ROADWORKS SUMMARY
Hortonwood 50, TELFORD, TF1 7AE
Introduction
View current and future planned roadworks and road closures for Hortonwood 50, TF1 7AE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hortonwood 50, TELFORD, TF1 7AE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hortonwood 50 are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
28 Feb 2025
Telford & Wrekin Council are carrying out Highway improvement works on Lawn Central, Telford Town Centre, Telford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 07:24 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 12 Nov 2024 at 13:47.
13 Dec 2024 and 31 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on New Hall Road, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Oct 2024 at 15:55.
13 Dec 2024 and 31 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Victoria Avenue, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Oct 2024 at 15:55.
2 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Furnace Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:30.
17 Mar 2025
Cadent Gas are carrying out Utility asset works on Hadley Park Road, Hadley, Telford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 January 2025 at 09:00 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 10:07.
Thursday
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Grovefields, Telford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 23 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 1 Oct 2024 at 15:54.
Thursday
Cadent Gas are carrying out Utility asset works on Parkdale, Hadley, Telford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 January 2025 at 08:00 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 14:50.
2 Jan and 13 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Limekiln Lane, Lilleshall, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 16:05.
2 Jan and 13 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Limekiln Lane, Lilleshall, Newport.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 13 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 13:16.
28 Jan 2025
Cadent Gas are carrying out Utility asset works on The Larches, Newport.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 09:00 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 14:58.
2 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Wrekin Avenue, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 15:43.
4 Feb 2025
Cadent Gas are carrying out Utility asset works on Ford Road, Newport.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 11:00 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 11:21.
6 and 31 Jan 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Naird Lane To Shropshire Boundary, Nedge Hill, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 4 Dec 2024 at 10:24.
31 Jan 2025
Telford & Wrekin Council are carrying out Highway improvement works on Naird Lane To Shropshire Boundary, Nedge Hill, Telford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 09:00 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 6 Jan 2025 at 09:58.
Friday
Telford & Wrekin Council are carrying out Highway improvement works on Station Hill, St Georges, Telford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 January 2025 at 08:20 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 7 Jan 2025 at 08:21.
27 Jan 2025
Telford & Wrekin Council are carrying out Highway improvement works on Silkin Way, Telford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 January 2025 at 08:20 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 7 Jan 2025 at 08:21.
6 and 31 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Daisy Bank Drive, Telford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 12 Sep 2024 at 16:51.
6 and 31 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Keepers Crescent, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 12 Sep 2024 at 16:51.
6 and 31 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Keepers Crescent, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 6 Jan 2025 at 12:11.
6 and 31 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Daisy Bank Drive, Telford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 6 Jan 2025 at 15:49.
4 May 2025
Telford & Wrekin Council are carrying out Highway improvement works on Queen Street, Wellington, Telford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:38 and could run through until 4 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 6 Jan 2025 at 08:39.
6 Jan and 30 May 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Church Street, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 16 Oct 2024 at 14:26.
4 May 2025
Telford & Wrekin Council are carrying out Highway improvement works on Church Street, Wellington, Telford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:38 and could run through until 4 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 6 Jan 2025 at 08:39.
6 Jan and 3 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Manse Road, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 13 Sep 2024 at 13:19.
6 Jan and 3 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Mafeking Road, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 13 Sep 2024 at 13:19.
6 Jan and 3 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on High Street, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 13 Sep 2024 at 13:14.
6 Jan and 7 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Leegomery Roundabout To Wheat Leasows, Wheat Leasows, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 23 Sep 2024 at 14:19.
6 Jan and 7 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Wheat Leasows To Horton Junction, Horton, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 23 Sep 2024 at 15:03.
6 Jan and 7 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Horton Junction To Moorhead, Horton, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 23 Sep 2024 at 14:24.
6 Jan and 7 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Station Road, Donnington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 23 Sep 2024 at 14:59.
6 Jan and 7 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Humbers Roundabout To Kynnersley Drive, The Humbers, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 23 Sep 2024 at 14:50.
6 Jan and 7 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Kynnersley Drive, Lilleshall, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 23 Sep 2024 at 14:55.
6 Jan and 7 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Moorhead, Preston Upon The Weald Moors, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 23 Sep 2024 at 14:46.
6 Jan and 7 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Wappenshall Road To Humber Lane, Preston Upon The Weald Moors, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 23 Sep 2024 at 14:46.
