ROADWORKS SUMMARY
Ashlea Court, MARKET DRAYTON, TF9 1HZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Ashlea Court, TF9 1HZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ashlea Court, MARKET DRAYTON, TF9 1HZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ashlea Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Staffordshire County Council logo
LONG TERM
Between
19 Feb 2024 and 22 Mar 2025
Details
View Map
Share
Follow
Market Drayton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Market Drayton Road, Bloreheath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 22 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 11 Jan 2024 at 15:57.

Staffordshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Pinfold Lane

Staffordshire County Council are carrying out Highway improvement works on Pinfold Lane, Hales.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 13:18 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 12:50.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Bearstone Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bearstone Road, Knighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Sep 2024 at 11:19.

Shropshire Council logo
Between
1 and 3 Jan 2025
Details
View Map
Share
Follow
Lilac Cottage 30mph Section To Red Lion Wistanswick

Shropshire Council are proposing to carry out Highway improvement works on Lilac Cottage 30mph Section To Red Lion Wistanswick, Wistanswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 3 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Shropshire Council on 24 Sep 2024 at 14:15.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Pinfold Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Pinfold Lane, Hales.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 14:46.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Mucklestone Wood Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mucklestone Wood Lane, Loggerheads.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 14:15.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Badger Brow Road

Staffordshire County Council are proposing to carry out Highway improvement works on Badger Brow Road, Loggerheads.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 14:14.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Queen Margarets Road

Staffordshire County Council are proposing to carry out Highway improvement works on Queen Margarets Road, Loggerheads.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 14:28.

Severn Trent Water logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Lightwood Junction To Haywood Lane Junct

Severn Trent Water are proposing to carry out New service connection on Lightwood Junction To Haywood Lane Junct, Cheswardine.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 15:51.

Shropshire Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Adderley Road

Shropshire Council are proposing to carry out Highway improvement works on Adderley Road, Market Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 23 Sep 2024 at 12:26.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Lightwood Junction To Haywood Lane Junct

Severn Trent Water are proposing to carry out New service connection on Lightwood Junction To Haywood Lane Junct, Cheswardine.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 13:07.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Dutton Close

Cadent Gas are proposing to carry out Utility asset works on Dutton Close, Stoke Heath, Market Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:59.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Buntingsdale Road

Cadent Gas are proposing to carry out Utility asset works on Buntingsdale Road, Market Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:19.

Cadent Gas logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Christ Church Lane

Cadent Gas are proposing to carry out Utility asset works on Christ Church Lane, Market Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:09.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Christ Church Lane

Cadent Gas are proposing to carry out Utility asset works on Christ Church Lane, Market Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:54.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Church Lane, Mucklestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 08:50.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
B5026 From Stafford County Boundary Bearstone Mill To Stafford County Boundary

BT are proposing to carry out Utility asset works on B5026 From Stafford County Boundary Bearstone Mill To Stafford County Boundary, Bearstone, Market Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 8 Nov 2024 at 15:15.

Cadent Gas logo
Between
12 and 26 Feb 2025
Details
View Map
Share
Follow
Buntingsdale Road

Cadent Gas are proposing to carry out Utility asset works on Buntingsdale Road, Market Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 12:45.

Staffordshire County Council logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Pinfold Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Pinfold Lane, Hales.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 12:01.

Shropshire Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Red Bank Road

Shropshire Council are proposing to carry out Highway improvement works on Red Bank Road, Market Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Shropshire Council on 14 Nov 2024 at 13:22.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Mucklestone Wood Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mucklestone Wood Lane, Loggerheads.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 12:14.

Shropshire Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Rosehill Road

Shropshire Council are proposing to carry out Highway improvement works on Rosehill Road, Stoke Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Shropshire Council on 19 Nov 2024 at 14:53.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Badger Brow Road

Staffordshire County Council are proposing to carry out Highway improvement works on Badger Brow Road, Loggerheads.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 12:27.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Queen Margarets Road

Staffordshire County Council are proposing to carry out Highway improvement works on Queen Margarets Road, Loggerheads.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 12:27.

BT logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
New Street Lane

BT are proposing to carry out Utility asset works on New Street Lane, Market Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Dec 2024 at 13:37.

BT logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
New Street Lane

BT are proposing to carry out Utility asset works on New Street Lane, Calverhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Dec 2024 at 13:36.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Pinfold Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Pinfold Lane, Hales.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 10:47.

Staffordshire County Council logo
Between
6 and 28 Mar 2025
Details
View Map
Share
Follow
Newcastle Road

Staffordshire County Council are proposing to carry out Highway improvement works on Newcastle Road, Bloreheath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 13:32.

Staffordshire County Council logo
Between
6 and 28 Mar 2025
Details
View Map
Share
Follow
Newcastle Road

Staffordshire County Council are proposing to carry out Highway improvement works on Newcastle Road, Bloreheath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 11:18.

Cadent Gas logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Balmoral Drive

Cadent Gas are proposing to carry out Utility asset works on Balmoral Drive, Market Drayton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 11:23.

Cadent Gas logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Balmoral Drive

Cadent Gas are proposing to carry out Utility asset works on Balmoral Drive, Market Drayton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 12:12.

Cadent Gas logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Windsor Drive

Cadent Gas are proposing to carry out Utility asset works on Windsor Drive, Market Drayton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 10:30.

Cadent Gas logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Windsor Drive

Cadent Gas are proposing to carry out Utility asset works on Windsor Drive, Market Drayton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 11:34.

Shropshire Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
From Drayton Field To Lostford Junction A53

Shropshire Council are proposing to carry out Highway improvement works on From Drayton Field To Lostford Junction A53, Lostford, Market Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 12 Dec 2024 at 09:00.

Severn Trent Water logo
Between
17 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Wheatsheaf Inn Junction To High Street C

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wheatsheaf Inn Junction To High Street C, Soudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Dec 2024 at 10:33.


Roadworks Map near to Ashlea Court, MARKET DRAYTON, TF9 1HZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 04:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ashlea Court, MARKET DRAYTON, TF9 1HZ (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Severn Trent Water logo
SMITHFIELD ROAD 
(0.5 miles)
Severn Trent Water
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
Cancelled
(Scheduled: 17 Dec 2024 - 20 Dec 2024)
0.5
Details
Share
2
Western Power Distribution (West Midlands) logo
URGENT
  
SMITHFIELD ROAD 
(0.6 miles)
Western Power Distribution (West Midlands)
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
8 Dec 2024 18:00 - 13 Dec 2024 18:20
0.6
Details
Share
3
Cadent Gas logo
URGENT
  
SHROPSHIRE STREET 
(0.7 miles)
Cadent Gas
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
12 Dec 2024 09:46 - 17 Dec 2024 14:08
0.7
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.