ROADWORKS SUMMARY
Ashill, ILMINSTER, TA19 9NB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for TA19 9NB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ashill, ILMINSTER, TA19 9NB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Somerset County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Bradon Lane

Somerset County Council are carrying out Highway repair and maintenance works on Bradon Lane, Puckington, Ilminster.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 May 2024 at 11:06 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 21 May 2024 at 07:51.

Somerset County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Harveys Lane

Somerset County Council are carrying out Highway repair and maintenance works on Harveys Lane, Buckland St Mary, Chard.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 10:59 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 20 May 2024 at 11:11.

Somerset County Council logo
LONG TERM
Between
1 Jul and 20 Dec 2024
Details
View Map
Share
Chaffcombe Road

Somerset County Council were proposing to carry out Remedial works on Chaffcombe Road, Chard.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Somerset County Council on 17 Oct 2024 at 10:47.

Somerset County Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Bradon Lane

Somerset County Council are carrying out Highway repair and maintenance works on Bradon Lane, Puckington, Ilminster.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 16:30 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 4 Nov 2024 at 08:35.

Wessex Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Footway Between Brewery Lane And Lower Meadow

Wessex Water are proposing to carry out Utility repair and maintenance works on Footway Between Brewery Lane And Lower Meadow, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the footpath only.

This roadwork event was last updated by Wessex Water on 12 Nov 2024 at 09:27.

Lumen Technologies logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bickenhall Road

Lumen Technologies are carrying out Remedial works on Bickenhall Road, Bickenhall, Taunton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 10:25 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 19 Nov 2024 at 10:57.

Wales And West Utilities logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Furzehill

Wales And West Utilities are carrying out Utility repair and maintenance works on Furzehill, Chard.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 18 Nov 2024 at 09:12.

Somerset County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hornsey Lane

Somerset County Council are proposing to carry out Highway repair and maintenance works on Hornsey Lane, Buckland St Mary, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 15 Oct 2024 at 11:19.

Somerset County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hornsey Lane

Somerset County Council are proposing to carry out Highway repair and maintenance works on Hornsey Lane, Buckland St Mary, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 5 Nov 2024 at 08:48.

Western Power Distribution (South West) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Main Street

Western Power Distribution (South West) are carrying out Utility asset works on Main Street, Dowlish Wake, Ilminster.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 09:30 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Nov 2024 at 10:22.

Western Power Distribution (South West) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Main Street

Western Power Distribution (South West) are proposing to carry out Utility asset works on Main Street, Dowlish Wake, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 23 Aug 2024 at 09:00.

Somerset County Council logo
Between
25 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Birchwood Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Birchwood Road, Buckland St Mary, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 11 Oct 2024 at 15:28.

Somerset County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Birchwood Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Birchwood Road, Buckland St Mary, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 11 Oct 2024 at 15:34.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Greenway Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Greenway Lane, Henlade, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 6 Sep 2024 at 11:43.

Wessex Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Greenway Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Greenway Lane, Henlade, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 21 Nov 2024 at 09:27.

Somerset County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Birchwood Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Birchwood Road, Buckland St Mary, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 11 Nov 2024 at 11:33.

Somerset County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Birchwood Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Birchwood Road, Buckland St Mary, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 11 Nov 2024 at 11:33.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Blackdown View

Wessex Water are proposing to carry out Utility repair and maintenance works on Blackdown View, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 18 Nov 2024 at 16:46.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Blackdown View

Wessex Water are proposing to carry out Utility repair and maintenance works on Blackdown View, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 19 Nov 2024 at 16:04.

Somerset County Council logo
Between
30 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Hanning Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Hanning Road, Horton, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 7 Nov 2024 at 10:34.

Somerset County Council logo
Between
30 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Broadway Hill

Somerset County Council are proposing to carry out Highway repair and maintenance works on Broadway Hill, Horton, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 7 Nov 2024 at 10:35.

Somerset County Council logo
Between
30 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Old A303

Somerset County Council are proposing to carry out Highway repair and maintenance works on Old A303, Horton, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 7 Nov 2024 at 10:35.

Somerset County Council logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Old A303

Somerset County Council were proposing to carry out Highway repair and maintenance works on Old A303, Horton, Ilminster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 31 Oct 2024 at 13:53.

