ROADWORKS SUMMARY
Serpentine Road, SEVENOAKS, TN13 3XP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Serpentine Road, TN13 3XP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Serpentine Road, SEVENOAKS, TN13 3XP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Serpentine Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 16 Jun 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 9 Jan 2025 at 13:01.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Brittains Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Brittains Lane, Sevenoaks.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:30 and could run through until 8 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 09:57.

Southern Gas Networks logo
LONG TERM
Between
9 Apr and 16 Jul 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 16 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Jan 2025 at 12:52.

Southern Gas Networks logo
LONG TERM
Until
21 Jul 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Rushmore Hill, Knockholt.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:30 and could run through until 21 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 16:00.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Jan 2025 at 15:04.

Southern Gas Networks logo
LONG TERM
Between
21 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Croft Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croft Way, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 14:44.

Southern Gas Networks logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Croft Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Croft Way, Sevenoaks.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 12:26.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Redlands Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redlands Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 20 Mar 2025 at 09:44.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 30 Jun 2025
Details
View Map
Share
Follow
Brittains Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brittains Lane, Sevenoaks.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 11:17.

Southern Gas Networks logo
LONG TERM
Until
26 Jun 2025
Details
View Map
Share
Follow
Downsview Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Downsview Road, Sevenoaks.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2025 at 13:20 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 13:45.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Hillingdon Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Hillingdon Avenue, Sevenoaks.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 May 2025 at 15:30 and could run through until 8 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 12:35.

Southern Gas Networks logo
LONG TERM
Between
12 May and 16 Jul 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Jan 2025 at 09:14.

Southern Gas Networks logo
LONG TERM
Between
12 May and 16 Jul 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 09:18.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Redlands Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Redlands Road, Sevenoaks.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 15:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 15:12.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Seal Hollow Road

Thames Water were proposing to carry out Utility repair and maintenance works on Seal Hollow Road, Sevenoaks.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 08:18.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Seal Hollow Road

Thames Water are carrying out Utility repair and maintenance works on Seal Hollow Road, Sevenoaks.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 12:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 12:31.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Little Wood

Southern Gas Networks are carrying out Utility repair and maintenance works on Little Wood, Sevenoaks.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 10:00 and could run through until 8 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 12:42.

South East Water logo
Finishing
Today
Details
View Map
Share
Follow
St Clere Hill Road

South East Water are carrying out Utility repair and maintenance works on St Clere Hill Road, West Kingsdown.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 09:23 and could run through until 3 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 2 Jun 2025 at 14:54.

Kent County Council logo
LONG TERM
Between
2 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Springshaw Close

Kent County Council are proposing to carry out Highway improvement works on Springshaw Close, Bessels Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 27 May 2025 at 08:00.

South East Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Exedown Road

South East Water are proposing to carry out New service connection on Exedown Road, Wrotham, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 11 Mar 2025 at 08:24.

South East Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Exedown Road

South East Water are carrying out New service connection on Exedown Road, Wrotham, Sevenoaks.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 4 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 2 Jun 2025 at 10:44.

South East Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Eggpie Lane

South East Water are proposing to carry out New service connection on Eggpie Lane, Hildenborough, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 14 Apr 2025 at 15:16.

South East Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Eggpie Lane

South East Water are proposing to carry out New service connection on Eggpie Lane, Hildenborough, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 22 May 2025 at 08:19.

Southern Gas Networks logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Mill Lane

Southern Gas Networks are proposing to carry out Remedial works on Mill Lane, Underriver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 08:06.

South East Water logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Plaxtol Lane

South East Water are proposing to carry out New service connection on Plaxtol Lane, Plaxtol, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 25 Mar 2025 at 13:42.

Kent County Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Otford Road

Kent County Council are proposing to carry out Highway improvement works on Otford Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 12 Nov 2024 at 06:25.

Kent County Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Sevenoaks Road

Kent County Council are proposing to carry out Highway improvement works on Sevenoaks Road, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 12 Nov 2024 at 06:28.

BT logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Coldharbour Lane

BT are proposing to carry out Utility asset works on Coldharbour Lane, Kent, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Mar 2025 at 07:26.

Kent County Council logo
Between
11 and 18 Jun 2025
Details
View Map
Share
Follow
Otford Road

Kent County Council are proposing to carry out Highway improvement works on Otford Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Feb 2025 at 14:03.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Sundridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jan 2025 at 06:19.

UK Power Networks South Eastern logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Rings Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on Rings Hill, Hildenborough, Tonbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Apr 2025 at 09:05.

Kent County Council logo
Between
23 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Grassy Lane

Kent County Council are proposing to carry out Highway improvement works on Grassy Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 6 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 1 Apr 2025 at 09:10.

