ROADWORKS SUMMARY
Meadow Close, SEVENOAKS, TN13 3HZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Meadow Close, TN13 3HZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Meadow Close, SEVENOAKS, TN13 3HZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Meadow Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Kent County Council logo
LONG TERM
Between
7 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Wickenden Road

Kent County Council are proposing to carry out Highway improvement works on Wickenden Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 12 May 2025 at 06:48.

Kent County Council logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Wickenden Road

Kent County Council are carrying out Highway improvement works on Wickenden Road, Sevenoaks.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 08:40 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 10 Sep 2025 at 11:38.

Kent County Council logo
LONG TERM
Between
7 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Wickenden Road

Kent County Council are proposing to carry out Highway improvement works on Wickenden Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 9 May 2025 at 05:59.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 17 Oct 2025
Details
View Map
Share
Follow
Rushmore Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 19:00.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Halstead Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halstead Lane, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 12:23.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Halstead Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halstead Lane, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 17:24.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Knockholt Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Knockholt Road, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 27 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 12:23.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Knockholt Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Knockholt Road, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 27 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 17:23.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Camberwell Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Camberwell Lane, Ide Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Jun 2025 at 13:23.

UK Power Networks South Eastern logo
Finishing
Monday
Details
View Map
Share
Follow
Camberwell Lane

UK Power Networks South Eastern are carrying out New service connection on Camberwell Lane, Ide Hill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:09 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Sep 2025 at 13:58.

South East Water logo
Until
29 Sep 2025
Details
View Map
Share
Follow
Mill Lane

South East Water are carrying out Utility repair and maintenance works on Mill Lane, Underriver.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 17:49 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 17 Sep 2025 at 15:06.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Chart Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Chart Lane, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Jul 2025 at 08:34.

National Highways logo
Finishing
Monday
Details
View Map
Share
Follow
Morants Court Road

National Highways are proposing to carry out Works for road purposes on Morants Court Road, Dunton Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Jun 2025 at 13:28.

Kent County Council logo
Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
Dibden Lane

Kent County Council are proposing to carry out roadworks on Dibden Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 12 Jun 2025 at 09:13.

Trooli logo
Between
22 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Rectory Lane

Trooli are proposing to carry out Utility asset works on Rectory Lane, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 1 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Trooli on 7 Jul 2025 at 11:02.

Trooli logo
Between
22 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Rectory Lane

Trooli are proposing to carry out Utility asset works on Rectory Lane, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 1 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Trooli on 16 Jul 2025 at 07:44.

Trooli logo
Between
22 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Brasted Hill Road

Trooli are proposing to carry out Utility asset works on Brasted Hill Road, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 1 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Trooli on 7 Jul 2025 at 11:11.

Trooli logo
Between
22 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Brasted Hill Road

Trooli are proposing to carry out Utility asset works on Brasted Hill Road, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 1 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Trooli on 16 Jul 2025 at 07:44.

Kent County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Rye Lane

Kent County Council are carrying out Remedial works on Rye Lane, Otford.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 22 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 17 Sep 2025 at 12:45.

South East Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Telston Lane

South East Water are proposing to carry out New service connection on Telston Lane, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 27 Jun 2025 at 05:54.

Thames Water logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Church Road

Thames Water were proposing to carry out New service connection on Church Road, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jun 2025 at 16:21.

National Highways logo
Between
26 and 29 Sep 2025
Details
View Map
Share
Follow
Morants Court Road

National Highways are proposing to carry out Works for road purposes on Morants Court Road, Dunton Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Jun 2025 at 13:27.

Kent County Council logo
Between
27 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Pembroke Road

Kent County Council are proposing to carry out Works for road purposes on Pembroke Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 6 Aug 2025 at 12:00.

Kent County Council logo
Between
27 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Pembroke Road

Kent County Council are proposing to carry out Works for road purposes on Pembroke Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 6 Aug 2025 at 12:53.

South East Water logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
High Street

South East Water are proposing to carry out Utility repair and maintenance works on High Street, Seal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 1 Jul 2025 at 14:50.

