ROADWORKS SUMMARY
Burlings Lane, SEVENOAKS, TN14 7PD
Introduction
View current and future planned roadworks and road closures for Burlings Lane, TN14 7PD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Burlings Lane, SEVENOAKS, TN14 7PD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Burlings Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
28 Mar 2025
Thames Water are carrying out Utility repair and maintenance works on Steeple Heights Drive, Biggin Hill.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 March 2024 at 11:32 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Mar 2024 at 14:54.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 7 May 2024 at 13:03.
24 Jan 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Homestead Road, Chelsfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2024 at 10:50 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:15.
6 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on The Meadows, Halstead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 October 2024 at 16:45 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 14:10.
14 Oct and 2 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Meadway, Halstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 15:30.
21 Oct and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Jul 2024 at 06:40.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on High Street, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Jul 2024 at 12:07.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Worlds End Lane, Orpington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:10 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:22.
4 Nov and 15 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Road Hill, Downe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:12.
4 Nov and 15 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rookery Road, Downe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:12.
6 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Shoreham Lane, Halstead.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:30 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 08:46.
11 Nov and 9 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Southdene, Halstead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 10:01.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Westerham.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 14:45 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:17.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on New Road Hill, Downe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 09:03.
Tuesday
Southern Gas Networks are carrying out New service connection on Stoneings Lane, Knockholt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 10:35 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:41.
Tuesday
Southern Gas Networks are proposing to carry out New service connection on Stoneings Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Aug 2024 at 08:35.
18 Nov and 6 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:28.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Rookery Road, Downe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:59.
18 Dec 2024
Surrey County Council are carrying out Works for road purposes on Westerham Road, Limpsfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 09:25.
18 Nov and 18 Dec 2024
Surrey County Council are proposing to carry out Works for road purposes on Westerham Road, Limpsfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 20 Aug 2024 at 12:36.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on High Elms Road, Downe.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 16:45 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 09:30.
25 and 29 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Main Road, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 06:24.
Wednesday
Thames Water are proposing to carry out New service connection on Stonehouse Lane, Halstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Sep 2024 at 06:10.
25 and 28 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Market Square, Westerham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 06:28.
Wednesday
Kent County Council were proposing to carry out Highway improvement works on Daltons Road, Crockenhill.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Kent County Council on 15 Nov 2024 at 08:14.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 08:20.
3 Dec 2024
Kent County Council are carrying out Highway improvement works on Holly Bush Lane, Sevenoaks.
The road is closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 3 December 2024 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 12 Nov 2024 at 06:54.
20 Dec 2024
Kent County Council are carrying out Highway improvement works on Fackenden Lane, Shoreham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 19 Nov 2024 at 10:31.
10 and 12 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Costells Meadow, Westerham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 15:47.
10 and 12 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Costells Meadow, Westerham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 10:20.
12 and 15 Dec 2024
London Borough Of Bromley are proposing to carry out Highway improvement works on Lovibonds Avenue, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 25 Sep 2024 at 09:05.
16 and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Pilgrims Way West, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Sep 2024 at 07:04.
16 and 20 Dec 2024
UK Power Networks South Eastern were proposing to carry out New service connection on Burlings Lane, Knockholt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 14:58.
16 and 18 Dec 2024
Trooli are proposing to carry out Utility asset works on Rectory Lane, Brasted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Trooli on 26 Sep 2024 at 10:54.
16 and 18 Dec 2024
UK Power Networks South Eastern were proposing to carry out New service connection on Burlings Lane, Knockholt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Oct 2024 at 15:20.
2 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hale Lane, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 11:49.
2 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 17:18.
2 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 09:56.
2 and 10 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willow Park, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 10:33.
2 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Telston Lane, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 10:42.
6 and 10 Jan 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Polesteeple Hill, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 25 Sep 2024 at 09:05.
6 Jan and 3 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Kent Hatch Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Oct 2024 at 14:34.
6 Jan and 3 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Golf House Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Oct 2024 at 14:38.
6 and 19 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hale Lane, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:50.
6 and 10 Jan 2025
BT are proposing to carry out Utility asset works on Bradbourne Road, Sevenoaks.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Oct 2024 at 12:29.
6 and 14 Jan 2025
BT are proposing to carry out Utility asset works on Bradbourne Road, Sevenoaks.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Oct 2024 at 14:06.
6 and 9 Jan 2025
Thames Water are proposing to carry out Highway improvement works on Cudham Lane South, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 14:05.
6 and 9 Jan 2025
Thames Water were proposing to carry out Highway improvement works on Cudham Lane South, Cudham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 13:28.
6 and 9 Jan 2025
Thames Water were proposing to carry out Highway improvement works on Cudham Lane South, Cudham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 13:24.
6 and 8 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on Shelleys Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 09:15.
8 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Jail Lane, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 17:18.
8 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Jail Lane, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:17.
9 and 13 Jan 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Berrys Green Road, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Oct 2024 at 09:29.
13 and 17 Jan 2025
Thames Water were proposing to carry out New service connection on Jail Lane, Biggin Hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 10:14.
13 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burlings Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 06:05.
14 and 16 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on New Barn Lane, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 10:28.
17 Jan and 3 Feb 2025
National Highways are proposing to carry out Highway repair and maintenance works on Westerham Road, Bessels Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 Nov 2024 at 15:35.
17 Jan and 3 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on Westerham Road, Bessels Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 19 Nov 2024 at 13:23.
20 Jan and 21 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Kent Hatch Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Oct 2024 at 16:28.
20 Jan and 26 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waring Drive, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 09:28.
20 Jan and 21 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Golf House Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Oct 2024 at 16:28.
20 and 22 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on Park Lane, Sevenoaks.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kent County Council on 29 Oct 2024 at 08:06.
27 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Bessels Green Road, Bessels Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:25.
27 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Gardens, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 11:31.
27 Jan and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Meadway, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 11:24.
3 and 5 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Sundridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 13:16.
10 and 18 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Belvedere Road, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:20.
10 and 18 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Belvedere Road, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:22.
10 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Woodlands, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 11:18.
14 Feb and 2 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on Westerham Road, Bessels Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 10:20.
15 Feb and 2 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shire Lane, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 10:26.
17 Feb and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Approach, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:42.
17 and 20 Feb 2025
Thames Water are proposing to carry out New service connection on Jail Lane, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:11.
17 and 21 Feb 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Lovibonds Avenue, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 15 Oct 2024 at 09:12.
17 and 25 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Starts Hill Road, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:22.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 10:29.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 14:54.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Nov 2024 at 07:00.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Pilgrims Way West, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2024 at 09:04.
17 and 20 Feb 2025
Thames Water were proposing to carry out New service connection on Jail Lane, Biggin Hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:10.
Roadworks Map near to Burlings Lane, SEVENOAKS, TN14 7PD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Burlings Lane, SEVENOAKS, TN14 7PD (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Nov 2024 - 26 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.