6 Jan and 7 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Humber Lane, Donnington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 23 Sep 2024 at 14:50.
Friday
Western Power Distribution (West Midlands) are carrying out Utility asset works on Dale Acre Way, Hollinswood, Telford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 09:15 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 13 Jan 2025 at 10:49.
Saturday
Telford & Wrekin Council are proposing to carry out Highway improvement works on Redhill Way, Donnington Wood, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 24 Oct 2024 at 13:36.
13 Jan and 14 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Brick Kiln Way, Donnington Wood, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Oct 2024 at 15:26.
13 Jan and 14 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on St Matthews Road, Donnington, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Oct 2024 at 15:21.
Friday
Telford & Wrekin Council are carrying out Highway improvement works on Stafford Road, Newport.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 16:03 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 13 Jan 2025 at 16:04.
14 and 31 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Grovefields, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 16:16.
18 Jan 2025 and 19 Jan 2028
Severn Trent Water were proposing to carry out Remedial works on Stafford Road, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 January 2025 and run through until 19 January 2028. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Sep 2024 at 12:48.
20 Jan and 7 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Dawley Road, Lawley, Telford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Telford & Wrekin Council on 22 Oct 2024 at 16:02.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Priorslee Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:30.
20 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Canongate, Oakengates, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:30.
20 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Stafford Street, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:35.
20 Jan and 4 Feb 2025
Exascale are proposing to carry out Utility asset works on Kynnersley To Tibberton Junction, Kynnersley, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Exascale on 16 Jan 2025 at 15:09.
21 Jan and 3 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Furnace Lane, Trench, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Jan 2025 at 16:32.
27 and 29 Jan 2025
BT are proposing to carry out Utility asset works on Garfield Road, Overdale, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 31 Oct 2024 at 10:01.
27 and 29 Jan 2025
BT were proposing to carry out Utility asset works on Riven Road, Hadley, Telford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Oct 2024 at 14:33.
27 Jan and 11 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Shawbirch Road, Admaston, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:10.
27 Jan and 18 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Aldermead Close, Admaston, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:15.
27 Jan and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Boughey Road, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 14:56.
27 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wrekin Avenue, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 10:02.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Hawkstone Avenue, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 15:10.
29 Jan and 4 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Limekiln Lane, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 28 Oct 2024 at 11:57.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Stafford Park 2, Stafford Park, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:04.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Stafford Park 1, Stafford Park, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:04.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hollinswood Interchange, Hollinswood, Telford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:50.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Telford Way, Priorslee, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:50.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Priorslee Roundabout, Priorslee, Telford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:19.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Holyhead Road, Snedshill, Telford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:17.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Snedshill Way, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:21.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Priorslee Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:15.
3 Feb and 6 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Furnace Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:21.
3 and 20 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Furnace Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Jan 2025 at 13:21.
3 and 21 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Canongate, Oakengates, Telford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 24 Oct 2024 at 14:46.
3 Feb and 7 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Church Road, Lilleshall, Newport.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 13:18.
3 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Station Road, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 08:58.
3 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wenlock Drive, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 15:15.
3 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Ellesmere Court, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 15:15.
10 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Eaton Crescent, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:30.
10 and 28 Feb 2025
Telford & Wrekin Council were proposing to carry out Highway improvement works on Stafford Road, Oakengates, Telford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 18 Nov 2024 at 15:17.
10 Feb and 14 Mar 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Stafford Road, Oakengates, Telford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 26 Nov 2024 at 16:02.
10 and 28 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Queen Street, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 4 Dec 2024 at 16:16.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Church Meadow, Lilleshall, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 16:09.
10 and 12 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Wellington Road, Newport.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 10:36.
17 Feb and 7 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Dale Acre Way, Hollinswood, Telford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Dec 2024 at 14:41.
17 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wilkinson Close, Snedshill, Telford.
These works are categorised as Major.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 15:46.
17 Feb and 7 Mar 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Station Hill, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 25 Nov 2024 at 13:12.
17 Feb and 18 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Boughey Road, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 10:02.
17 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ellesmere Court, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 10:07.
18 Feb and 18 Apr 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Priorslee Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Jan 2025 at 13:21.
18 Feb and 7 Mar 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Silkin Way, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 19 Nov 2024 at 11:39.
