ROADWORKS SUMMARY
Churn Lane, TONBRIDGE, TN12 8HN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Churn Lane, TN12 8HN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Churn Lane, TONBRIDGE, TN12 8HN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Churn Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

UK Power Networks South Eastern logo
Finishing
Thursday
Details
View Map
Share
Follow
Tibbs Court Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Tibbs Court Lane, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Apr 2025 at 11:43.

UK Power Networks South Eastern logo
Thursday
Details
View Map
Share
Tibbs Court Lane

UK Power Networks South Eastern carried out New service connection on Tibbs Court Lane, Matfield, Tonbridge.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 30 May 2025 and 5 Jun 2025 and were actually completed between 30 May 2025 (08:12) and 3 Jun 2025 (14:20). The works impacted the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Jun 2025 at 15:54.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Staplehurst Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Staplehurst Road, Marden.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 12:30 and could run through until 9 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 13:57.

Trooli logo
Finishing
Thursday
Details
View Map
Share
Gravelly Ways

Trooli were proposing to carry out Utility asset works on Gravelly Ways, Laddingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Trooli on 6 May 2025 at 09:58.

Trooli logo
Finishing
Thursday
Details
View Map
Share
Follow
Gravelly Ways

Trooli are proposing to carry out Utility asset works on Gravelly Ways, Laddingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 28 Apr 2025 at 10:56.

Trooli logo
Finishing
Thursday
Details
View Map
Share
Follow
Gravelly Ways

Trooli are carrying out Utility asset works on Gravelly Ways, Paddock Wood, Tonbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 19:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 3 Jun 2025 at 08:47.

Trooli logo
Finishing
Thursday
Details
View Map
Share
Follow
Gravelly Ways

Trooli are proposing to carry out Utility asset works on Gravelly Ways, Paddock Wood, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 28 Apr 2025 at 12:49.

Trooli logo
Finishing
Thursday
Details
View Map
Share
Follow
Beltring Road

Trooli are carrying out Utility asset works on Beltring Road, Paddock Wood, Tonbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 19:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 3 Jun 2025 at 08:47.

Trooli logo
Finishing
Thursday
Details
View Map
Share
Follow
Beltring Road

Trooli are proposing to carry out Utility asset works on Beltring Road, Paddock Wood, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Trooli on 28 Apr 2025 at 12:49.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Five Oak Green Road

Kent County Council are carrying out Highway improvement works on Five Oak Green Road, Tudeley, Tonbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:41 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 09:46.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Five Oak Green Road

Kent County Council are carrying out Highway improvement works on Five Oak Green Road, Five Oak Green, Tonbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:43 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 09:46.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Five Oak Green Road

Kent County Council are proposing to carry out Highway improvement works on Five Oak Green Road, Five Oak Green, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Feb 2025 at 16:26.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Five Oak Green Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Five Oak Green Road, Five Oak Green, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 10 Feb 2025 at 11:05.

Kent County Council logo
LONG TERM
Between
2 Jun and 2 Oct 2025
Details
View Map
Share
Follow
Badsell Road

Kent County Council are proposing to carry out Highway improvement works on Badsell Road, Paddock Wood, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 4 Mar 2025 at 12:02.

Kent County Council logo
LONG TERM
Between
2 Jun and 2 Oct 2025
Details
View Map
Share
Follow
Maidstone Road

Kent County Council are proposing to carry out Highway improvement works on Maidstone Road, Paddock Wood, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 4 Mar 2025 at 12:02.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Five Oak Green Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Five Oak Green Road, Tudeley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 10 Feb 2025 at 11:03.

Kent County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Five Oak Green Road

Kent County Council are proposing to carry out Highway improvement works on Five Oak Green Road, Tudeley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Feb 2025 at 16:22.

UK Power Networks South Eastern logo
Finishing
Monday
Details
View Map
Share
Follow
Colliers Green Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Colliers Green Road, Cranbrook.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 18:18 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Jun 2025 at 19:37.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lamberhurst Road

UK Power Networks South Eastern are proposing to carry out Remedial works on Lamberhurst Road, Horsmonden, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Mar 2025 at 13:56.

Kent County Council logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Hunton Road

Kent County Council are proposing to carry out Highway improvement works on Hunton Road, Marden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 May 2025 at 09:27.