Wessex Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Summerlands Park Drive

Wessex Water are proposing to carry out Utility repair and maintenance works on Summerlands Park Drive, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 2 Sep 2024 at 09:45.

Wessex Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Summerlands Park Drive

Wessex Water are proposing to carry out Utility repair and maintenance works on Summerlands Park Drive, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 2 Sep 2024 at 10:50.

Somerset County Council logo
Between
3 and 10 Dec 2024
Details
View Map
Share
Follow
Riec-sur-belon Way

Somerset County Council are proposing to carry out Highway repair and maintenance works on Riec-sur-belon Way, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 4 Sep 2024 at 12:42.

Somerset County Council logo
Between
3 and 10 Dec 2024
Details
View Map
Share
Follow
Riec-sur-belon Way

Somerset County Council are proposing to carry out Highway repair and maintenance works on Riec-sur-belon Way, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 18 Nov 2024 at 10:43.

Somerset County Council logo
Between
3 and 10 Dec 2024
Details
View Map
Share
Follow
Station Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Station Road, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Somerset County Council on 4 Sep 2024 at 12:42.

Somerset County Council logo
Between
3 and 10 Dec 2024
Details
View Map
Share
Follow
Station Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Station Road, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Somerset County Council on 18 Nov 2024 at 10:43.

Western Power Distribution (South West) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hare Lane

Western Power Distribution (South West) are proposing to carry out Utility asset works on Hare Lane, Broadway, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 27 Aug 2024 at 09:07.

Somerset County Council logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Greenway Lane

Somerset County Council are proposing to carry out Section 50 on Greenway Lane, Lower Henlade, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 7 Nov 2024 at 09:32.

Somerset County Council logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Greenway Lane

Somerset County Council are proposing to carry out Section 50 on Greenway Lane, Lower Henlade, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 8 Nov 2024 at 15:58.

Western Power Distribution (South West) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hare Lane

Western Power Distribution (South West) are proposing to carry out Utility asset works on Hare Lane, Broadway, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 30 Aug 2024 at 14:21.

BT logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Road Road

BT are proposing to carry out Utility asset works on Road Road, Buckland St Mary, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Sep 2024 at 11:32.

BT logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Little Hill

BT are proposing to carry out Utility asset works on Little Hill, Buckland St Mary, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Sep 2024 at 11:25.

Wessex Internet logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Islemoor Lane

Wessex Internet are proposing to carry out Utility asset works on Islemoor Lane, Fivehead, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 22 Nov 2024 at 15:59.

Wessex Internet logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Isle Abbotts Road

Wessex Internet are proposing to carry out Utility asset works on Isle Abbotts Road, Fivehead, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 22 Nov 2024 at 15:59.

Wessex Water logo
Between
7 and 31 Jan 2025
Details
View Map
Share
Follow
Victoria Avenue

Wessex Water are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 14 Jun 2024 at 13:38.

Somerset County Council logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Stibbear Lane

Somerset County Council are proposing to carry out Highway repair and maintenance works on Stibbear Lane, Donyatt, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 20 Nov 2024 at 01:38.

Wessex Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hare Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Hare Lane, Broadway, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 8 Nov 2024 at 08:30.

Wessex Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hare Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Hare Lane, Broadway, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 15 Nov 2024 at 08:22.

Somerset County Council logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Stibbear Lane

Somerset County Council are proposing to carry out Highway repair and maintenance works on Stibbear Lane, Donyatt, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 19 Nov 2024 at 15:21.

Wessex Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Higher Beetham

Wessex Water are proposing to carry out Utility repair and maintenance works on Higher Beetham, Whitestaunton, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 5 Nov 2024 at 12:58.

Wessex Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Higher Beetham

Wessex Water are proposing to carry out Utility repair and maintenance works on Higher Beetham, Whitestaunton, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 11 Nov 2024 at 11:51.

Wessex Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Shelway Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Shelway Lane, Barrington, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the verge only.

This roadwork event was last updated by Wessex Water on 7 Nov 2024 at 08:29.

Wessex Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Shelway Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Shelway Lane, Barrington, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the verge only.

This roadwork event was last updated by Wessex Water on 13 Nov 2024 at 13:56.

