ROADWORKS SUMMARY
Dingle Drive, SHIFNAL, TF11 9DW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Dingle Drive, TF11 9DW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Dingle Drive, SHIFNAL, TF11 9DW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Dingle Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Finishing
Thursday
Details
View Map
Share
Newport Road

Interoute (Formerly I-21 Holdings) were proposing to carry out Utility repair and maintenance works on Newport Road, Albrighton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2026 and run through until 24 September 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Interoute (Formerly I-21 Holdings) on 27 Aug 2026 at 08:46.

LONG TERM
Finishing
Thursday
Details
View Map
Share
High Street

Interoute (Formerly I-21 Holdings) were proposing to carry out Utility repair and maintenance works on High Street, Albrighton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2026 and run through until 24 September 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Interoute (Formerly I-21 Holdings) on 27 Aug 2026 at 08:46.

Staffordshire County Council logo
Between
1 and 25 Sep 2026
Details
View Map
Share
Follow
Clive Road

Staffordshire County Council are proposing to carry out Highway improvement works on Clive Road, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Jun 2026 at 17:50.

Staffordshire County Council logo
Between
1 and 25 Sep 2026
Details
View Map
Share
Follow
Clive Road

Staffordshire County Council are proposing to carry out Highway improvement works on Clive Road, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Sep 2026 at 15:18.

Cadent Gas logo
Between
7 and 29 Sep 2026
Details
View Map
Share
Kingswood Road

Cadent Gas were proposing to carry out Utility asset works on Kingswood Road, Albrighton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 29 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 13:24.

Severn Trent Water logo
Finishing
Monday
Details
View Map
Share
Follow
Chapel Road

Severn Trent Water are carrying out Utility repair and maintenance works on Chapel Road, Telford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 13:29 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Sep 2026 at 10:59.

Shropshire Council logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Worcester Road West

Shropshire Council are proposing to carry out Highway improvement works on Worcester Road West, Cosford, Albrighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 15 Sep 2026 at 10:22.

Shropshire Council logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Worcester Road

Shropshire Council are proposing to carry out Highway improvement works on Worcester Road, Cosford, Albrighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 15 Sep 2026 at 10:22.

Severn Trent Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Lloyds Head

Severn Trent Water are proposing to carry out Utility asset works on Lloyds Head, Jackfield, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 6 Aug 2026 at 10:39.

Severn Trent Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Chapel Road

Severn Trent Water are proposing to carry out Utility asset works on Chapel Road, Jackfield, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 6 Aug 2026 at 10:39.

Shropshire Council logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Neachley Lane

Shropshire Council are proposing to carry out Highway improvement works on Neachley Lane, Neachley, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 15 Sep 2026 at 10:22.

Western Power Distribution (West Midlands) logo
Between
29 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Badger Lane End Of To Staffordshire County Boundary Badgerheath Farm

Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Badger Lane End Of To Staffordshire County Boundary Badgerheath Farm, Badger, Bridgnorth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Aug 2026 at 09:19.

Shropshire Council logo
Between
30 Sep and 7 Oct 2026
Details
View Map
Share
Follow
Coalport Road End Of To Brockton Junction A442

Shropshire Council are proposing to carry out Highway improvement works on Coalport Road End Of To Brockton Junction A442, Brockton, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 7 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 15 Sep 2026 at 10:24.

Shropshire Council logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Woodhouse Lane

Shropshire Council are proposing to carry out Highway improvement works on Woodhouse Lane, Albrighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 18 Sep 2026 at 08:00.

Severn Trent Water logo
LONG TERM
Between
26 Oct 2026 and 8 Mar 2027
Details
View Map
Share
Follow
A454 From Rudge Heath Road Junction To Shipley Two Junction With B4176

Severn Trent Water are proposing to carry out Utility asset works on A454 From Rudge Heath Road Junction To Shipley Two Junction With B4176, Rudge Heath, Pattingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 8 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2026 at 09:58.

Severn Trent Water logo
LONG TERM
Between
26 Oct 2026 and 8 Mar 2027
Details
View Map
Share
Follow
Shipley Two Junctions With A454 To B4176 And Old B4176

Severn Trent Water are proposing to carry out Utility asset works on Shipley Two Junctions With A454 To B4176 And Old B4176, Upper Ludstone, Claverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 8 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2026 at 09:25.

Severn Trent Water logo
LONG TERM
Between
26 Oct 2026 and 8 Mar 2027
Details
View Map
Share
Follow
Shipley Junction With A454 To Rudge Road

Severn Trent Water are proposing to carry out Utility asset works on Shipley Junction With A454 To Rudge Road, Lower Rudge, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 8 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2026 at 09:26.

Severn Trent Water logo
LONG TERM
Between
26 Oct 2026 and 8 Mar 2027
Details
View Map
Share
Follow
A454 From Shipley Two Junctions With B4176 To Shipley

Severn Trent Water are proposing to carry out Utility asset works on A454 From Shipley Two Junctions With B4176 To Shipley, Shipley, Claverley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 8 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2026 at 09:46.

