ROADWORKS SUMMARY
Fuggles Court, CRANBROOK, TN17 4EF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fuggles Court, TN17 4EF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fuggles Court, CRANBROOK, TN17 4EF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fuggles Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

East Sussex County Council logo
LONG TERM
Between
9 Jun and 30 Sep 2025
Details
View Map
Share
Hawkhurst Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Hawkhurst Road, Salehurst, Robertsbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 25 Mar 2025 at 09:06.

East Sussex County Council logo
LONG TERM
Between
9 Jul and 22 Oct 2025
Details
View Map
Share
Hawkhurst Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Hawkhurst Road, Salehurst, Robertsbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 20 Jun 2025 at 12:14.

Kent County Council logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Heartenoak Road

Kent County Council are carrying out Highway improvement works on Heartenoak Road, Hawkhurst, Cranbrook.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 11 Sep 2025 at 13:07.

Kent County Council logo
LONG TERM
Between
28 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Heartenoak Road

Kent County Council are proposing to carry out Highway improvement works on Heartenoak Road, Hawkhurst, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 11 Mar 2025 at 09:50.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Walkhurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Walkhurst Road, Benenden, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 13:17.

South East Water logo
Finishing
Today
Details
View Map
Share
Mill Pond Lane

South East Water were proposing to carry out Utility repair and maintenance works on Mill Pond Lane, Tenterden.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South East Water on 16 Sep 2025 at 11:01.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Chapel Lane

BT are proposing to carry out Utility asset works on Chapel Lane, Kent, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 22 September 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Jun 2025 at 15:51.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Chapel Lane

BT are proposing to carry out Utility asset works on Chapel Lane, Kent, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 22 September 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 25 Jun 2025 at 07:44.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Sandhurst Lane

BT are proposing to carry out Utility asset works on Sandhurst Lane, Kent, Rolvenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 22 September 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 15 Sep 2025 at 15:03.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Sandhurst Lane

BT are proposing to carry out Utility asset works on Sandhurst Lane, Kent, Rolvenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 22 September 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 23 Jun 2025 at 13:56.

UK Power Networks South Eastern logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Fosten Lane

UK Power Networks South Eastern were proposing to carry out Utility asset works on Fosten Lane, Biddenden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Sep 2025 at 17:20.

Southern Gas Networks logo
Between
22 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Queen Street

Southern Gas Networks are proposing to carry out New service connection on Queen Street, Sandhurst, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 14:19.

Kent County Council logo
Between
24 and 27 Sep 2025
Details
View Map
Share
Follow
Rolvenden Road

Kent County Council are proposing to carry out Highway improvement works on Rolvenden Road, Tenterden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 23 Jul 2025 at 09:40.

UK Power Networks South Eastern logo
LONG TERM
Between
26 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Station Road

UK Power Networks South Eastern are proposing to carry out New service connection on Station Road, Tenterden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 5 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jul 2025 at 09:10.

UK Power Networks South Eastern logo
LONG TERM
Between
26 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Station Road

UK Power Networks South Eastern are proposing to carry out New service connection on Station Road, Tenterden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 5 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Jun 2025 at 12:01.

Kent County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
East Cross

Kent County Council are proposing to carry out Highway improvement works on East Cross, Tenterden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 23 Jul 2025 at 15:41.

Kent County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
East Cross

Kent County Council are proposing to carry out Highway improvement works on East Cross, Tenterden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 9 Jul 2025 at 14:45.

Kent County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
High Street

Kent County Council are proposing to carry out Highway improvement works on High Street, Tenterden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 23 Jul 2025 at 15:42.

Kent County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
High Street

Kent County Council are proposing to carry out Highway improvement works on High Street, Tenterden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 9 Jul 2025 at 14:44.

Kent County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
High Street

Kent County Council are proposing to carry out Highway improvement works on High Street, Tenterden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 9 Jul 2025 at 14:44.

Kent County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Rolvenden Road

Kent County Council are proposing to carry out Highway improvement works on Rolvenden Road, Tenterden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 9 Jul 2025 at 14:43.

Virgin Media logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Conghurst Lane

Virgin Media are proposing to carry out Permanent reinstatement on Conghurst Lane, Hawkhurst, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 23 Jul 2025 at 13:05.

Kent County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
West Cross

Kent County Council are proposing to carry out Highway improvement works on West Cross, Tenterden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 9 Jul 2025 at 14:44.

Virgin Media logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Conghurst Lane

Virgin Media were proposing to carry out Utility asset works on Conghurst Lane, Hawkhurst, Cranbrook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 10 Jul 2025 at 11:22.

Kent County Council logo
Between
3 and 9 Oct 2025
Details
View Map
Share
Follow
High Street

Kent County Council are proposing to carry out Highway improvement works on High Street, Tenterden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 Jul 2025 at 16:04.

Kent County Council logo
Between
3 and 9 Oct 2025
Details
View Map
Share
Follow
West Cross

Kent County Council are proposing to carry out Highway improvement works on West Cross, Tenterden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 Jul 2025 at 16:04.

Kent County Council logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Follow
Stream Lane

Kent County Council are proposing to carry out roadworks on Stream Lane, Hawkhurst, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 9 Jul 2025 at 16:58.

Kent County Council logo
Between
8 and 18 Oct 2025
Details
View Map
Share
Follow
Goudhurst Road

Kent County Council are proposing to carry out Highway improvement works on Goudhurst Road, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 10 Jun 2025 at 08:24.

Kent County Council logo
Between
9 and 18 Oct 2025
Details
View Map
Share
Follow
Wilsley Pound

Kent County Council are proposing to carry out Highway improvement works on Wilsley Pound, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 10 Jun 2025 at 08:24.

