ROADWORKS SUMMARY
Uttoxeter Road, STOKE-ON-TRENT, ST3 6HE
Introduction
View current and future planned roadworks and road closures for Uttoxeter Road, ST3 6HE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Uttoxeter Road, STOKE-ON-TRENT, ST3 6HE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Uttoxeter Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on College Road, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 26 Aug 2022 at 13:54.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Avenue Road, Shelton, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 26 Aug 2022 at 13:54.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on The Parkway, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:27.
30 Mar 2025
Stoke-on-trent City Council are carrying out Highway improvement works on Cleveland Road, Shelton, Stoke-on-trent.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2024 at 08:00 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 17 Jul 2024 at 08:56.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Harding Road, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:27.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Victoria Avenue, Shelton, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:15.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Shirley Road, Shelton, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:16.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Potteries Way, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 10:50.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Trinity Street, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 1 Sep 2022 at 07:42.
3 Apr 2025
Stoke-on-trent City Council are carrying out Highway improvement works on Lower Bethesda Street, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2023 at 08:30 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 1 Nov 2023 at 10:46.
31 Dec 2025
Stoke-on-trent City Council are carrying out Highway improvement works on Station Road, Stoke, Stoke-on-trent.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 07:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 4 Jul 2024 at 13:16.
30 Mar 2025
Stoke-on-trent City Council are carrying out Highway improvement works on College Road, Stoke-on-trent.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 07:30 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 27 Nov 2023 at 07:53.
12 Mar 2024 and 12 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on City Road, Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2024 and could run through until 12 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 12 Mar 2024 at 11:32.
12 Mar 2024 and 12 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Stoke Road, Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2024 and could run through until 12 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 12 Mar 2024 at 12:28.
30 Mar 2025
Stoke-on-trent City Council are carrying out Highway improvement works on Regent Road, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 09:00 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Jun 2024 at 12:49.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Weston Road, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 13:55.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on City Road, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 13:28.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Stone Street, Penkhull, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 15:31.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Ephraim Street, Hanley, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 15:31.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Bucknall Road, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 11:51.
31 Aug 2024 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on A500 J A5007 Leave Nw, City Of Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 29 May 2024 at 14:30.
31 Aug 2024 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on A500 Link From A52/a5006 To A5007 Se, City Of Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 29 May 2024 at 14:30.
30 Mar 2025
Stoke-on-trent City Council are carrying out Highway improvement works on College Road, Stoke-on-trent.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2024 at 07:30 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 9 Oct 2024 at 09:23.
4 Nov 2024 and 31 Jan 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Longton Hall Road, Blurton, Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 1 Oct 2024 at 11:44.
31 May 2025
Staffordshire County Council are carrying out Highway improvement works on Mill Lane, Moddershall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 00:00 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 14:48.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Cellarhead Road, Cellarhead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 11:00.
Tuesday
Staffordshire County Council are carrying out Highway improvement works on Hulme Road, Hulme.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 09:35 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 09:56.
2 Jan 2025
Cadent Gas are carrying out Utility repair and maintenance works on Leek Road, Stoke-on-trent.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 14:00 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 12:15.
18 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Grindley Lane, Meir Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:51.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Fulford Road, Spot Acre.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 16:05.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Tittensor Road, Barlaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 16:17.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Station Road, Barlaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 11:30.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Old Road, Barlaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 16:05.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Blurton Road, Barlaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 16:04.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Longton Road, Barlaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 16:05.
Today
Staffordshire County Council are proposing to carry out Highway improvement works on Cocknage Road, Rough Close.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 25 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 14:01.
Today
Staffordshire County Council are proposing to carry out Highway improvement works on Combe Drive, Meir Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 25 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 14:53.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Blurton Road, Barlaston Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 11:17.
Friday
Staffordshire County Council were proposing to carry out Highway improvement works on Huntley Lane, Huntley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 11:01.
Friday
Staffordshire County Council were proposing to carry out Highway improvement works on Huntley Lane, Huntley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 11:37.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Cheadle Road, Draycott In The Moors.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 09:44.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Byway Open To All Traffic Draycott In The Moors 1, Draycott In The Moors.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 09:28.
Friday
Staffordshire County Council were proposing to carry out Highway improvement works on Dilhorne Road, Forsbrook.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 11:01.
Friday
Staffordshire County Council were proposing to carry out Highway improvement works on Dilhorne Road, Forsbrook.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 11:54.
Friday
Staffordshire County Council were proposing to carry out Highway improvement works on New Haden Road, Cheadle.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 11:01.
Friday
Staffordshire County Council were proposing to carry out Highway improvement works on New Haden Road, Cheadle.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 11:37.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 12:23.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Allen Street, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 12:23.
Friday
Staffordshire County Council were proposing to carry out Highway improvement works on Caverswall Road, Dilhorne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 11:01.
Friday
Staffordshire County Council were proposing to carry out Highway improvement works on Caverswall Road, Dilhorne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 11:37.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Common Lane, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 11:17.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Godley Lane, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 09:58.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Washerwall Lane, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 11:36.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Johnstone Avenue, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 11:36.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Eaves Lane, Armshead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 11:27.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Oulton Road, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 11:23.