UK Power Networks South Eastern logo
Between
2 and 8 Oct 2025
Details
View Map
Share
Follow
Lower Street

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Lower Street, Hildenborough, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 8 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Jul 2025 at 14:43.

Kent County Council logo
LONG TERM
Between
3 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Sundridge Road

Kent County Council are proposing to carry out Highway improvement works on Sundridge Road, Dunton Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 18 Sep 2025 at 15:03.

National Highways logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Morants Court Road

National Highways are proposing to carry out Works for road purposes on Morants Court Road, Dunton Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Sep 2025 at 09:45.

Trooli logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Coles Lane

Trooli are proposing to carry out Utility repair and maintenance works on Coles Lane, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Trooli on 10 Jul 2025 at 11:32.

Trooli logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Coles Lane

Trooli are proposing to carry out Utility repair and maintenance works on Coles Lane, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Trooli on 16 Jul 2025 at 07:46.

Thames Water logo
Between
6 and 9 Oct 2025
Details
View Map
Share
Church Road

Thames Water were proposing to carry out New service connection on Church Road, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 9 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 14:02.

Kent County Council logo
Between
7 and 14 Oct 2025
Details
View Map
Share
Follow
Seal Hollow Road

Kent County Council are proposing to carry out Highway improvement works on Seal Hollow Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Jul 2025 at 08:32.

Kent County Council logo
Between
7 and 14 Oct 2025
Details
View Map
Share
Follow
Seal Hollow Road

Kent County Council are proposing to carry out Highway improvement works on Seal Hollow Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 24 Jul 2025 at 10:50.

National Highways logo
Between
10 and 13 Oct 2025
Details
View Map
Share
Follow
Morants Court Road

National Highways are proposing to carry out Works for road purposes on Morants Court Road, Dunton Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Sep 2025 at 09:44.

Kent County Council logo
Between
13 and 21 Oct 2025
Details
View Map
Share
Follow
Pembroke Road

Kent County Council are proposing to carry out Highway improvement works on Pembroke Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Jul 2025 at 08:40.

Kent County Council logo
Between
13 and 18 Oct 2025
Details
View Map
Share
Follow
Pembroke Road

Kent County Council are proposing to carry out Highway improvement works on Pembroke Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Jul 2025 at 08:43.

Kent County Council logo
Between
13 and 18 Oct 2025
Details
View Map
Share
Follow
Pembroke Road

Kent County Council are proposing to carry out Highway improvement works on Pembroke Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 22 Jul 2025 at 12:11.

South East Water logo
LONG TERM
Between
13 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Chipstead Park

South East Water are proposing to carry out Utility asset works on Chipstead Park, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 6 Aug 2025 at 10:28.

South East Water logo
LONG TERM
Between
13 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Chipstead Park

South East Water are proposing to carry out Utility asset works on Chipstead Park, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 14 Aug 2025 at 10:22.

South East Water logo
LONG TERM
Between
13 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Chipstead Park

South East Water are proposing to carry out Utility asset works on Chipstead Park, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 14 Aug 2025 at 12:49.

South East Water logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Telston Lane

South East Water are proposing to carry out New service connection on Telston Lane, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 27 Jun 2025 at 11:53.

National Highways logo
Between
17 and 20 Oct 2025
Details
View Map
Share
Follow
Morants Court Road

National Highways are proposing to carry out Works for road purposes on Morants Court Road, Dunton Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Sep 2025 at 15:34.

South East Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Ashgrove Road

South East Water are proposing to carry out Utility repair and maintenance works on Ashgrove Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 28 May 2025 at 07:24.

UK Power Networks South Eastern logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Oak Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Oak Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Jul 2025 at 06:35.

South East Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Oak Lane

South East Water are proposing to carry out New service connection on Oak Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 20 Aug 2025 at 05:57.

UK Power Networks South Eastern logo
Between
20 and 28 Oct 2025
Details
View Map
Share
Follow
Church Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Road, Stone Street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Jul 2025 at 14:23.

UK Power Networks South Eastern logo
Between
20 and 28 Oct 2025
Details
View Map
Share
Follow
Church Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Church Road, Stone Street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Jul 2025 at 11:43.

