ROADWORKS SUMMARY
Mapleton Road, WESTERHAM, TN16 1PS
Introduction
View current and future planned roadworks and road closures for Mapleton Road, TN16 1PS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Mapleton Road, WESTERHAM, TN16 1PS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mapleton Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
28 Mar 2025
Thames Water are carrying out Utility repair and maintenance works on Steeple Heights Drive, Biggin Hill.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 March 2024 at 11:32 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Mar 2024 at 14:54.
21 Oct and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Jul 2024 at 06:40.
1 Nov 2024 and 1 May 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on High Street, Limpsfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 14:24.
1 Nov 2024 and 1 May 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on East Hill, Oxted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 14:19.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Westerham.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 14:45 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 12:45.
18 Dec 2024
Surrey County Council are carrying out Works for road purposes on Westerham Road, Limpsfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 09:25.
18 Nov and 18 Dec 2024
Surrey County Council are proposing to carry out Works for road purposes on Westerham Road, Limpsfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 20 Aug 2024 at 12:36.
Friday
Kent County Council are carrying out Highway improvement works on South Brook Lane, Toys Hill.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 00:00 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 28 Oct 2024 at 14:16.
Friday
Kent County Council are carrying out Highway improvement works on Bayleys Hill, Sevenoaks Weald.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 07:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 29 Nov 2024 at 06:17.
Tomorrow
Surrey County Council are carrying out Highway repair and maintenance works on Hall Hill, Oxted.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 20:34 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 07:37.
Saturday
Thames Water are carrying out Utility repair and maintenance works on Church Hill, Tatsfield.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 09:45 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 11:22.
Friday
Thames Water are carrying out Utility repair and maintenance works on Main Road, Biggin Hill.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 17:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:37.
Tomorrow
Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Titsey Road, Titsey.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 13:00 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Nov 2024 at 14:17.
Today
Thames Water are carrying out Utility repair and maintenance works on Westerham Hill, Westerham.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 November 2024 at 01:15 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 06:03.
Tuesday
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hilders Lane, Edenbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 13:07.
23 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) are carrying out New service connection on Five Fields Lane, Four Elms.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 2 Dec 2024 at 10:34.
2 and 23 Dec 2024
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Five Fields Lane, Four Elms.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 10 Sep 2024 at 13:22.
Friday
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Church Lane, Oxted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Sep 2024 at 13:11.
10 and 12 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Costells Meadow, Westerham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 15:47.
10 and 12 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Costells Meadow, Westerham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 10:20.
16 and 18 Dec 2024
UK Power Networks South Eastern were proposing to carry out New service connection on Burlings Lane, Knockholt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Oct 2024 at 15:20.
16 and 20 Dec 2024
UK Power Networks South Eastern were proposing to carry out New service connection on Burlings Lane, Knockholt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 14:58.
16 and 18 Dec 2024
Trooli are proposing to carry out Utility asset works on Rectory Lane, Brasted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Trooli on 26 Sep 2024 at 10:54.
6 and 9 Jan 2025
Thames Water are proposing to carry out Highway improvement works on Cudham Lane South, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 14:05.
6 and 8 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on Shelleys Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 09:15.
6 and 9 Jan 2025
Thames Water were proposing to carry out Highway improvement works on Cudham Lane South, Cudham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 13:24.
6 and 9 Jan 2025
Thames Water were proposing to carry out Highway improvement works on Cudham Lane South, Cudham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 13:28.
6 and 24 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on Brocas Road, Hever.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 09:41.
6 and 24 Jan 2025
Kent County Council were proposing to carry out Highway improvement works on Brocas Road, Hever.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 08:53.
6 Jan and 3 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Golf House Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Oct 2024 at 14:38.
6 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stangrove Road, Edenbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 14:18.
6 Jan and 3 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Kent Hatch Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Oct 2024 at 14:34.
8 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Roodlands Lane, Four Elms.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 16 Oct 2024 at 09:29.
8 and 10 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Roodlands Lane, Four Elms.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 16 Oct 2024 at 10:23.
9 and 13 Jan 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Berrys Green Road, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Oct 2024 at 09:29.
11 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Crowhurst Lane End, Tandridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 7 Oct 2024 at 07:41.
11 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Crowhurst Lane End, Tandridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Dec 2024 at 09:20.
13 and 15 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Hever Road, Edenbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Oct 2024 at 14:26.
13 and 15 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Hever Road, Edenbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 28 Oct 2024 at 09:57.
13 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burlings Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 06:05.
17 Jan and 3 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on Westerham Road, Bessels Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 19 Nov 2024 at 13:23.
17 Jan and 3 Feb 2025
National Highways are proposing to carry out Highway repair and maintenance works on Westerham Road, Bessels Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 Nov 2024 at 15:35.
20 and 31 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on Weald Road, Sevenoaks.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kent County Council on 25 Nov 2024 at 13:14.
20 Jan and 21 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Kent Hatch Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Oct 2024 at 16:28.
20 Jan and 21 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Golf House Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Oct 2024 at 16:28.
27 Jan and 24 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Lane, Oxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 07:14.
27 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bessels Green Road, Bessels Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:25.
27 Jan and 24 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on West Hill, Oxted.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 07:14.
3 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crouch House Road, Edenbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 14:55.
3 and 7 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burlings Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Nov 2024 at 06:01.
3 and 5 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Sundridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 13:16.
10 and 14 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Belvedere Road, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 14:21.
10 and 18 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Belvedere Road, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:02.
10 and 18 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Belvedere Road, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:22.
14 Feb and 2 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on Westerham Road, Bessels Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 22 Nov 2024 at 09:21.
14 Feb and 3 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on Westerham Road, Bessels Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 27 Nov 2024 at 08:31.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Nov 2024 at 07:00.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 14:54.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 10:29.
24 Feb and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Brasted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 06:09.
24 Feb and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Manor House Gardens, Edenbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 14:52.
3 and 5 Mar 2025
South East Water are proposing to carry out Utility repair and maintenance works on Ashgrove Road, Sevenoaks.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 3 Dec 2024 at 06:29.
Roadworks Map near to Mapleton Road, WESTERHAM, TN16 1PS
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Mapleton Road, WESTERHAM, TN16 1PS (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.