ROADWORKS SUMMARY
Goods Station Road, TUNBRIDGE WELLS, TN1 2DE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Goods Station Road, TN1 2DE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Goods Station Road, TUNBRIDGE WELLS, TN1 2DE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Goods Station Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
A21 From J A26/a2014 South West Of Tonbridge To J A26/a2014 South East Of Tonbridge S

Southern Gas Networks are carrying out Utility repair and maintenance works on A21 From J A26/a2014 South West Of Tonbridge To J A26/a2014 South East Of Tonbridge S, Tonbridge And Malling.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2023 at 10:00 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:30.

Kent County Council logo
LONG TERM
Between
9 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Bank Street

Kent County Council are proposing to carry out Utility asset works on Bank Street, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kent County Council on 2 Sep 2024 at 15:32.

Southern Gas Networks logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Garden Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Garden Road, Tonbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 16:45 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 09:39.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Garden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garden Road, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2024 at 09:48.

East Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Mayfield Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Mayfield Road, Frant.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 20 Aug 2024 at 12:11.

East Sussex County Council logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Mayfield Road

East Sussex County Council are carrying out Highway repair and maintenance works on Mayfield Road, Frant.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:32 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 22 Nov 2024 at 15:16.

East Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Frant Green Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Frant Green Road, Frant.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 20 Aug 2024 at 12:09.

East Sussex County Council logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Frant Green Road

East Sussex County Council are carrying out Highway repair and maintenance works on Frant Green Road, Frant.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:31 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 22 Nov 2024 at 15:15.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Lower Green

Kent County Council are carrying out Highway improvement works on Lower Green, Leigh.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 18 Nov 2024 at 13:38.

East Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Broom Lane

East Sussex County Council are carrying out Highway repair and maintenance works on Broom Lane, Broadwater Forest, Frant.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 19 Nov 2024 at 12:28.

South East Water logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Baltic Road

South East Water are carrying out Utility asset works on Baltic Road, Tonbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 19 Nov 2024 at 09:08.

South East Water logo
LONG TERM
Between
13 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Baltic Road

South East Water are proposing to carry out Utility asset works on Baltic Road, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 29 Aug 2024 at 12:46.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
London Road

Southern Gas Networks are carrying out Utility repair and maintenance works on London Road, Royal Tunbridge Wells.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:30 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 10:02.

Kent County Council logo
Finishing
Today
Details
View Map
Share
Follow
Lansdowne Road

Kent County Council are carrying out Highway improvement works on Lansdowne Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 20:00 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 19 Nov 2024 at 20:14.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Newcomen Road

UK Power Networks South Eastern are proposing to carry out New service connection on Newcomen Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Aug 2024 at 07:01.

Kent County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Bullingstone Lane

Kent County Council are carrying out Highway improvement works on Bullingstone Lane, Penshurst.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 12:30 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Nov 2024 at 14:00.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Claremont Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Claremont Road, Royal Tunbridge Wells.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 14:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 15:15.

South East Water logo
Finishing
Today
Details
View Map
Share
Follow
Culverden Street

South East Water are proposing to carry out Utility repair and maintenance works on Culverden Street, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 20 Aug 2024 at 15:44.

BT logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Forge Road

BT were proposing to carry out Utility repair and maintenance works on Forge Road, Eridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 21 Oct 2024 at 09:51.

BT logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Forge Road

BT were proposing to carry out Utility repair and maintenance works on Forge Road, Eridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 24 Sep 2024 at 08:57.

UK Power Networks South Eastern logo
Between
8 and 13 Dec 2024
Details
View Map
Share
Follow
Brenchley Road

UK Power Networks South Eastern are proposing to carry out New service connection on Brenchley Road, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Nov 2024 at 14:04.

UK Power Networks South Eastern logo
Between
8 and 13 Dec 2024
Details
View Map
Share
Follow
Brenchley Road

UK Power Networks South Eastern are proposing to carry out New service connection on Brenchley Road, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 11:34.

Southern Gas Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Stanley Road

Southern Gas Networks were proposing to carry out Disconnection or alteration of supply on Stanley Road, Royal Tunbridge Wells.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 09:57.

Southern Gas Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Stanley Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Stanley Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 10:41.

Southern Gas Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Stanley Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Stanley Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 13:49.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Upper Grosvenor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grosvenor Road, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 12:45.

South East Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Lyons Crescent

South East Water are proposing to carry out New service connection on Lyons Crescent, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 12 Nov 2024 at 11:08.