Kent County Council logo
Between
23 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Grassy Lane

Kent County Council are proposing to carry out Highway improvement works on Grassy Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 6 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 1 Apr 2025 at 13:31.

South East Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
London Road

South East Water are proposing to carry out Remedial works on London Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 19 Mar 2025 at 14:48.

South East Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
London Road

South East Water are proposing to carry out Remedial works on London Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 22 Apr 2025 at 09:49.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Otford Lane

Thames Water are proposing to carry out New service connection on Otford Lane, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 11:11.

Thames Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Otford Lane

Thames Water are proposing to carry out New service connection on Otford Lane, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 08:59.

UK Power Networks South Eastern logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Knighton Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Knighton Road, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Apr 2025 at 08:30.

UK Power Networks South Eastern logo
Between
25 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Knighton Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Knighton Road, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Apr 2025 at 06:09.

Southern Gas Networks logo
Between
30 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Coldharbour Lane

Southern Gas Networks are proposing to carry out New service connection on Coldharbour Lane, Hildenborough, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Mar 2025 at 08:20.

Southern Gas Networks logo
Between
30 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Coldharbour Lane

Southern Gas Networks are proposing to carry out New service connection on Coldharbour Lane, Hildenborough, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 08:14.

Kent County Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Maidstone Road

Kent County Council were proposing to carry out Highway improvement works on Maidstone Road, Seal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 May 2025 at 07:29.

Kent County Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
High Street

Kent County Council were proposing to carry out Highway improvement works on High Street, Seal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 May 2025 at 07:29.

South East Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Pounsley Road

South East Water are proposing to carry out New service connection on Pounsley Road, Dunton Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 1 Apr 2025 at 12:39.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Pound Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Pound Lane, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 08:11.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Pound Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Pound Lane, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:48.

South East Water logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Eggpie Lane

South East Water are proposing to carry out New service connection on Eggpie Lane, Hildenborough, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 14 Apr 2025 at 08:35.

South East Water logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Kemsing Road

South East Water are proposing to carry out Utility repair and maintenance works on Kemsing Road, Wrotham, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 2 Apr 2025 at 08:47.

South East Water logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Kemsing Road

South East Water are proposing to carry out Utility repair and maintenance works on Kemsing Road, Wrotham, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 22 May 2025 at 08:20.

Southern Gas Networks logo
LONG TERM
Between
2 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 26 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 10:29.

Kent County Council logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Chart Lane

Kent County Council are proposing to carry out Section 50 on Chart Lane, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the verge only.

This roadwork event was last updated by Kent County Council on 1 May 2025 at 15:40.

Kent County Council logo
Between
3 and 5 Jul 2025
Details
View Map
Share
Follow
Chart Lane

Kent County Council are proposing to carry out Section 50 on Chart Lane, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the verge only.

This roadwork event was last updated by Kent County Council on 2 May 2025 at 06:15.

Kent County Council logo
Between
7 and 20 Jul 2025
Details
View Map
Share
Follow
Oak Lane

Kent County Council are proposing to carry out Highway improvement works on Oak Lane, Sevenoaks.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 20 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 1 Apr 2025 at 08:39.

Kent County Council logo
Between
7 and 20 Jul 2025
Details
View Map
Share
Follow
Oak Lane

Kent County Council are proposing to carry out Highway improvement works on Oak Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 20 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 1 Apr 2025 at 09:10.

Kent County Council logo
Between
7 and 20 Jul 2025
Details
View Map
Share
Follow
Oak Lane

Kent County Council are proposing to carry out Highway improvement works on Oak Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 20 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 1 Apr 2025 at 13:34.

Southern Gas Networks logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out New service connection on High Street, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 09:08.

Southern Gas Networks logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out New service connection on High Street, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 11:04.

Kent County Council logo
LONG TERM
Between
7 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Wickenden Road

Kent County Council are proposing to carry out Highway improvement works on Wickenden Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 12 May 2025 at 06:48.

Kent County Council logo
LONG TERM
Between
7 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Wickenden Road

Kent County Council are proposing to carry out Highway improvement works on Wickenden Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 12 May 2025 at 09:20.

Kent County Council logo
LONG TERM
Between
7 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Wickenden Road

Kent County Council are proposing to carry out Highway improvement works on Wickenden Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 9 May 2025 at 05:59.

UK Power Networks South Eastern logo
Between
9 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Rings Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on Rings Hill, Hildenborough, Tonbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 5 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Apr 2025 at 11:57.

National Highways logo
Between
9 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Morants Court Road

National Highways are proposing to carry out Works for road purposes on Morants Court Road, Dunton Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Apr 2025 at 09:20.

