:22.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Meres Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Meres Lane, Cross In Hand.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Nov 2024 at 12:02.

South East Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Street End Lane

South East Water were proposing to carry out New service connection on Street End Lane, Broad Oak, Heathfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by South East Water on 16 Sep 2024 at 09:26.

UK Power Networks South Eastern logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Southridge Rise

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Southridge Rise, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 16:38.

East Sussex County Council logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Station Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Station Road, Town Row, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 3 Dec 2024 at 16:00.

East Sussex County Council logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Station Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Station Road, Town Row, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 23 Oct 2024 at 14:40.

East Sussex County Council logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Spout Hill

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Spout Hill, Town Row, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 3 Dec 2024 at 16:01.

East Sussex County Council logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Spout Hill

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Spout Hill, Town Row, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 23 Oct 2024 at 14:37.

East Sussex County Council logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
New Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on New Road, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 23 Oct 2024 at 14:14.

East Sussex County Council logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Catts Hill

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Catts Hill, Town Row, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 3 Dec 2024 at 15:59.

East Sussex County Council logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Catts Hill

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Catts Hill, Town Row, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 23 Oct 2024 at 14:39.

East Sussex County Council logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Yew Tree Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Yew Tree Lane, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 3 Dec 2024 at 16:00.

East Sussex County Council logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Yew Tree Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Yew Tree Lane, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 23 Oct 2024 at 14:40.

UK Power Networks South Eastern logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Southridge Rise

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Southridge Rise, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 16:44.

East Sussex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Rotherfield Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Rotherfield Lane, Mayfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 1 Nov 2024 at 15:59.

East Sussex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Rotherfield Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Rotherfield Lane, Mayfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 5 Nov 2024 at 11:57.

South East Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Magreed Lane

South East Water are proposing to carry out New service connection on Magreed Lane, Broad Oak, Heathfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 31 Oct 2024 at 15:25.

East Sussex County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Five Chimneys Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Five Chimneys Lane, Hadlow Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 6 Dec 2024 at 16:39.

South East Water logo
LONG TERM
Between
3 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Wadhurst Road

South East Water are proposing to carry out Utility asset works on Wadhurst Road, Mark Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 23 Sep 2024 at 16:14.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Tollwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tollwood Road, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Blackness Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blackness Road, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 13:16.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Tilsmore Road

BT are proposing to carry out Utility asset works on Tilsmore Road, Heathfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Dec 2024 at 13:15.

South East Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Yew Tree Lane

South East Water are proposing to carry out Utility repair and maintenance works on Yew Tree Lane, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 10 Dec 2024 at 16:04.

East Sussex County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Wenbans Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Wenbans Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 25 Nov 2024 at 15:28.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 12:19.

UK Power Networks South Eastern logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out New service connection on Main Road, Hadlow Down.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 14:49.

East Sussex County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Witherenden Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Witherenden Road, Stonegate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 1 Oct 2024 at 10:40.

East Sussex County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Witherenden Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Witherenden Road, Stonegate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 7 Oct 2024 at 13:15.

East Sussex County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Station Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Station Road, Stonegate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 1 Oct 2024 at 10:40.

East Sussex County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Station Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Station Road, Stonegate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 7 Oct 2024 at 13:16.

UK Power Networks South Eastern logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Bicycle Arms Road

UK Power Networks South Eastern are proposing to carry out New service connection on Bicycle Arms Road, High Cross, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Oct 2024 at 13:30.

UK Power Networks South Eastern logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out New service connection on Main Road, Hadlow Down.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 11:33.

South East Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
High Cross

South East Water are proposing to carry out Utility repair and maintenance works on High Cross, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 25 Sep 2024 at 16:04.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
High Cross

South East Water are proposing to carry out Utility repair and maintenance works on High Cross, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 8 Nov 2024 at 10:33.

UK Power Networks South Eastern logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
West Beeches Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on West Beeches Road, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Dec 2024 at 09:37.

