ROADWORKS SUMMARY
Shepton Beauchamp, ILMINSTER, TA19 0LD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for TA19 0LD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Shepton Beauchamp, ILMINSTER, TA19 0LD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

The Environment Agency logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Midelney Road

The Environment Agency are carrying out Utility repair and maintenance works on Midelney Road, Drayton, Langport.

These works are categorised as Major.

The works started on 22 May 2023 at 08:00 and could run through until 28 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by The Environment Agency on 21 Aug 2023 at 13:23.

Somerset County Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Bradon Lane

Somerset County Council are carrying out Highway repair and maintenance works on Bradon Lane, Puckington, Ilminster.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 May 2024 at 12:06 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 1 Apr 2025 at 09:24.

Somerset County Council logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Stoney Lane

Somerset County Council are carrying out Highway repair and maintenance works on Stoney Lane, Stocklinch, Ilminster.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 14:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 28 Apr 2025 at 08:39.

Western Power Distribution (South West) logo
Finishing
Today
Details
View Map
Share
Compton Road

Western Power Distribution (South West) were proposing to carry out Utility repair and maintenance works on Compton Road, South Petherton.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 29 May 2025 at 09:32.

Somerset County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Ham Hill Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Ham Hill Road, Norton Sub Hamdon, Stoke Sub Hamdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 25 Feb 2025 at 12:21.

Western Power Distribution (South West) logo
Finishing
Today
Details
View Map
Share
Follow
Compton Hill

Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Compton Hill, South Petherton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 15:00 and could run through until 3 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 29 May 2025 at 14:04.

Wessex Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Stoney Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Stoney Lane, Stocklinch, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 25 Apr 2025 at 12:22.

Wessex Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Stoney Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Stoney Lane, Stocklinch, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 16 May 2025 at 08:26.

Wessex Internet logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Stocklinch Lane South

Wessex Internet are proposing to carry out Utility asset works on Stocklinch Lane South, Stocklinch, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 3 Apr 2025 at 15:53.

Wessex Internet logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Owl Street

Wessex Internet are proposing to carry out Utility asset works on Owl Street, Stocklinch, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 3 Apr 2025 at 15:59.

Western Power Distribution (South West) logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Silver Street

Western Power Distribution (South West) are proposing to carry out Utility repair and maintenance works on Silver Street, East Lambrook, South Petherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Apr 2025 at 15:17.

Western Power Distribution (South West) logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Silver Street

Western Power Distribution (South West) are proposing to carry out Utility repair and maintenance works on Silver Street, East Lambrook, South Petherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 17 Apr 2025 at 11:42.

Wessex Internet logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Creedy Bridge Road

Wessex Internet are proposing to carry out Utility asset works on Creedy Bridge Road, South Petherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wessex Internet on 9 May 2025 at 08:44.

Wessex Internet logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Lower Stratton

Wessex Internet are proposing to carry out Utility asset works on Lower Stratton, Wigborough, South Petherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wessex Internet on 9 May 2025 at 08:44.

Wessex Internet logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Yeabridge Lane

Wessex Internet are proposing to carry out Utility asset works on Yeabridge Lane, Yeabridge, South Petherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 9 May 2025 at 08:44.

Somerset County Council logo
Between
25 and 29 Jun 2025
Details
View Map
Share
Fosse Way

Somerset County Council were proposing to carry out Highway repair and maintenance works on Fosse Way, Hinton St George.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 June 2025 and run through until 29 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 4 Apr 2025 at 12:08.

Somerset County Council logo
Between
25 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Frogmary Street

Somerset County Council are proposing to carry out Section 50 on Frogmary Street, South Petherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 20 May 2025 at 15:53.

Somerset County Council logo
Between
25 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Frogmary Street

Somerset County Council are proposing to carry out Section 50 on Frogmary Street, South Petherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 20 May 2025 at 15:53.