National Highways logo
Between
9 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Sundridge Road

National Highways are proposing to carry out Works for road purposes on Sundridge Road, Dunton Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Apr 2025 at 09:22.

National Highways logo
Between
9 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Polhill

National Highways are proposing to carry out Works for road purposes on Polhill, Halstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Apr 2025 at 09:21.

National Highways logo
Between
9 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Star Hill Road

National Highways are proposing to carry out Works for road purposes on Star Hill Road, Dunton Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 10 Apr 2025 at 09:22.

UK Power Networks South Eastern logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Blueberry Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Blueberry Lane, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Apr 2025 at 07:09.

Kent County Council logo
Between
15 and 22 Jul 2025
Details
View Map
Share
Follow
Carters Hill

Kent County Council are proposing to carry out Highway repair and maintenance works on Carters Hill, Underriver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 26 Mar 2025 at 08:48.

Thames Water logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Chart Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Chart Lane, Brasted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 12:10.

Thames Water logo
Between
17 and 19 Jul 2025
Details
View Map
Share
Follow
Chart Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Chart Lane, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 15:12.

Thames Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Chart Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Chart Lane, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 11:10.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Borough Green Road

UK Power Networks South Eastern are proposing to carry out New service connection on Borough Green Road, Wrotham, Sevenoaks.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Feb 2025 at 13:14.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Borough Green Road

UK Power Networks South Eastern are proposing to carry out New service connection on Borough Green Road, Wrotham, Sevenoaks.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Mar 2025 at 07:44.

UK Power Networks South Eastern logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Borough Green Road

UK Power Networks South Eastern are proposing to carry out New service connection on Borough Green Road, Wrotham, Sevenoaks.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Mar 2025 at 15:49.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 13:36.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Otford Lane

Thames Water were proposing to carry out New service connection on Otford Lane, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 24 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 10:08.

Southern Gas Networks logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Knockholt Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Knockholt Road, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 13:08.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Oak Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oak Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 10:39.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Oak Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oak Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 13:10.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Ashgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashgrove Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 10:37.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Ashgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashgrove Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 13:09.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Dibden Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dibden Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 10:34.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Dibden Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dibden Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 13:09.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Brittains Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brittains Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 10:38.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Brittains Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brittains Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 13:10.

South East Water logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Park Lane

South East Water are proposing to carry out Utility repair and maintenance works on Park Lane, Godden Green, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 20 May 2025 at 06:09.

South East Water logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Park Lane

South East Water are proposing to carry out Utility repair and maintenance works on Park Lane, Godden Green, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 2 Jun 2025 at 14:01.

Southern Gas Networks logo
Between
23 Jul and 19 Aug 2025
Details
View Map
Share
Pilgrims Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Pilgrims Way, Kemsing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 19 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 May 2025 at 10:24.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 31 Aug 2025
Details
View Map
Share
Shoreham Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Shoreham Lane, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 13:11.

Kent County Council logo
Between
27 and 31 Jul 2025
Details
View Map
Share
Maidstone Road

Kent County Council were proposing to carry out Highway improvement works on Maidstone Road, Seal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 July 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 13:19.

Kent County Council logo
Between
27 and 31 Jul 2025
Details
View Map
Share
High Street

Kent County Council were proposing to carry out Highway improvement works on High Street, Seal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 July 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 13:19.

South East Water logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Plaxtol Lane

South East Water are proposing to carry out New service connection on Plaxtol Lane, Plaxtol, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 20 May 2025 at 08:41.

Kent County Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ovenden Road

Kent County Council are proposing to carry out Highway improvement works on Ovenden Road, Sundridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 29 Apr 2025 at 11:46.

Kent County Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ovenden Road

Kent County Council are proposing to carry out Highway improvement works on Ovenden Road, Sundridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 30 Apr 2025 at 06:05.

South East Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Fen Pond Road

South East Water are proposing to carry out Utility repair and maintenance works on Fen Pond Road, Ightham, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 25 Apr 2025 at 10:48.

South East Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Fen Pond Road

South East Water are proposing to carry out Utility repair and maintenance works on Fen Pond Road, Ightham, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 30 Apr 2025 at 11:28.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Sevenoaks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sevenoaks Road, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 13:42.

UK Power Networks South Eastern logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Terrys Lodge Road

UK Power Networks South Eastern are proposing to carry out New service connection on Terrys Lodge Road, Wrotham, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 09:13.

UK Power Networks South Eastern logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Terrys Lodge Road

UK Power Networks South Eastern are proposing to carry out New service connection on Terrys Lodge Road, Wrotham, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 09:45.