BT logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Fordcombe Road

BT were proposing to carry out Utility asset works on Fordcombe Road, Fordcombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:13.

South East Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Penshurst Road

South East Water are proposing to carry out Utility repair and maintenance works on Penshurst Road, Penshurst, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 17 Sep 2024 at 07:35.

South East Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Penshurst Road

South East Water are proposing to carry out Utility repair and maintenance works on Penshurst Road, Penshurst, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 14 Oct 2024 at 11:14.

South East Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Lyons Crescent

South East Water are proposing to carry out New service connection on Lyons Crescent, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 30 Oct 2024 at 15:34.

BT logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Fordcombe Road

BT were proposing to carry out Utility asset works on Fordcombe Road, Fordcombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:14.

BT logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Fordcombe Road

BT are proposing to carry out Utility asset works on Fordcombe Road, Fordcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 8 Nov 2024 at 10:29.

East Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Withyham Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Withyham Road, Groombridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 11 Sep 2024 at 12:13.

East Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Withyham Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Withyham Road, Groombridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 20 Aug 2024 at 12:21.

Southern Gas Networks logo
Between
14 Feb and 2 Mar 2025
Details
View Map
Share
Upper Grosvenor Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Upper Grosvenor Road, Royal Tunbridge Wells.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 February 2025 and run through until 2 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 10:43.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Church Road

BT are proposing to carry out Utility repair and maintenance works on Church Road, Kent, Royal Tunbridge Wells.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Nov 2024 at 09:28.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Weald View Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Weald View Road, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:36.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Judd Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Judd Road, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:36.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Baltic Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Baltic Road, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:36.

Southern Gas Networks logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Corseley Road

Southern Gas Networks are proposing to carry out New service connection on Corseley Road, Groombridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 13:36.

South East Water logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Maidstone Road

South East Water were proposing to carry out Utility repair and maintenance works on Maidstone Road, Matfield, Tonbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 27 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by South East Water on 20 Nov 2024 at 10:35.


Roadworks Map near to Goods Station Road, TUNBRIDGE WELLS, TN1 2DE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 06:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Goods Station Road, TUNBRIDGE WELLS, TN1 2DE (48 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
GROSVENOR ROAD 
(0.1 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 28 Nov 2024 - 29 Nov 2024
0.1
Details
Share
Follow
2
South East Water logo
URGENT
  
CAMDEN ROAD 
(0.1 miles)
South East Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 25 Nov 2024 19:05
(Scheduled: 25 Nov 2024 - 27 Nov 2024)
0.1
Details
Share
Follow
3
UK Power Networks South Eastern logo
TUNNEL ROAD 
(0.1 miles)
UK Power Networks South Eastern
New service connection - Footway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.1
Details
Share
Follow
4
UK Power Networks South Eastern logo
CAMDEN ROAD 
(0.1 miles)
UK Power Networks South Eastern
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 27 Nov 2024 - 3 Dec 2024
0.1
Details
Share
Follow
5
South East Water logo
MAJOR
  
CULVERDEN STREET 
(0.2 miles)
South East Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
25 Nov 2024 19:52 - 26 Nov 2024 04:41
0.2
Details
Share
6
South East Water logo
MAJOR
  
CULVERDEN STREET 
(0.2 miles)
South East Water
Utility repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.2
Details
Share
Follow
7
BT logo
CALVERLEY ROAD, KENT 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 26 Nov 2024 - 28 Nov 2024
0.2
Details
Share
Follow
8
Kent County Council logo
MAJOR
  
CHURCH ROAD 
(0.3 miles)
Kent County Council
Optional permit (no fee) e.g. for traffic management etc - Footway, Carriageway, Footpath - Some carriageway incursion
Planned
Scheduled: 1 Oct 2024 - 31 Aug 2026
0.3
Details
Share
Follow
9
Kent County Council logo
MAJOR
  
LANSDOWNE ROAD 
(0.3 miles)
Kent County Council
Highway improvement works - Carriageway - Road closure
In Progress
Since: 19 Nov 2024 20:00
(Scheduled: 19 Nov 2024 - 27 Nov 2024)
0.3
Details
Share
Follow
10
Kent County Council logo
GARDEN ROAD 
(0.3 miles)
Kent County Council
Highway improvement works - Carriageway - Two-way signals
Complete
26 Nov 2024 20:00 - 27 Nov 2024 00:12
0.3
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.