Kent County Council logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Hunton Road

Kent County Council are proposing to carry out Highway improvement works on Hunton Road, Marden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 May 2025 at 15:16.

UK Power Networks South Eastern logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hatmill Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Hatmill Lane, Brenchley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 May 2025 at 09:31.

UK Power Networks South Eastern logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hatmill Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Hatmill Lane, Brenchley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Mar 2025 at 10:33.

Kent County Council logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Station Road

Kent County Council are proposing to carry out Section 50 on Station Road, Paddock Wood, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 3 Apr 2025 at 15:24.

South East Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Smithers Lane

South East Water are proposing to carry out Utility repair and maintenance works on Smithers Lane, East Peckham, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 28 May 2025 at 09:57.

South East Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Folly Hill

South East Water were proposing to carry out Utility repair and maintenance works on Folly Hill, Cranbrook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by South East Water on 27 May 2025 at 11:41.

South East Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
East Street

South East Water are proposing to carry out Utility repair and maintenance works on East Street, Hunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 27 May 2025 at 13:22.

South East Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
East Street

South East Water are proposing to carry out Utility repair and maintenance works on East Street, Hunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 21 Mar 2025 at 12:56.

UK Power Networks South Eastern logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Marle Place Road

UK Power Networks South Eastern are proposing to carry out New service connection on Marle Place Road, Brenchley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Mar 2025 at 16:12.

UK Power Networks South Eastern logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Petteridge Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Petteridge Lane, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Apr 2025 at 07:21.

South East Water logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Folly Hill

South East Water are proposing to carry out Utility repair and maintenance works on Folly Hill, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 10 Apr 2025 at 14:50.

South East Water logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Folly Hill

South East Water are proposing to carry out Utility repair and maintenance works on Folly Hill, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 11 Apr 2025 at 08:09.

South East Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Redwall Lane

South East Water are proposing to carry out Utility repair and maintenance works on Redwall Lane, Linton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 1 May 2025 at 14:30.

South East Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Redwall Lane

South East Water are proposing to carry out Utility repair and maintenance works on Redwall Lane, Linton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 21 Mar 2025 at 13:02.

UK Power Networks South Eastern logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Petteridge Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Petteridge Lane, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Apr 2025 at 13:15.

South East Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Redwall Lane

South East Water are proposing to carry out New service connection on Redwall Lane, Linton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 15 Apr 2025 at 09:26.

Kent County Council logo
Between
7 and 20 Jul 2025
Details
View Map
Share
Follow
Willow Lane

Kent County Council are proposing to carry out Section 50 on Willow Lane, Paddock Wood, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 10:37.

Kent County Council logo
Between
12 and 25 Jul 2025
Details
View Map
Share
Follow
Hunton Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Hunton Road, Marden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Mar 2025 at 13:12.

Kent County Council logo
Between
13 and 25 Jul 2025
Details
View Map
Share
Follow
Hampstead Lane

Kent County Council are proposing to carry out Highway repair and maintenance works on Hampstead Lane, Yalding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Apr 2025 at 09:17.

Kent County Council logo
Between
13 and 25 Jul 2025
Details
View Map
Share
Follow
Benover Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Benover Road, Yalding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 15 Apr 2025 at 09:17.

Kent County Council logo
Between
14 and 19 Jul 2025
Details
View Map
Share
Follow
Marden Road

Kent County Council are proposing to carry out Highway improvement works on Marden Road, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 9 Apr 2025 at 07:38.

Kent County Council logo
Between
14 and 19 Jul 2025
Details
View Map
Share
Follow
Marden Road

Kent County Council are proposing to carry out Highway improvement works on Marden Road, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 8 Apr 2025 at 08:53.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Lidwells Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Lidwells Lane, Goudhurst, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Apr 2025 at 12:40.

Kent County Council logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Claygate

Kent County Council are proposing to carry out Highway repair and maintenance works on Claygate, Marden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Mar 2025 at 13:13.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Lidwells Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Lidwells Lane, Goudhurst, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Apr 2025 at 16:10.

Kent County Council logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Summerhill

Kent County Council are proposing to carry out Highway repair and maintenance works on Summerhill, Goudhurst, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 14 Apr 2025 at 14:18.

Kent County Council logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Winchet Hill

Kent County Council are proposing to carry out Highway repair and maintenance works on Winchet Hill, Goudhurst, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 14 Apr 2025 at 14:22.