Southern Gas Networks logo
Between
20 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Rannoch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rannoch Road, Crowborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 11:30.

UK Power Networks South Eastern logo
Between
21 and 23 Feb 2025
Details
View Map
Share
Follow
Bicycle Arms Road

UK Power Networks South Eastern are proposing to carry out New service connection on Bicycle Arms Road, High Cross, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 13:03.

UK Power Networks South Eastern logo
Between
21 and 23 Feb 2025
Details
View Map
Share
Follow
Bicycle Arms Road

UK Power Networks South Eastern are proposing to carry out New service connection on Bicycle Arms Road, High Cross, Rotherfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 12:12.

BT logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Ghyll Road

BT are proposing to carry out Utility repair and maintenance works on Ghyll Road, East Sussex, Heathfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Dec 2024 at 15:01.

South East Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Wadhurst Road

South East Water are proposing to carry out Utility repair and maintenance works on Wadhurst Road, Frant.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 12 Dec 2024 at 14:39.

East Sussex County Council logo
Between
4 and 14 Mar 2025
Details
View Map
Share
Follow
Frant Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Frant Road, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 11 Sep 2024 at 16:05.

East Sussex County Council logo
Between
4 and 14 Mar 2025
Details
View Map
Share
Frant Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Frant Road, Wadhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 30 Oct 2024 at 11:47.

East Sussex County Council logo
Between
4 and 14 Mar 2025
Details
View Map
Share
Frant Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Frant Road, Wadhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 14 Aug 2024 at 07:17.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Curtains Hill

UK Power Networks South Eastern are proposing to carry out New service connection on Curtains Hill, Hadlow Down.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 11:53.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Curtains Hill

UK Power Networks South Eastern are proposing to carry out New service connection on Curtains Hill, Hadlow Down.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Nov 2024 at 10:45.

East Sussex County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Tunbridge Wells Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Tunbridge Wells Road, Mark Cross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 4 Oct 2024 at 05:25.

South East Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Pound Green Lane

South East Water are proposing to carry out Utility asset works on Pound Green Lane, Buxted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 13 Dec 2024 at 08:38.

UK Power Networks South Eastern logo
LONG TERM
Between
10 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Tapsells Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Tapsells Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Sep 2024 at 13:18.

South East Water logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Park Road

South East Water are proposing to carry out New service connection on Park Road, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 12 Dec 2024 at 14:14.

East Sussex County Council logo
LONG TERM
Between
17 Mar and 19 Apr 2025
Details
View Map
Share
Follow
Mayfield Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Mayfield Road, Frant.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 8 Aug 2024 at 13:01.

Southern Gas Networks logo
Between
17 and 26 Mar 2025
Details
View Map
Share
Follow
Warren Road

Southern Gas Networks are proposing to carry out New service connection on Warren Road, Crowborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 14:53.

East Sussex County Council logo
LONG TERM
Between
17 Mar and 19 Apr 2025
Details
View Map
Share
Mayfield Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Mayfield Road, Frant.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 27 Nov 2024 at 15:15.

East Sussex County Council logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Snape Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Snape Lane, Wadhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 25 Nov 2024 at 15:20.

East Sussex County Council logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
School Hill

East Sussex County Council are proposing to carry out Highway repair and maintenance works on School Hill, Old Heathfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 13 Dec 2024 at 10:58.


Roadworks Map near to Fir Toll Road, MAYFIELD, TN20 6NB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 03:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fir Toll Road, MAYFIELD, TN20 6NB (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
EMERGENCY
  
STATION ROAD 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 9 Dec 2024 10:00
(Scheduled: 9 Dec 2024 - 24 Dec 2024)
0.3
Details
Share
Follow
2
UK Power Networks South Eastern logo
URGENT
  
HORLEIGH GREEN ROAD 
(0.9 miles)
UK Power Networks South Eastern
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 12 Dec 2024 08:45
(Scheduled: 12 Dec 2024 - 18 Dec 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.