ROADWORKS SUMMARY
Grindle, SHIFNAL, TF11 9JR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for TF11 9JR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Grindle, SHIFNAL, TF11 9JR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Telford & Wrekin Council logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Bath Road

Telford & Wrekin Council are carrying out Highway improvement works on Bath Road, Ironbridge, Telford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 January 2023 at 15:32 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 3 Mar 2025 at 15:57.

Telford & Wrekin Council logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Lawn Central

Telford & Wrekin Council are carrying out Highway improvement works on Lawn Central, Telford Town Centre, Telford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 07:24 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telford & Wrekin Council on 14 Feb 2025 at 15:52.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
3 Feb and 6 Jul 2025
Details
View Map
Share
Follow
Hollinswood Interchange

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hollinswood Interchange, Hollinswood, Telford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:50.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
3 Feb and 6 Jul 2025
Details
View Map
Share
Follow
Stafford Park 1

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Stafford Park 1, Stafford Park, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:04.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
3 Feb and 6 Jul 2025
Details
View Map
Share
Follow
Stafford Park 2

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Stafford Park 2, Stafford Park, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 11:04.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
3 Feb and 6 Jul 2025
Details
View Map
Share
Follow
Telford Way

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Telford Way, Priorslee, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Oct 2024 at 10:50.

Western Power Distribution (West Midlands) logo
Finishing
Friday
Details
View Map
Share
Follow
Dale Acre Way

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Dale Acre Way, Hollinswood, Telford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Dec 2024 at 14:41.

Telford & Wrekin Council logo
Today
Details
View Map
Share
The Lloyds

Telford & Wrekin Council carried out Highway improvement works on The Lloyds, Ironbridge, Telford.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 26 Feb 2025 and 4 Mar 2025 and were actually completed between 26 Feb 2025 (16:54) and 4 Mar 2025 (14:57). The works impacted the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 4 Mar 2025 at 15:01.

Telford & Wrekin Council logo
Today
Details
View Map
Share
Queensway Dual Carriage Brookside To Trench Lock

Telford & Wrekin Council carried out Highway improvement works on Queensway Dual Carriage Brookside To Trench Lock, Telford.

The road was closed for some or all of the period.

The works were originally planned between 3 Mar 2025 and 4 Mar 2025 and were actually completed between 3 Mar 2025 (19:00) and 4 Mar 2025 (05:00). The works impacted the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 4 Mar 2025 at 09:01.

Shropshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cordy Lane

Shropshire Council are carrying out Highway improvement works on Cordy Lane, Albrighton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:49 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Shropshire Council on 3 Mar 2025 at 09:00.

Shropshire Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
A5 From Watling Street Crackley Bank To Marsh Lane Junction

Shropshire Council are proposing to carry out Highway improvement works on A5 From Watling Street Crackley Bank To Marsh Lane Junction, Crackleybank, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the verge only.

This roadwork event was last updated by Shropshire Council on 2 Dec 2024 at 11:01.

Shropshire Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
A5 From Marsh Lane Junction To Burlaughton Farm Junction

Shropshire Council are proposing to carry out Highway improvement works on A5 From Marsh Lane Junction To Burlaughton Farm Junction, Burlington, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the verge only.

This roadwork event was last updated by Shropshire Council on 2 Dec 2024 at 11:02.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
The Wyke Junction A4169 To Shaw Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on The Wyke Junction A4169 To Shaw Lane, Shifnal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 6 March 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 08:25.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Hall Lane

Severn Trent Water are carrying out New service connection on Hall Lane, Shifnal.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2025 at 09:00 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Mar 2025 at 09:00.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Hall Lane

Severn Trent Water are proposing to carry out New service connection on Hall Lane, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 14:56.

Cadent Gas logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Hodge Bower

Cadent Gas are proposing to carry out New service connection on Hodge Bower, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 10:51.

Cadent Gas logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Hodge Bower

Cadent Gas are proposing to carry out New service connection on Hodge Bower, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 14:31.