Kent County Council logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
High Street

Kent County Council are proposing to carry out Section 50 on High Street, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 7 Jul 2025 at 10:11.

Kent County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Witches Lane

Kent County Council are proposing to carry out Highway improvement works on Witches Lane, Riverhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Aug 2025 at 08:23.

Kent County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Witches Lane

Kent County Council are proposing to carry out Highway improvement works on Witches Lane, Riverhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Aug 2025 at 10:31.

Kent County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Witches Lane

Kent County Council are proposing to carry out Highway improvement works on Witches Lane, Riverhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 12 Aug 2025 at 15:39.

Kent County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Chipstead Lane

Kent County Council are proposing to carry out Highway improvement works on Chipstead Lane, Riverhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Aug 2025 at 08:22.

Kent County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Chipstead Lane

Kent County Council are proposing to carry out Highway improvement works on Chipstead Lane, Riverhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Aug 2025 at 10:31.

Kent County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Barnfield Road

Kent County Council are proposing to carry out Highway improvement works on Barnfield Road, Riverhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Aug 2025 at 08:23.

Kent County Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Barnfield Road

Kent County Council are proposing to carry out Highway improvement works on Barnfield Road, Riverhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Aug 2025 at 10:30.

South East Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Pilgrims Way

South East Water are proposing to carry out Utility repair and maintenance works on Pilgrims Way, Kemsing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 4 Jun 2025 at 09:42.

South East Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Pilgrims Way

South East Water are proposing to carry out Utility repair and maintenance works on Pilgrims Way, Kemsing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 7 Aug 2025 at 06:16.

Southern Gas Networks logo
Between
20 and 25 Oct 2025
Details
View Map
Share
Follow
Pilgrims Way West

Southern Gas Networks are proposing to carry out New service connection on Pilgrims Way West, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 06:12.

South East Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Twitton Lane

South East Water are proposing to carry out Utility repair and maintenance works on Twitton Lane, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 12 Aug 2025 at 07:16.

UK Power Networks South Eastern logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Rushmore Hill

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Rushmore Hill, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Jul 2025 at 06:23.

Kent County Council logo
Between
22 and 31 Oct 2025
Details
View Map
Share
Follow
Oakdene Road

Kent County Council are proposing to carry out Highway improvement works on Oakdene Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 May 2025 at 13:51.

Kent County Council logo
Between
22 and 31 Oct 2025
Details
View Map
Share
Follow
Oakdene Road

Kent County Council are proposing to carry out Highway improvement works on Oakdene Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 22 May 2025 at 06:17.

Kent County Council logo
Between
22 and 31 Oct 2025
Details
View Map
Share
Follow
Oakdene Road

Kent County Council are proposing to carry out Highway improvement works on Oakdene Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 May 2025 at 06:31.

UK Power Networks South Eastern logo
Between
22 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Main Road

UK Power Networks South Eastern are proposing to carry out New service connection on Main Road, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Aug 2025 at 06:48.

UK Power Networks South Eastern logo
Between
23 and 26 Oct 2025
Details
View Map
Share
Follow
Oak Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Oak Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Aug 2025 at 14:21.

Kent County Council logo
Between
23 and 31 Oct 2025
Details
View Map
Share
Follow
Broomfield Road

Kent County Council are proposing to carry out Highway improvement works on Broomfield Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 May 2025 at 06:25.

Kent County Council logo
Between
23 and 31 Oct 2025
Details
View Map
Share
Follow
Broomfield Road

Kent County Council are proposing to carry out Highway improvement works on Broomfield Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 May 2025 at 13:49.

Kent County Council logo
Between
23 and 31 Oct 2025
Details
View Map
Share
Follow
Broomfield Road

Kent County Council are proposing to carry out Highway improvement works on Broomfield Road, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 22 May 2025 at 06:16.

South East Water logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Pilgrims Way West

South East Water are proposing to carry out Utility repair and maintenance works on Pilgrims Way West, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 6 Aug 2025 at 06:49.

South East Water logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Pilgrims Way West

South East Water are proposing to carry out Utility repair and maintenance works on Pilgrims Way West, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 13 Aug 2025 at 06:00.