Severn Trent Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Hall Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hall Lane, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Aug 2026 at 11:05.

Shropshire Council logo
Between
4 and 11 Nov 2026
Details
View Map
Share
Follow
Coalport Road End Of To Brockton Junction A442

Shropshire Council are proposing to carry out Highway improvement works on Coalport Road End Of To Brockton Junction A442, Brockton, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 11 Aug 2026 at 15:08.

Severn Trent Water logo
LONG TERM
Between
9 Nov 2026 and 22 Mar 2027
Details
View Map
Share
Follow
Shipley Two Junctions With A454 To B4176 And Old B4176

Severn Trent Water are proposing to carry out Utility asset works on Shipley Two Junctions With A454 To B4176 And Old B4176, Upper Ludstone, Claverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 22 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 15:22.

Severn Trent Water logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Hall Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hall Lane, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Aug 2026 at 10:56.

Severn Trent Water logo
LONG TERM
Between
9 Nov 2026 and 22 Mar 2027
Details
View Map
Share
Follow
Shipley Junction With A454 To Rudge Road

Severn Trent Water are proposing to carry out Utility asset works on Shipley Junction With A454 To Rudge Road, Lower Rudge, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 22 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 15:52.

Severn Trent Water logo
LONG TERM
Between
9 Nov 2026 and 22 Mar 2027
Details
View Map
Share
Follow
A454 From Shipley Two Junctions With B4176 To Shipley

Severn Trent Water are proposing to carry out Utility asset works on A454 From Shipley Two Junctions With B4176 To Shipley, Shipley, Claverley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 22 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 14:49.

Severn Trent Water logo
LONG TERM
Between
9 Nov 2026 and 22 Mar 2027
Details
View Map
Share
Follow
A454 From Rudge Heath Road Junction To Shipley Two Junction With B4176

Severn Trent Water are proposing to carry out Utility asset works on A454 From Rudge Heath Road Junction To Shipley Two Junction With B4176, Rudge Heath, Pattingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 22 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 14:56.

Severn Trent Water logo
LONG TERM
Between
9 Nov 2026 and 22 Mar 2027
Details
View Map
Share
Follow
Upper Ludstone To Junction North East Of B4176

Severn Trent Water are proposing to carry out Utility asset works on Upper Ludstone To Junction North East Of B4176, Upper Ludstone, Claverley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 22 March 2027. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 15:12.

Severn Trent Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Shipley Junction With A454 To Rudge Road

Severn Trent Water were proposing to carry out New service connection on Shipley Junction With A454 To Rudge Road, Pattingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2026 and run through until 13 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Sep 2026 at 11:28.

Severn Trent Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Follow
Shipley Junction With A454 To Rudge Road

Severn Trent Water are proposing to carry out New service connection on Shipley Junction With A454 To Rudge Road, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Sep 2026 at 13:20.

Shropshire Council logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Woodhouse Lane

Shropshire Council are proposing to carry out Highway improvement works on Woodhouse Lane, Albrighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 7 Sep 2026 at 16:23.

Shropshire Council logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
A4169 From Kemberton Road End B4379 Junction To Start Of Bridgnorth Road Shifnal

Shropshire Council are proposing to carry out Highway improvement works on A4169 From Kemberton Road End B4379 Junction To Start Of Bridgnorth Road Shifnal, Kemberton, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 19 Aug 2026 at 19:23.

Shropshire Council logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Bridgnorth Road

Shropshire Council are proposing to carry out Highway improvement works on Bridgnorth Road, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 19 Aug 2026 at 19:24.

Shropshire Council logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Vicarage Drive

Shropshire Council are proposing to carry out Highway improvement works on Vicarage Drive, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 19 Aug 2026 at 19:23.

Shropshire Council logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Church Street

Shropshire Council are proposing to carry out Highway improvement works on Church Street, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 19 Aug 2026 at 19:24.

Shropshire Council logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Innage Road

Shropshire Council are proposing to carry out Highway improvement works on Innage Road, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 19 Aug 2026 at 19:22.

BT logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
Field Lane

BT are proposing to carry out Utility asset works on Field Lane, Kemberton, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 10 Sep 2026 at 15:09.

BT logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
Field Lane

BT are proposing to carry out Utility asset works on Field Lane, Kemberton, Shifnal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Sep 2026 at 11:55.

Western Power Distribution (West Midlands) logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Stableford Junction With B4176 To Badger Lane End Of

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Stableford Junction With B4176 To Badger Lane End Of, Stableford, Bridgnorth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Sep 2026 at 14:46.

Western Power Distribution (West Midlands) logo
Between
16 and 22 Dec 2026
Details
View Map
Share
Follow
Park Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Park Lane, Woodside, Telford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Sep 2026 at 12:00.


Roadworks Map near to Dingle Drive, SHIFNAL, TF11 9DW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Sep 2026 23:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Dingle Drive, SHIFNAL, TF11 9DW (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.