ROADWORKS SUMMARY
Vicarage Road, STAFFORD, ST19 9HA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Vicarage Road, ST19 9HA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Vicarage Road, STAFFORD, ST19 9HA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Vicarage Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Staffordshire County Council logo
LONG TERM
Until
15 Oct 2025
Details
View Map
Share
Follow
Otherton Lane

Staffordshire County Council are carrying out Highway improvement works on Otherton Lane, Penkridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2025 at 00:00 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Sep 2025 at 16:15.

Cadent Gas logo
Between
22 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jul 2025 at 12:34.

Cadent Gas logo
LONG TERM
Until
4 Nov 2025
Details
View Map
Share
Follow
Macrome Road

Cadent Gas are carrying out Utility asset works on Macrome Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 September 2025 at 13:25 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2025 at 13:32.

Cadent Gas logo
LONG TERM
Between
22 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Macrome Road

Cadent Gas are proposing to carry out Utility asset works on Macrome Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2025 at 16:06.

Cadent Gas logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Horsebrook Lane

Cadent Gas are proposing to carry out Utility asset works on Horsebrook Lane, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 15:36.

Cadent Gas logo
Until
31 Oct 2025
Details
View Map
Share
Follow
Horsebrook Lane

Cadent Gas are carrying out Utility asset works on Horsebrook Lane, Brewood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 09:17 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 09:24.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Primrose Avenue

Network Rail are proposing to carry out Works for Rail Purposes on Primrose Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Aug 2025 at 11:26.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Wenlock Bank

Staffordshire County Council are proposing to carry out Highway improvement works on Wenlock Bank, Lapley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 31 Jul 2025 at 10:29.

City Of Wolverhampton Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Codsall Road

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Codsall Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 29 Sep 2025 at 12:11.

BT logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Malt House Lane

BT were proposing to carry out Utility asset works on Malt House Lane, Latherford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Jul 2025 at 10:01.

BT logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Latherford Lane

BT were proposing to carry out Utility asset works on Latherford Lane, Latherford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Jul 2025 at 10:05.

Staffordshire County Council logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Orchard Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Orchard Lane, Shareshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2025 at 10:18.

BT logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Featherstone Lane

BT were proposing to carry out Utility asset works on Featherstone Lane, Featherstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 15 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 25 Jul 2025 at 08:21.

Staffordshire County Council logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Follow
Lansdowne Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Lansdowne Avenue, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Aug 2025 at 16:33.

Staffordshire County Council logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Bell Hurst Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Bell Hurst Lane, Wheaton Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2025 at 08:03.

Severn Trent Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Tennyson Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Tennyson Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2025 at 09:52.

Severn Trent Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Tennyson Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Tennyson Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 14 Aug 2025 at 10:37.

Severn Trent Water logo
Between
21 and 24 Oct 2025
Details
View Map
Share
Follow
Elms Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Elms Lane, Shareshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Sep 2025 at 09:58.

Staffordshire County Council logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Shop Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Shop Lane, Oaken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Aug 2025 at 12:26.

Staffordshire County Council logo
Between
25 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Bellbrook

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Bellbrook, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Aug 2025 at 12:26.

Staffordshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Market Street

Staffordshire County Council are proposing to carry out Highway improvement works on Market Street, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Sep 2025 at 11:59.

Staffordshire County Council logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Vicarage Road

Staffordshire County Council are proposing to carry out Highway improvement works on Vicarage Road, Calf Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2025 at 14:33.

Staffordshire County Council logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Vicarage Road

Staffordshire County Council are proposing to carry out Highway improvement works on Vicarage Road, Calf Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2025 at 14:33.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Featherstone Lane

BT were proposing to carry out Utility asset works on Featherstone Lane, Featherstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 1 Aug 2025 at 12:28.

Severn Trent Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Kiddemore Green Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Kiddemore Green Road, Brewood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Aug 2025 at 13:09.

BT logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Malt House Lane

BT were proposing to carry out Utility asset works on Malt House Lane, Latherford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 1 Aug 2025 at 12:29.

BT logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Latherford Lane

BT were proposing to carry out Utility asset works on Latherford Lane, Latherford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 1 Aug 2025 at 12:31.

Staffordshire County Council logo
Between
28 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Marsh Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Marsh Lane, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Aug 2025 at 12:43.

Severn Trent Water logo
LONG TERM
Between
28 Oct 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Greenhill Lane

Severn Trent Water are proposing to carry out Utility asset works on Greenhill Lane, Wheaton Aston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 8 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 28 Jul 2025 at 14:02.

Severn Trent Water logo
LONG TERM
Between
28 Oct 2025 and 8 Jan 2026
Details
View Map
Share
Greenhill Lane

Severn Trent Water were proposing to carry out Utility asset works on Greenhill Lane, Wheaton Aston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 8 January 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 4 Sep 2025 at 09:48.

Severn Trent Water logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Vicarage Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Vicarage Road, Brewood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Aug 2025 at 09:11.

Staffordshire County Council logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Birches Road

Staffordshire County Council are proposing to carry out Highway improvement works on Birches Road, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 13 Aug 2025 at 15:45.

Staffordshire County Council logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Birches Road

Staffordshire County Council are proposing to carry out Highway improvement works on Birches Road, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 6 Aug 2025 at 14:42.

BT logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Malt House Lane

BT were proposing to carry out Utility asset works on Malt House Lane, Latherford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 5 November 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 1 Sep 2025 at 15:04.

Staffordshire County Council logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Marston Road

Staffordshire County Council are proposing to carry out Highway improvement works on Marston Road, Wheaton Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 22 Sep 2025 at 09:58.