Southern Gas Networks logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Pilgrims Way West

Southern Gas Networks are proposing to carry out New service connection on Pilgrims Way West, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 09:21.

Southern Gas Networks logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Pilgrims Way West

Southern Gas Networks are proposing to carry out New service connection on Pilgrims Way West, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 11:23.

UK Power Networks South Eastern logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Lower Street

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Lower Street, Hildenborough, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Jul 2025 at 10:15.

South East Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Ismays Road

South East Water are proposing to carry out Utility repair and maintenance works on Ismays Road, Ivy Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 25 Jul 2025 at 09:28.

South East Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Ismays Road

South East Water are proposing to carry out Utility repair and maintenance works on Ismays Road, Ivy Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 25 Jul 2025 at 15:50.

Southern Gas Networks logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Pilgrims Way West

Southern Gas Networks are proposing to carry out New service connection on Pilgrims Way West, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jun 2025 at 08:09.

Thames Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 06:35.

UK Power Networks South Eastern logo
Between
28 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Rings Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on Rings Hill, Hildenborough, Tonbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 16 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Jul 2025 at 11:41.

South East Water logo
Between
28 and 30 Oct 2025
Details
View Map
Share
Follow
Twitton Lane

South East Water are proposing to carry out Utility repair and maintenance works on Twitton Lane, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 14 Aug 2025 at 09:23.

UK Power Networks South Eastern logo
Between
3 and 20 Nov 2025
Details
View Map
Share
Follow
Rings Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on Rings Hill, Hildenborough, Tonbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 20 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Jul 2025 at 13:41.

Trooli logo
Between
3 and 12 Nov 2025
Details
View Map
Share
Follow
Church Road

Trooli are proposing to carry out Utility asset works on Church Road, Sundridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Trooli on 5 Aug 2025 at 12:03.

South East Water logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Chipstead Park Close

South East Water are proposing to carry out Utility asset works on Chipstead Park Close, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 4 Sep 2025 at 09:39.

South East Water logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Chipstead Park Close

South East Water are proposing to carry out Utility asset works on Chipstead Park Close, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 4 Sep 2025 at 14:02.

Kent County Council logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Rye Lane

Kent County Council are proposing to carry out Highway improvement works on Rye Lane, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 1 Sep 2025 at 08:49.

Kent County Council logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
Rye Lane

Kent County Council are proposing to carry out Highway improvement works on Rye Lane, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 2 Sep 2025 at 06:28.

Kent County Council logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
High Street

Kent County Council are proposing to carry out Highway improvement works on High Street, Otford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 1 Sep 2025 at 08:51.

Kent County Council logo
Between
3 and 19 Nov 2025
Details
View Map
Share
Follow
High Street

Kent County Council are proposing to carry out Highway improvement works on High Street, Otford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 2 Sep 2025 at 06:29.

South East Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Twitton Lane

South East Water are proposing to carry out Utility repair and maintenance works on Twitton Lane, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 14 Aug 2025 at 12:54.

UK Power Networks South Eastern logo
Between
4 and 6 Nov 2025
Details
View Map
Share
Follow
Rushmore Hill

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Rushmore Hill, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Aug 2025 at 06:49.

South East Water logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Twitton Lane

South East Water are proposing to carry out Utility repair and maintenance works on Twitton Lane, Otford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 15 Aug 2025 at 05:54.

Thames Water logo
Between
7 and 9 Nov 2025
Details
View Map
Share
Follow
Pound Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Pound Lane, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 9 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 14:53.

Kent County Council logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Harrow Road

Kent County Council are proposing to carry out Section 50 on Harrow Road, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Sep 2025 at 12:30.

South East Water logo
Between
11 and 14 Nov 2025
Details
View Map
Share
Follow
Oak Lane

South East Water are proposing to carry out New service connection on Oak Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 19 Aug 2025 at 12:12.

Kent County Council logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Oakdene Road

Kent County Council were proposing to carry out Highway improvement works on Oakdene Road, Sevenoaks.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 29 May 2025 at 07:18.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Blueberry Lane

Thames Water are proposing to carry out New service connection on Blueberry Lane, Knockholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 07:05.