30 Dec 2024 and 2 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Godleybarn Lane, Godleybrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 11:01.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stonehouse Road, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 13:12.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Rownall Road, Cellarhead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 13:55.
2 and 5 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Tape Street, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 11:19.
6 and 9 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Barlaston Road, Cocknage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 13:50.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Huntley Lane, Huntley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:15.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Tean Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:46.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Boundary Road, Boundary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:02.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Churchill Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 16:33.
6 Jan and 28 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on London Road, Oakhill, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 12 Nov 2024 at 14:52.
6 Jan 2025 and 20 Jan 2026
Staffordshire County Council were proposing to carry out Highway improvement works on Leek Road, Moorville.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 20 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 16:07.
6 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Moorville.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 15:53.
6 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Main Road, Wetley Rocks.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 11:04.
7 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on New Haden Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:59.
7 and 13 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Greasley Road, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 13:14.
8 Jan and 4 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on New Inn Lane, Hanford, Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 17:35.
11 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cresswell Lane, Cresswell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 9 Oct 2024 at 10:09.
11 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cresswell Lane, Cresswell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 4 Dec 2024 at 07:12.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Cotwalton Road, Cotwalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 09:40.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lane From Oulton To Cotwalton, Cotwalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 09:27.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Outlanes, Oulton Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 09:27.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Rock Crescent, Oulton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 09:27.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Moddershall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 11:44.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Attlee Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:22.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Avenue, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:09.
13 and 17 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Prince George Street, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 18 Dec 2024 at 15:00.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Roughcote Lane, Caverswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 14:13.
13 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Glandore Road, Longton, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 15:50.
13 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Carberry Way, Longton, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 15:45.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Roughcote Lane, Roughcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 14:13.
13 Jan and 14 Apr 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on A500 J A5007 Leave Nw, City Of Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 7 Nov 2024 at 16:30.
13 Jan and 14 Apr 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on City Road, Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 6 Nov 2024 at 15:04.
13 Jan and 14 Apr 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on A500 Link From A52/a5006 To A5007 Se, City Of Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 7 Nov 2024 at 16:30.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hulme Lane, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 14:54.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Washerwall Lane, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 09:06.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stonehouse Road, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 09:31.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Johnstone Avenue, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 09:13.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Rownall Road, Rownall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 14:37.
14 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:00.
14 and 16 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Park Avenue, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:00.
14 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Allen Street, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:00.
15 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Brookhouse Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 28 Nov 2024 at 14:01.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Draycott Old Road, Forsbrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 10:55.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Harplow Lane, Brookhouses.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 15:41.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Rakeway Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 09:03.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Dilhorne Road, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 09:03.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blythe Bridge Road, Blythe Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 15:41.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Dams, Caverswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 15:59.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Dilhorne Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 15:50.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Brookhouse Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 09:17.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lid Lane, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 15:50.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Charles Street, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 15:37.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Hollow, Caverswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 12:17.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Well Street, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 15:50.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Trimpos, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 09:17.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Road, Caverswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 11:50.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Handley Banks, Hardiwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 11:50.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Adderley, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 09:17.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Winterfield Lane, Hulme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 09:03.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Byway Open To All Traffic Kingsley 23, Kingsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 09:55.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Dilhorne Road, Blakeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 10:55.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Chatsworth Drive, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 09:03.
21 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Old Road, Barlaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 14:44.
23 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Hilderstone Road, Meir Heath.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 13:32.
23 Jan and 19 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Sandon Road, Stoke-on-trent.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 15:41.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Harplow Lane, Brookhouses.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 07:43.
27 and 29 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on New Haden Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:14.
27 Jan and 4 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Greasley Road, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 12:50.
27 Jan and 4 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Greasley Road, Stoke-on-trent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 18:22.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Oulton Road, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 10:36.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Moddershall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 10:11.
3 and 7 Feb 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Tittensor Road, Barlaston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 17:35.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Tittensor Road, Barlaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 29 Oct 2024 at 12:24.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Old Road, Barlaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blurton Road, Barlaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 29 Oct 2024 at 12:10.
3 Feb and 7 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Leek Road, Stoke-on-trent.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 12:07.
3 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ash Bank Road, Werrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 12:00.
3 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ash Bank Road, Werrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Nov 2024 at 13:57.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Washerwall Lane, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 11:45.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stonehouse Road, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 11:45.
4 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Spot Grange Lane, Hilderstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 10:33.
4 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blurton Road, Barlaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 12:13.
4 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Barlaston Road, Cocknage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 11:59.
4 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Draycott Old Road, Forsbrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:54.
4 and 6 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Wolseley Road, Oakhill, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 14:34.
4 and 6 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Wolseley Road, Oakhill, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 14:10.
5 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hall Lane, Hilderstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 12:13.
5 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Churchill Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 07:43.
6 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Meigh Road, Werrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 12:36.