Wessex Internet logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Capland Lane

Wessex Internet are proposing to carry out Utility asset works on Capland Lane, Hatch Beauchamp, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 13 Nov 2024 at 09:16.

Wessex Internet logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Capland Lane

Wessex Internet are proposing to carry out Utility asset works on Capland Lane, Ashill, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 11 Nov 2024 at 09:40.

Wessex Internet logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Capland Lane

Wessex Internet are proposing to carry out Utility asset works on Capland Lane, Hatch Beauchamp, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 7 Nov 2024 at 10:40.

Somerset County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Main Street

Somerset County Council are proposing to carry out Highway repair and maintenance works on Main Street, Ilton, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 18 Nov 2024 at 13:14.

Somerset County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Church Road, Ilton, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 18 Nov 2024 at 13:08.

BT logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Rock Hill

BT are proposing to carry out Utility asset works on Rock Hill, North Curry, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 15 Oct 2024 at 09:03.

Wessex Internet logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Village Road

Wessex Internet are proposing to carry out Utility asset works on Village Road, Hatch Beauchamp, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wessex Internet on 7 Nov 2024 at 10:40.

Wessex Internet logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Village Road

Wessex Internet are proposing to carry out Utility asset works on Village Road, Hatch Beauchamp, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wessex Internet on 13 Nov 2024 at 09:16.

Wessex Internet logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Wessex Internet are proposing to carry out Utility asset works on Mill Lane, Hatch Beauchamp, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 7 Nov 2024 at 10:40.

Wessex Internet logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Wessex Internet are proposing to carry out Utility asset works on Mill Lane, Hatch Beauchamp, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 13 Nov 2024 at 09:16.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Rock Hill

BT are proposing to carry out Utility asset works on Rock Hill, North Curry, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Nov 2024 at 15:51.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Rock Hill

BT are proposing to carry out Utility asset works on Rock Hill, North Curry, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 7 Nov 2024 at 11:20.

Wessex Water logo
Between
31 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Footway Between Brewery Lane And Lower Meadow

Wessex Water are proposing to carry out Utility repair and maintenance works on Footway Between Brewery Lane And Lower Meadow, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 19 February 2025. The works will impact the footpath only.

This roadwork event was last updated by Wessex Water on 11 Nov 2024 at 10:34.

Wessex Internet logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Windmill Hill Lane

Wessex Internet are proposing to carry out Utility asset works on Windmill Hill Lane, Ashill, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 22 Nov 2024 at 16:37.

Wessex Internet logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Forwards Lane

Wessex Internet are proposing to carry out Utility asset works on Forwards Lane, Ashill, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 22 Nov 2024 at 16:48.

Wessex Internet logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Thickthorn Lane

Wessex Internet are proposing to carry out Utility asset works on Thickthorn Lane, Ashill, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 22 Nov 2024 at 16:53.

Wessex Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Stoopers Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Stoopers Hill, Combe St Nicholas, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 30 Oct 2024 at 10:16.

Wessex Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Station Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Station Road, Hatch Beauchamp, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 11 Nov 2024 at 16:28.

Wessex Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Underway

Wessex Water are proposing to carry out Utility repair and maintenance works on Underway, Combe St Nicholas, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 4 Nov 2024 at 11:32.

Wessex Water logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
Radigan Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Radigan Lane, Ashill, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 11 Nov 2024 at 12:16.

Western Power Distribution (South West) logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Ham Farm Lane

Western Power Distribution (South West) are proposing to carry out New service connection on Ham Farm Lane, Combe St Nicholas, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Nov 2024 at 16:10.

Wessex Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ilford Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Ilford Lane, Ilton, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by Wessex Water on 13 Nov 2024 at 12:25.

Wessex Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Blindmoor Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Blindmoor Lane, Buckland St Mary, Chard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Nov 2024 at 09:25.

Wessex Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Station Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Station Road, Hatch Beauchamp, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Nov 2024 at 15:40.


Roadworks Map near to Ashill, ILMINSTER, TA19 9NB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 17:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ashill, ILMINSTER, TA19 9NB (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wessex Water logo
BROADWAY ROAD, BROADWAY 
(1.0 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
1.0
Details
Share
Follow