South East Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Terrys Lodge Road

South East Water are proposing to carry out New service connection on Terrys Lodge Road, Wrotham, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 6 May 2025 at 10:26.

Southern Gas Networks logo
Between
29 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Cade Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Cade Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 6 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 May 2025 at 13:47.

Southern Gas Networks logo
Between
29 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Cade Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Cade Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 6 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 08:35.

Kent County Council logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Coppings Road

Kent County Council are proposing to carry out Highway improvement works on Coppings Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 29 Apr 2025 at 13:54.

Kent County Council logo
Between
4 and 16 Aug 2025
Details
View Map
Share
Follow
Coppings Road

Kent County Council are proposing to carry out Highway improvement works on Coppings Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 16 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 21 May 2025 at 10:27.

Thames Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Sundridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 13:58.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Westerham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westerham Road, Bessels Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 06:50.

Southern Gas Networks logo
Between
11 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Homedean Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Homedean Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 9 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 06:50.

Southern Gas Networks logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Shoreham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Shoreham Road, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Feb 2025 at 13:09.

South East Water logo
Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Coldharbour Lane

South East Water are proposing to carry out Utility repair and maintenance works on Coldharbour Lane, Hildenborough, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 13 May 2025 at 07:28.

UK Power Networks South Eastern logo
Between
13 and 29 Aug 2025
Details
View Map
Share
Follow
Wrotham Road

UK Power Networks South Eastern are proposing to carry out New service connection on Wrotham Road, Borough Green, Sevenoaks.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Feb 2025 at 13:16.

National Highways logo
Between
15 and 30 Aug 2025
Details
View Map
Share
Follow
Noahs Ark

National Highways are proposing to carry out Works for road purposes on Noahs Ark, Kemsing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Mar 2025 at 10:43.

National Highways logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Noahs Ark

National Highways were proposing to carry out Works for road purposes on Noahs Ark, Kemsing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Mar 2025 at 18:06.

National Highways logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Noahs Ark

National Highways were proposing to carry out Works for road purposes on Noahs Ark, Kemsing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Mar 2025 at 18:05.

South East Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Ashgrove Road

South East Water are proposing to carry out Utility repair and maintenance works on Ashgrove Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 23 May 2025 at 06:03.


Roadworks Map near to Serpentine Road, SEVENOAKS, TN13 3XP (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 08:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Serpentine Road, SEVENOAKS, TN13 3XP (20 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
MAJOR
  
SEAL HOLLOW ROAD 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 27 May 2025 12:00
(Scheduled: 27 May 2025 - 6 Jun 2025)
0.2
Details
Share
Follow
2
Thames Water logo
MAJOR
  
SEAL HOLLOW ROAD 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Two-way signals
Cancelled
(Scheduled: 27 May 2025 - 6 Jun 2025)
0.2
Details
Share
3
South East Water logo
HITCHEN HATCH LANE 
(0.4 miles)
South East Water
Utility repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 2 Jun 2025 13:01
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.4
Details
Share
Follow
4
Southern Gas Networks logo
EMERGENCY
  
LITTLE WOOD 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
In Progress
Since: 28 May 2025 10:00
(Scheduled: 28 May 2025 - 8 Jun 2025)
0.4
Details
Share
Follow
5
Southern Gas Networks logo
URGENT
  
HILLINGDON AVENUE 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Two-way signals
In Progress
Since: 7 May 2025 15:30
(Scheduled: 7 May 2025 - 8 Jun 2025)
0.4
Details
Share
Follow
6
South East Water logo
URGENT
  
HILLINGDON AVENUE 
(0.5 miles)
South East Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 29 May 2025 12:45
(Scheduled: 29 May 2025 - 3 Jun 2025)
0.5
Details
Share
Follow
7
Kent County Council logo
URGENT
  
ST GEORGES ROAD 
(0.6 miles)
Kent County Council
Highway improvement works - Carriageway - Multi-way signals
Complete
30 May 2025 09:40 - 13:00
0.6
Details
Share
8
Kent County Council logo
KNOLE WAY 
(0.6 miles)
Kent County Council
Highway improvement works - Carriageway - Give and take
Complete
2 Jun 2025 07:27 - 09:16
0.6
Details
Share
9
Kent County Council logo
MAJOR
  
ASHLEY ROAD 
(0.6 miles)
Kent County Council
Highway improvement works - Footway -
Planned
Scheduled: 2 Jun 2025 - 21 Jun 2025
0.6
Details
Share
Follow
10
Kent County Council logo
MAJOR
  
ASHLEY ROAD 
(0.6 miles)
Kent County Council
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 21 Jun 2025
0.6
Details
Share
Follow