6 and 20 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Chetwynd Avenue, Werrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 16:48.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hayes Bank, Cotwalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 14:18.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Morrilow Heath Road, Morrilow Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 14:18.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Moddershall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 12:28.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Avenue, Blythe Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 08:22.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Road, Blythe Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:00.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Old Road, Forsbrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 12:49.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Old Road, Forsbrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:41.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blythe Bridge Road, Blythe Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 08:35.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Attlee Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:51.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Lane, Caverswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 12:49.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Lane, Caverswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 08:47.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Avenue, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:51.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Tickhill Lane, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 08:09.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Road, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 12:49.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Road, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 08:35.
10 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Glandore Road, Longton, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 16:56.
10 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Carberry Way, Longton, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 16:57.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Perkins Lane, Godleybrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:26.
10 and 12 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Penkhull New Road, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 13:55.
10 and 12 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Penkhull New Road, Stoke-on-trent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 14:47.
10 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Grant Street, Stoke, Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 15:20.
10 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Leek Road, Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 15:21.
10 and 14 Feb 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Ash Bank Road, Werrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:59.
10 and 14 Feb 2025
Staffordshire County Council were proposing to carry out Remedial works on Ash Bank Road, Werrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:59.
10 and 14 Feb 2025
Staffordshire County Council were proposing to carry out Remedial works on Ash Bank Road, Werrington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:59.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ash Bank Road, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:13.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Armshead Road, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 12:49.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Armshead Road, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:46.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Remedial works on Armshead Road, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:46.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Armshead Road, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 08:22.
11 and 13 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Adamthwaite Drive, Blythe Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 28 Nov 2024 at 15:29.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Oulton Road, Stone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 09:57.
17 and 28 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Stone Street, Stoke-on-trent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 12:04.
17 and 28 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stone Street, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 15:17.
17 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Washerwall Lane, Werrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 10:03.
19 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chetwynd Avenue, Werrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 10:03.
20 Feb and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Meigh Road, Werrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 10:03.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Draycott Cross Road, Brookhouses.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 22 Nov 2024 at 10:40.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Draycott Cross Road, Brookhouses.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 15:03.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Dilhorne Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Dec 2024 at 09:54.
24 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Marsh Close, Werrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 10:03.
24 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Marsh Close, Werrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 11:09.
25 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Dilhorne Road, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Dec 2024 at 10:24.
27 Feb and 4 Sep 2025
National Highways are proposing to carry out Highway repair and maintenance works on Campbell Road, Stoke, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 14 Nov 2024 at 16:07.
27 Feb and 4 Sep 2025
National Highways were proposing to carry out Remedial works on Campbell Road, Stoke, Stoke-on-trent.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 February 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 14 Nov 2024 at 15:11.
27 Feb and 4 Sep 2025
National Highways are proposing to carry out Highway repair and maintenance works on Campbell Road, Stoke, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 14 Nov 2024 at 15:16.
3 Mar and 31 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Moddershall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 12:49.
3 and 7 Mar 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Station Road, Barlaston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 13:01.
3 and 5 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Beechcliffe Lane, Tittensor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Dec 2024 at 14:48.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Harplow Lane, Brookhouses.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 15:31.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Boundary Road, Boundary.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 07:57.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Roughcote Lane, Caverswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 10:24.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Churchill Road, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 15:46.
3 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Moorville.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 18:49.
3 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Moorville.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 10:13.
7 and 20 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Tatton Street, Longton, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 14:54.
7 and 20 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Tatton Street, Longton, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 13:57.
7 and 20 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lightwood Road, Lightwood, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:10.
7 and 20 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lightwood Road, Lightwood, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:59.
7 and 13 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Prince George Street, Cheadle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 18 Dec 2024 at 14:16.
17 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Morrilow Heath Road, Morrilow Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 09:42.
17 and 21 Mar 2025
Severn Trent Water are proposing to carry out Remedial works on Garfield Crescent, Hanford, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 12:45.
18 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hayes Bank, Cotwalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 09:16.
18 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hayes Bank, Cotwalton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 12:01.
18 and 21 Mar 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Caverswall Road, Dilhorne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 10:29.
18 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Road, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 15:05.
18 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Road, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 08:23.
19 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Old Road, Forsbrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 09:11.
19 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Caverswall Old Road, Forsbrook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:21.
19 and 21 Mar 2025
Staffordshire County Council were proposing to carry out Remedial works on Tickhill Lane, Dilhorne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 10:43.
19 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Tickhill Lane, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 15:05.
19 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Tickhill Lane, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 08:23.
19 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Remedial works on Tickhill Lane, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 10:43.
19 and 21 Mar 2025
Staffordshire County Council are proposing to carry out Remedial works on Tickhill Lane, Dilhorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 10:43.
19 and 21 Mar 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Tickhill Lane, Dilhorne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 11:41.
24 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Remedial works on Roughcote Lane, Caverswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 10:24.
24 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Roughcote Lane, Caverswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 11:39.
24 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Roughcote Lane, Caverswall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 14:06.
24 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Roughcote Lane, Roughcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 14:06.
24 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hulme Lane, Werrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 28 Nov 2024 at 14:47.
Roadworks Map near to Uttoxeter Road, STOKE-ON-TRENT, ST3 6HE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Uttoxeter Road, STOKE-ON-TRENT, ST3 6HE (8 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 May 2024 - 8 May 2025)