Kent County Council logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Shacklands Road

Kent County Council are proposing to carry out roadworks on Shacklands Road, Shoreham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 8 Sep 2025 at 13:27.

South East Water logo
Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Oak Lane

South East Water are proposing to carry out New service connection on Oak Lane, Sevenoaks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 3 Sep 2025 at 08:01.

Kent County Council logo
Between
3 and 18 Dec 2025
Details
View Map
Share
Follow
Pilgrims Way West

Kent County Council are proposing to carry out Highway improvement works on Pilgrims Way West, Dunton Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 19 May 2025 at 13:58.

Kent County Council logo
Between
3 and 18 Dec 2025
Details
View Map
Share
Follow
Pilgrims Way West

Kent County Council are proposing to carry out Highway improvement works on Pilgrims Way West, Dunton Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jul 2025 at 11:44.

Thames Water logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Shoreham Lane

Thames Water are proposing to carry out New service connection on Shoreham Lane, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 09:20.

Thames Water logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
New Road

Thames Water are proposing to carry out Utility repair and maintenance works on New Road, Sundridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 14:36.

UK Power Networks South Eastern logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Brasted Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Brasted Hill Road, Brasted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2025 at 06:07.


Roadworks Map near to Meadow Close, SEVENOAKS, TN13 3HZ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 22:33
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Meadow Close, SEVENOAKS, TN13 3HZ (24 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Kent County Council logo
MAIDSTONE ROAD 
(0.4 miles)
Kent County Council
Highway improvement works - Footway - Multi-way signals
Planned
Scheduled: 19 Sep 2025 - 20 Sep 2025
0.4
Details
Share
Follow
2
UK Power Networks South Eastern logo
URGENT
  
BRADBOURNE VALE ROAD 
(0.4 miles)
UK Power Networks South Eastern
Utility repair and maintenance works - Footway - Multi-way signals
In Progress
Since: 15 Sep 2025 09:15
(Scheduled: 15 Sep 2025 - 22 Sep 2025)
0.4
Details
Share
Follow
3
BT logo
URGENT
  
MAIDSTONE ROAD 
(0.4 miles)
BT
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 18 Sep 2025 09:30
(Scheduled: 18 Sep 2025)
0.4
Details
Share
Follow
4
Kent County Council logo
BRADBOURNE VALE ROAD 
(0.5 miles)
Kent County Council
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Sep 2025 - 19 Sep 2025
0.5
Details
Share
Follow
5
Kent County Council logo
ST JOHNS ROAD 
(0.6 miles)
Kent County Council
Section 50 - Footway - Give and take
In Progress
Since: 15 Sep 2025 08:30
(Scheduled: 15 Sep 2025 - 24 Sep 2025)
0.6
Details
Share
Follow
6
South East Water logo
THICKETTS 
(0.6 miles)
South East Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 17 Sep 2025 14:44
(Scheduled: 17 Sep 2025 - 19 Sep 2025)
0.6
Details
Share
Follow
7
Kent County Council logo
LONDON ROAD 
(0.6 miles)
Kent County Council
Highway improvement works - Footway - Two-way signals
Cancelled
(Scheduled: 18 Sep 2025 - 19 Sep 2025)
0.6
Details
Share
8
Southern Gas Networks logo
ST JOHNS HILL 
(0.7 miles)
Southern Gas Networks
Disconnection or alteration of supply - Carriageway - Two-way signals
Planned
Scheduled: 19 Sep 2025 - 25 Sep 2025
0.7
Details
Share
Follow
9
Southern Gas Networks logo
ST JOHNS HILL 
(0.7 miles)
Southern Gas Networks
Disconnection or alteration of supply - Carriageway - Two-way signals
Planned
Scheduled: 16 Sep 2025 - 19 Sep 2025
0.7
Details
Share
Follow
10
Southern Gas Networks logo
ST JOHNS HILL 
(0.7 miles)
Southern Gas Networks
Disconnection or alteration of supply - Carriageway - Two-way signals
Planned
Scheduled: 16 Sep 2025 - 18 Sep 2025
0.7