Kent County Council logo
Between
9 and 18 Oct 2025
Details
View Map
Share
Follow
Wilsley Green

Kent County Council are proposing to carry out Highway improvement works on Wilsley Green, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 10 Jun 2025 at 08:28.

Kent County Council logo
Between
9 and 18 Oct 2025
Details
View Map
Share
Follow
Wilsley Green

Kent County Council are proposing to carry out Highway improvement works on Wilsley Green, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jul 2025 at 12:25.

Kent County Council logo
Between
9 and 18 Oct 2025
Details
View Map
Share
Follow
Goudhurst Road

Kent County Council are proposing to carry out Highway improvement works on Goudhurst Road, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 6 Aug 2025 at 09:38.

Kent County Council logo
Between
9 and 18 Oct 2025
Details
View Map
Share
Follow
Wilsley Pound

Kent County Council are proposing to carry out Highway improvement works on Wilsley Pound, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 6 Aug 2025 at 09:40.

East Sussex County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Hawkhurst Road

East Sussex County Council were proposing to carry out Highway repair and maintenance works on Hawkhurst Road, Salehurst, Robertsbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 16 Sep 2025 at 14:02.

Kent County Council logo
Until
31 Oct 2025
Details
View Map
Share
Follow
Lossenham Lane

Kent County Council are carrying out Highway improvement works on Lossenham Lane, Newenden.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 October 2025 at 00:00 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 22 Aug 2025 at 10:11.

Kent County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Hastings Road

Kent County Council are proposing to carry out Highway improvement works on Hastings Road, Rolvenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 17 Sep 2025 at 11:54.

Kent County Council logo
Until
31 Oct 2025
Details
View Map
Share
Follow
Hastings Road

Kent County Council are carrying out Highway improvement works on Hastings Road, Rolvenden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 October 2025 at 00:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Aug 2025 at 14:44.

UK Power Networks South Eastern logo
LONG TERM
Between
3 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Station Road

UK Power Networks South Eastern are proposing to carry out New service connection on Station Road, Tenterden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Aug 2025 at 09:04.

BT logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Sponden Lane

BT are proposing to carry out Utility asset works on Sponden Lane, Kent, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 28 Jul 2025 at 14:48.

BT logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Sponden Lane

BT are proposing to carry out Utility asset works on Sponden Lane, Kent, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 4 Aug 2025 at 07:51.

Kent County Council logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Cranbrook Road

Kent County Council are proposing to carry out Highway improvement works on Cranbrook Road, Hawkhurst, Cranbrook.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 17 Sep 2025 at 16:27.

Kent County Council logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Cranbrook Road

Kent County Council are proposing to carry out Highway improvement works on Cranbrook Road, Hawkhurst, Cranbrook.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 17 Sep 2025 at 16:30.

Kent County Council logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Cranbrook Road

Kent County Council are proposing to carry out Highway improvement works on Cranbrook Road, Hawkhurst, Cranbrook.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Sep 2025 at 14:47.

Kent County Council logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Cranbrook Road

Kent County Council are proposing to carry out Highway improvement works on Cranbrook Road, Hawkhurst, Cranbrook.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Sep 2025 at 16:15.

UK Power Networks South Eastern logo
LONG TERM
Between
3 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Station Road

UK Power Networks South Eastern are proposing to carry out New service connection on Station Road, Tenterden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Jul 2025 at 16:22.

BT logo
Between
7 and 10 Nov 2025
Details
View Map
Share
Follow
Peters Green Road

BT are proposing to carry out Utility asset works on Peters Green Road, East Sussex, Bodiam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 10 November 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 8 Sep 2025 at 09:06.

South East Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Golford Road

South East Water are proposing to carry out Utility asset works on Golford Road, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 11 Sep 2025 at 13:12.

South East Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Green Lane

South East Water are proposing to carry out New service connection on Green Lane, Benenden, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 28 Aug 2025 at 14:48.

South East Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Green Lane

South East Water are proposing to carry out New service connection on Green Lane, Benenden, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 2 Sep 2025 at 14:54.

South East Water logo
LONG TERM
Between
10 Nov 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Chapel Lane

South East Water are proposing to carry out Utility asset works on Chapel Lane, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 6 Aug 2025 at 15:39.

South East Water logo
LONG TERM
Between
10 Nov 2025 and 20 Mar 2026
Details
View Map
Share
Follow
Chapel Lane

South East Water are proposing to carry out Utility asset works on Chapel Lane, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 20 March 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 20 Aug 2025 at 15:39.

Southern Gas Networks logo
Between
17 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Rolvenden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rolvenden Road, Benenden, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 14 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 07:18.

Southern Gas Networks logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Goddards Green Road

Southern Gas Networks are proposing to carry out New service connection on Goddards Green Road, Benenden, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 07:22.

South East Water logo
Between
20 and 24 Nov 2025
Details
View Map
Share
Follow
Bodiam Road

South East Water are proposing to carry out Utility repair and maintenance works on Bodiam Road, Sandhurst, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 24 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 2 Sep 2025 at 14:41.

Kent County Council logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Dig Dog Lane

Kent County Council are proposing to carry out Highway improvement works on Dig Dog Lane, Frittenden, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 3 Sep 2025 at 08:02.


Roadworks Map near to Fuggles Court, CRANBROOK, TN17 4EF (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 22:33
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fuggles Court, CRANBROOK, TN17 4EF (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
MAJOR
  
WALKHURST ROAD, BENENDEN 
(0.1 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 1 Sep 2025 - 24 Oct 2025
0.1
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.