Somerset County Council logo
Between
25 and 28 Jun 2025
Details
View Map
Share
Follow
Steamalong

Somerset County Council are proposing to carry out Highway repair and maintenance works on Steamalong, Isle Abbotts, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 27 May 2025 at 10:31.

Wessex Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Greenway

Wessex Water are proposing to carry out Utility repair and maintenance works on Greenway, Dowlish Ford, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 26 Mar 2025 at 16:20.

Somerset County Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Stibbear Lane

Somerset County Council are proposing to carry out Highway repair and maintenance works on Stibbear Lane, Donyatt, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 2 Jun 2025 at 11:52.

Wessex Internet logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Littlefields Lane

Wessex Internet are proposing to carry out Utility asset works on Littlefields Lane, Shepton Beauchamp, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 4 Apr 2025 at 14:01.

Wessex Internet logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Compton Hill

Wessex Internet are proposing to carry out Utility asset works on Compton Hill, South Petherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 4 Apr 2025 at 14:01.

Wessex Internet logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Shapway

Wessex Internet are proposing to carry out Utility asset works on Shapway, South Petherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 4 Apr 2025 at 14:01.

Gigaclear logo
Between
8 and 10 Jul 2025
Details
View Map
Share
North Street

Gigaclear were proposing to carry out Utility asset works on North Street, Martock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 10 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 8 May 2025 at 15:14.

Wessex Water logo
LONG TERM
Between
14 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Suggs Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Suggs Lane, Broadway, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 May 2025 at 12:29.

Wessex Water logo
LONG TERM
Between
14 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Suggs Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Suggs Lane, Broadway, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 4 Apr 2025 at 08:48.

Somerset County Council logo
Between
16 and 20 Jul 2025
Details
View Map
Share
Follow
Ham Hill Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Ham Hill Road, Norton Sub Hamdon, Stoke Sub Hamdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 1 Apr 2025 at 17:13.

Somerset County Council logo
Between
16 and 20 Jul 2025
Details
View Map
Share
Follow
Steamalong

Somerset County Council are proposing to carry out Highway repair and maintenance works on Steamalong, Isle Abbotts, Taunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 1 Apr 2025 at 17:01.

Somerset County Council logo
Between
25 and 29 Jul 2025
Details
View Map
Share
Follow
Fosse Way

Somerset County Council are proposing to carry out Highway repair and maintenance works on Fosse Way, Hinton St George.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 19 May 2025 at 12:22.

Wessex Internet logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Park Barn Lane

Wessex Internet are proposing to carry out Utility asset works on Park Barn Lane, Ashill, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 6 May 2025 at 08:37.

Wessex Internet logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Copse Lane

Wessex Internet are proposing to carry out Utility asset works on Copse Lane, Ashill, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 6 May 2025 at 08:37.

Western Power Distribution (South West) logo
Between
30 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Townsend

Western Power Distribution (South West) are proposing to carry out Utility asset works on Townsend, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 6 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 28 May 2025 at 15:05.

Western Power Distribution (South West) logo
Between
30 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Townsend

Western Power Distribution (South West) are proposing to carry out Utility asset works on Townsend, Ilminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 6 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 20 May 2025 at 12:58.

BT logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Roundham Straight

BT are proposing to carry out Utility asset works on Roundham Straight, Crewkerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 May 2025 at 11:49.

Wessex Water logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Holloway Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Holloway Road, Lopen, South Petherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the verge only.

This roadwork event was last updated by Wessex Water on 15 May 2025 at 12:26.

Wessex Water logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Holloway Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Holloway Road, Lopen, South Petherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the verge only.

This roadwork event was last updated by Wessex Water on 14 May 2025 at 09:36.


Roadworks Map near to Shepton Beauchamp, ILMINSTER, TA19 0LD (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 12:48
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Shepton Beauchamp, ILMINSTER, TA19 0LD (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Somerset County Council logo
URGENT
  
STONEY LANE, STOCKLINCH 
(1.0 miles)
Somerset County Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 27 Jan 2025 14:00
(Scheduled: 27 Jan 2025 - 31 Jul 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.