Telford & Wrekin Council logo
LONG TERM
Between
17 Mar and 18 Apr 2025
Details
View Map
Share
Follow
St Lukes Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on St Lukes Road, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Telford & Wrekin Council on 4 Mar 2025 at 15:28.

Telford & Wrekin Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Halesfield 1

Telford & Wrekin Council are proposing to carry out Highway improvement works on Halesfield 1, Halesfield, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 27 Feb 2025 at 13:15.

Shropshire Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Cordy Lane

Shropshire Council are proposing to carry out Highway improvement works on Cordy Lane, Albrighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Shropshire Council on 19 Dec 2024 at 16:10.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Snowdon Road

Staffordshire County Council are proposing to carry out Highway improvement works on Snowdon Road, Burnhill Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 12:26.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
17 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Stafford Park 1

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Stafford Park 1, Stafford Park, Telford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 13 Feb 2025 at 15:47.

Telford & Wrekin Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Coalport Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on Coalport Road, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 26 Feb 2025 at 08:41.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
17 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Stafford Park 1

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Stafford Park 1, Stafford Park, Telford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Feb 2025 at 14:40.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
17 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Stafford Park 1

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Stafford Park 1, Stafford Park, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 Jan 2025 at 16:22.

Telford & Wrekin Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Mound Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Mound Way, Woodside, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 27 Feb 2025 at 13:06.

Cadent Gas logo
LONG TERM
Between
24 Mar and 29 Apr 2025
Details
View Map
Share
Follow
Halesfield 6

Cadent Gas are proposing to carry out Utility asset works on Halesfield 6, Halesfield, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 15:15.

Cadent Gas logo
LONG TERM
Between
24 Mar and 29 Apr 2025
Details
View Map
Share
Follow
Halesfield 6

Cadent Gas are proposing to carry out New service connection on Halesfield 6, Halesfield, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 14:32.

Staffordshire County Council logo
Between
7 and 22 Apr 2025
Details
View Map
Share
Follow
County Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on County Lane, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 15:45.

Shropshire Council logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Aston Street

Shropshire Council are proposing to carry out Highway improvement works on Aston Street, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 6 Jan 2025 at 10:37.

Severn Trent Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Folley Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Folley Road, Ackleton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 9 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Feb 2025 at 10:16.

Telford & Wrekin Council logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Mill Farm Drive

Telford & Wrekin Council are proposing to carry out Highway improvement works on Mill Farm Drive, Randlay, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 14 Feb 2025 at 10:22.

Severn Trent Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Folley Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Folley Road, Ackleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 15:47.

Severn Trent Water logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Waterloo Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Waterloo Street, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Feb 2025 at 11:28.

Cadent Gas logo
Between
21 Apr and 12 May 2025
Details
View Map
Share
Follow
Derwent Drive

Cadent Gas are proposing to carry out Utility asset works on Derwent Drive, Priorslee, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 15:21.

BT logo
Between
21 and 24 Apr 2025
Details
View Map
Share
Follow
Briarwood

BT are proposing to carry out Utility repair and maintenance works on Briarwood, Brookside, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jan 2025 at 13:40.

BT logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Briarwood

BT are proposing to carry out Utility repair and maintenance works on Briarwood, Brookside, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Feb 2025 at 14:18.

Cadent Gas logo
LONG TERM
Between
29 Apr and 4 Jun 2025
Details
View Map
Share
Follow
Halesfield 6

Cadent Gas are proposing to carry out New service connection on Halesfield 6, Halesfield, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 15:12.

Staffordshire County Council logo
Between
1 and 15 May 2025
Details
View Map
Share
Follow
County Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on County Lane, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Feb 2025 at 10:16.

BT logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
Briarwood

BT are proposing to carry out Utility repair and maintenance works on Briarwood, Brookside, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Feb 2025 at 16:04.

Shropshire Council logo
Between
6 and 8 May 2025
Details
View Map
Share
Follow
Priorslee Road

Shropshire Council are proposing to carry out Highway repair and maintenance works on Priorslee Road, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 11 Feb 2025 at 14:25.