Kent County Council logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Maidstone Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Maidstone Road, Horsmonden, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 14 Apr 2025 at 14:14.

Kent County Council logo
Between
15 and 29 Jul 2025
Details
View Map
Share
Follow
Crook Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Crook Road, Brenchley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 14 Apr 2025 at 14:23.

South East Water logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Maidstone Road

South East Water were proposing to carry out New service connection on Maidstone Road, Matfield, Tonbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2025 and run through until 17 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South East Water on 23 Apr 2025 at 13:52.

Kent County Council logo
Between
15 and 29 Jul 2025
Details
View Map
Share
Follow
Maidstone Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Maidstone Road, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 14 Apr 2025 at 14:24.

Kent County Council logo
Between
15 and 29 Jul 2025
Details
View Map
Share
Follow
Yew Tree Green Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Yew Tree Green Road, Horsmonden, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 14 Apr 2025 at 14:23.

Kent County Council logo
LONG TERM
Between
21 Jul and 21 Oct 2025
Details
View Map
Share
Follow
Lucks Lane

Kent County Council are proposing to carry out roadworks on Lucks Lane, Paddock Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 28 May 2025 at 09:36.

Kent County Council logo
LONG TERM
Between
24 Jul and 2 Sep 2025
Details
View Map
Share
Follow
Goudhurst Road

Kent County Council are proposing to carry out Highway improvement works on Goudhurst Road, Horsmonden, Tonbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 9 Apr 2025 at 13:02.

Kent County Council logo
LONG TERM
Between
28 Jul 2025 and 28 Feb 2026
Details
View Map
Share
Follow
Badsell Road

Kent County Council are proposing to carry out Highway improvement works on Badsell Road, Paddock Wood, Tonbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 22 Apr 2025 at 13:27.

Kent County Council logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Willow Lane

Kent County Council are proposing to carry out Section 50 on Willow Lane, Paddock Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 2 Jun 2025 at 13:57.

UK Power Networks South Eastern logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Collier Street

UK Power Networks South Eastern are proposing to carry out New service connection on Collier Street, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 May 2025 at 14:15.

Kent County Council logo
LONG TERM
Between
28 Jul 2025 and 28 Feb 2026
Details
View Map
Share
Follow
Maidstone Road

Kent County Council are proposing to carry out Highway improvement works on Maidstone Road, Paddock Wood, Tonbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 7 Apr 2025 at 08:47.

Kent County Council logo
LONG TERM
Between
28 Jul 2025 and 28 Feb 2026
Details
View Map
Share
Follow
Badsell Road

Kent County Council are proposing to carry out Highway improvement works on Badsell Road, Paddock Wood, Tonbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 10 Apr 2025 at 07:23.

South East Water logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Foxhole Lane

South East Water are proposing to carry out Utility repair and maintenance works on Foxhole Lane, Matfield, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 29 Apr 2025 at 12:25.

South East Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Fairmans Lane

South East Water are proposing to carry out New service connection on Fairmans Lane, Brenchley, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 6 May 2025 at 10:59.

Kent County Council logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
West Street

Kent County Council are proposing to carry out Highway improvement works on West Street, Hunton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kent County Council on 7 May 2025 at 10:26.

Kent County Council logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Folly Hill

Kent County Council are proposing to carry out Highway improvement works on Folly Hill, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 24 Apr 2025 at 07:03.

Kent County Council logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Folly Hill

Kent County Council are proposing to carry out Highway improvement works on Folly Hill, Cranbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 23 Apr 2025 at 06:31.

BT logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Summerhill Road

BT are proposing to carry out Utility asset works on Summerhill Road, Marden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 19 May 2025 at 10:29.

Southern Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Goudhurst Road

Southern Water are proposing to carry out Utility repair and maintenance works on Goudhurst Road, Marden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Southern Water on 22 May 2025 at 10:50.

Kent County Council logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Colts Hill

Kent County Council are proposing to carry out Highway improvement works on Colts Hill, Five Oak Green, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 16 Jan 2025 at 12:14.

Kent County Council logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Colts Hill

Kent County Council are proposing to carry out Highway improvement works on Colts Hill, Five Oak Green, Tonbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 21 Jan 2025 at 08:46.


Roadworks Map near to Churn Lane, TONBRIDGE, TN12 8HN (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 19:37
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Churn Lane, TONBRIDGE, TN12 8HN (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.