19 Feb and 25 Mar 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Stafford Road, Oakengates, Telford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 25 Nov 2024 at 13:16.
20 and 26 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Furnace Lane, Trench, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 15:17.
24 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Eaton Crescent, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:30.
24 and 26 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on North Road, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 19 Nov 2024 at 16:30.
24 and 26 Feb 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Spring Hill, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 19 Nov 2024 at 16:30.
24 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wenlock Drive, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 10:02.
24 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Leigh Road, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 15:47.
1 and 3 Mar 2025
BT are proposing to carry out Utility asset works on Ketley Brook Roundabout, Ketley Brook, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 3 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 16 Jan 2025 at 13:42.
3 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Furnace Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 16:25.
3 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Furnace Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 16:29.
3 and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wilkinson Close, Snedshill, Telford.
These works are categorised as Major.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:16.
3 and 14 Mar 2025
Shropshire Council are proposing to carry out Highway improvement works on A5 From Watling Street Wrekin District Council Boundary To Crackley Bank, Redhill, Shifnal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the verge only.
This roadwork event was last updated by Shropshire Council on 2 Dec 2024 at 10:59.
3 and 14 Mar 2025
Shropshire Council are proposing to carry out Highway improvement works on A5 From Watling Street Crackley Bank To Marsh Lane Junction, Crackleybank, Shifnal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the verge only.
This roadwork event was last updated by Shropshire Council on 2 Dec 2024 at 11:01.
3 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Laneside, Muxton, Telford.
These works are categorised as Major.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 15:47.
3 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Muxton Lane, Muxton, Telford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:36.
3 and 17 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Leigh Road, Newport.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 13:53.
5 and 17 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Snedshill Way, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Jan 2025 at 13:21.
10 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hawkstone Avenue, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 10:11.
10 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Highland Road, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 15:19.
10 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Gravelly Drive, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 15:51.
10 and 14 Mar 2025
Severn Trent Water are proposing to carry out Remedial works on Fishers Lock, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 13:08.
12 Mar and 24 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Furnace Lane, Trench, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 24 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 10:25.
17 Mar and 1 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Parkdale, Hadley, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 11:50.
17 Mar and 11 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Muxton Lane, Muxton, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:14.
24 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Priorslee Road, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:24.
24 Mar and 16 May 2025
Cadent Gas are proposing to carry out Utility asset works on Canongate, Oakengates, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:24.
24 Mar and 16 May 2025
Cadent Gas are proposing to carry out Utility asset works on Canongate, Oakengates, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:35.
24 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Stafford Street, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:24.
24 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Stafford Street, St Georges, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:16.
24 Mar and 4 May 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Vineyard Road, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telford & Wrekin Council on 3 Jan 2025 at 10:48.
24 Mar and 23 May 2025
Cadent Gas are proposing to carry out Utility asset works on Waterloo Road, Hadley, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 09:46.
24 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Gladstone Street, Hadley, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 10:27.
24 and 30 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Furnace Lane, Trench, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 10:15.
24 Mar and 18 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Granville Road, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 16:28.
31 Mar and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Ashworth Way, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 16:28.
1 and 30 Apr 2025
Telford & Wrekin Council are proposing to carry out Highway improvement works on Vineyard Road, Wellington, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Telford & Wrekin Council on 5 Dec 2024 at 16:02.
2 and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Wellington Road, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 15:42.
7 and 9 Apr 2025
Cadent Gas are proposing to carry out Remedial works on Main Road, Ketley Bank, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 08:47.
7 and 9 Apr 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Haybridge Avenue, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 14:43.
7 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Pool Meadow, Hadley, Telford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 10:32.
7 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Gravelly Drive, Newport.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 10:58.
9 Apr and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Purbeck Dale Footpath 16, Dawley, Telford.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 14:00.
9 Apr and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Dawley Green Way, Dawley Bank, Telford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 14:00.
9 Apr and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Chiltern Gardens Footpath 5, Dawley, Telford.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 9 April 2025 and could run through until 9 May 2025. The works will impact the footway, verge and footpath.
This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 13:30.
14 and 16 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Pool Hill Road, Horsehay, Telford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 16 Jan 2025 at 10:39.
Roadworks Map near to Hortonwood 50, TELFORD, TF1 7AE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hortonwood 50, TELFORD, TF1 7AE (13 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.