Telford & Wrekin Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Mill Farm Drive

Telford & Wrekin Council are proposing to carry out Highway improvement works on Mill Farm Drive, Randlay, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 13 Feb 2025 at 13:45.

Severn Trent Water logo
Between
12 and 14 May 2025
Details
View Map
Share
Folley Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Folley Road, Ackleton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 14 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Feb 2025 at 09:35.

Telford & Wrekin Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Mound Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Mound Way, Woodside, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 24 Feb 2025 at 15:02.

Telford & Wrekin Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Mound Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Mound Way, Woodside, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 12 Feb 2025 at 14:16.

Cadent Gas logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Coniston Drive

Cadent Gas are proposing to carry out Utility asset works on Coniston Drive, Priorslee, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 15:21.

Telford & Wrekin Council logo
LONG TERM
Between
12 May and 13 Jun 2025
Details
View Map
Share
Follow
St Lukes Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on St Lukes Road, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Telford & Wrekin Council on 25 Feb 2025 at 13:42.

Telford & Wrekin Council logo
Between
12 and 21 May 2025
Details
View Map
Share
Follow
The Lloyds

Telford & Wrekin Council are proposing to carry out Highway improvement works on The Lloyds, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 11 Feb 2025 at 12:17.

Telford & Wrekin Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
Coalport Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on Coalport Road, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 24 Feb 2025 at 15:11.

BT logo
Between
13 and 16 May 2025
Details
View Map
Share
Follow
Link From Opposite Hall Eastwards

BT are proposing to carry out Utility asset works on Link From Opposite Hall Eastwards, Wyken, Worfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 18 Feb 2025 at 14:56.

BT logo
Between
13 and 16 May 2025
Details
View Map
Share
Follow
Wyken Junction To Staffordshire County Boundary Pillar Box Cottage

BT are proposing to carry out Utility asset works on Wyken Junction To Staffordshire County Boundary Pillar Box Cottage, Worfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 18 Feb 2025 at 14:55.

Severn Trent Water logo
Between
13 and 15 May 2025
Details
View Map
Share
Follow
Folley Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Folley Road, Ackleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Feb 2025 at 14:22.

BT logo
Between
13 and 16 May 2025
Details
View Map
Share
Follow
Wyken A454 Junction Worfield To Park View

BT are proposing to carry out Utility asset works on Wyken A454 Junction Worfield To Park View, Worfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 18 Feb 2025 at 14:58.

Telford & Wrekin Council logo
Between
14 and 27 May 2025
Details
View Map
Share
Follow
Halesfield 1

Telford & Wrekin Council are proposing to carry out Highway improvement works on Halesfield 1, Halesfield, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2025 and could run through until 27 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 24 Feb 2025 at 16:47.

Cadent Gas logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Coniston Drive

Cadent Gas are proposing to carry out Utility asset works on Coniston Drive, Priorslee, Telford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 11:00.

Cadent Gas logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Coniston Drive

Cadent Gas were proposing to carry out Utility asset works on Coniston Drive, Priorslee, Telford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 13:38.

Severn Trent Water logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Springhill Crescent

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Springhill Crescent, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Feb 2025 at 10:24.

Telford & Wrekin Council logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Follow
Coalport Road

Telford & Wrekin Council are proposing to carry out Highway improvement works on Coalport Road, Ironbridge, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 24 Feb 2025 at 15:20.

Telford & Wrekin Council logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Follow
Mound Way

Telford & Wrekin Council are proposing to carry out Highway improvement works on Mound Way, Woodside, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 24 Feb 2025 at 15:06.

Telford & Wrekin Council logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Follow
Mill Farm Drive

Telford & Wrekin Council are proposing to carry out Highway improvement works on Mill Farm Drive, Randlay, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Telford & Wrekin Council on 13 Feb 2025 at 14:03.


Roadworks Map near to Grindle, SHIFNAL, TF11 9JR (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 4 Mar 2025 23:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Grindle, SHIFNAL, TF11 9JR (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.