BT logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Latherford Lane

BT were proposing to carry out Utility asset works on Latherford Lane, Latherford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 1 Sep 2025 at 15:06.

BT logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Featherstone Lane

BT are proposing to carry out Utility asset works on Featherstone Lane, Featherstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 29 Aug 2025 at 11:35.

City Of Wolverhampton Council logo
Between
3 and 6 Nov 2025
Details
View Map
Share
Follow
Windermere Road

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Windermere Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 13 Aug 2025 at 07:39.

Staffordshire County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Pillaton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Pillaton Lane, Pillaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 1 Aug 2025 at 12:28.

Staffordshire County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Whitehouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Whitehouse Lane, Codsall Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Aug 2025 at 14:19.

Staffordshire County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Chillington Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Chillington Lane, Codsall Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Aug 2025 at 13:16.

Severn Trent Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Suckling Green Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Suckling Green Lane, Codsall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 13 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 21 Aug 2025 at 11:38.

Staffordshire County Council logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Moatbrook Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Moatbrook Lane, Codsall Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Aug 2025 at 14:19.

City Of Wolverhampton Council logo
Between
17 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Wood Lane

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Wood Lane, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by City Of Wolverhampton Council on 25 Sep 2025 at 10:13.

Staffordshire County Council logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Wenlock Bank

Staffordshire County Council are proposing to carry out Highway improvement works on Wenlock Bank, Lapley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Aug 2025 at 15:40.

Staffordshire County Council logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Bell Hurst Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Bell Hurst Lane, Wheaton Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Aug 2025 at 15:40.

Staffordshire County Council logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Lapley Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Lapley Lane, Stretton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Aug 2025 at 15:22.

Severn Trent Water logo
LONG TERM
Between
18 Nov and 22 Dec 2025
Details
View Map
Share
Ashleigh Crescent

Severn Trent Water were proposing to carry out Utility asset works on Ashleigh Crescent, Wheaton Aston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2025 and run through until 22 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Sep 2025 at 10:56.

City Of Wolverhampton Council logo
Between
20 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Windermere Road

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Windermere Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 24 Sep 2025 at 16:08.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
24 Nov and 26 Dec 2025
Details
View Map
Share
Follow
Stable Lane

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Stable Lane, Calf Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Sep 2025 at 12:03.

Staffordshire County Council logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Pinfold Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Pinfold Lane, Congreve.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 30 Sep 2025 at 09:50.

Severn Trent Water logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Kiddemore Green Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Kiddemore Green Road, Brewood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 26 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Sep 2025 at 11:45.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
24 Nov and 26 Dec 2025
Details
View Map
Share
Follow
Vicarage Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Vicarage Road, Calf Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 December 2025. The works will impact the verge only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Sep 2025 at 12:03.

BT logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Levedale Road

BT are proposing to carry out Utility repair and maintenance works on Levedale Road, Levedale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 29 Sep 2025 at 15:26.

Severn Trent Water logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Vicarage Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Vicarage Road, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Sep 2025 at 16:29.

Severn Trent Water logo
Between
25 and 27 Nov 2025
Details
View Map
Share
Follow
Vicarage Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Vicarage Road, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2025 at 16:23.

BT logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Fullmoor Lane

BT are proposing to carry out Utility asset works on Fullmoor Lane, Hatherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Sep 2025 at 15:36.

BT logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Fullmoor Lane

BT are proposing to carry out Utility asset works on Fullmoor Lane, Hatherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 Oct 2025 at 14:54.

Severn Trent Water logo
Between
2 and 5 Dec 2025
Details
View Map
Share
Follow
Suckling Green Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Suckling Green Lane, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2025 at 14:53.

BT logo
Between
2 and 9 Dec 2025
Details
View Map
Share
Latherford Lane

BT were proposing to carry out Utility asset works on Latherford Lane, Latherford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2025 and run through until 9 December 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 9 Sep 2025 at 16:47.

City Of Wolverhampton Council logo
Between
2 and 10 Dec 2025
Details
View Map
Share
Follow
Edgehill Avenue

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Edgehill Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 24 Sep 2025 at 10:31.

Severn Trent Water logo
Between
2 and 5 Dec 2025
Details
View Map
Share
Follow
Suckling Green Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Suckling Green Lane, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 25 Sep 2025 at 09:32.

Severn Trent Water logo
LONG TERM
Between
4 Dec 2025 and 2 Mar 2026
Details
View Map
Share
Greenhill Lane

Severn Trent Water were proposing to carry out Utility asset works on Greenhill Lane, Wheaton Aston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2025 and run through until 2 March 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 6 Oct 2025 at 13:37.

BT logo
Between
4 and 11 Dec 2025
Details
View Map
Share
Latherford Lane

BT were proposing to carry out Utility asset works on Latherford Lane, Latherford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2025 and run through until 11 December 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 16 Sep 2025 at 15:25.

Staffordshire County Council logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Joeys Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Joeys Lane, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2025 at 10:17.

Staffordshire County Council logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Market Street

Staffordshire County Council are proposing to carry out Highway improvement works on Market Street, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Sep 2025 at 13:28.

Staffordshire County Council logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Orchard Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Orchard Lane, Shareshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2025 at 10:57.

Severn Trent Water logo
Between
8 Dec 2025 and 7 Jan 2026
Details
View Map
Share
Follow
Kiddemore Green Road

Severn Trent Water are proposing to carry out Utility asset works on Kiddemore Green Road, Bishops Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 7 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 9 Sep 2025 at 12:06.

BT logo
Between
15 and 22 Dec 2025
Details
View Map
Share
Follow
Latherford Lane

BT are proposing to carry out Utility asset works on Latherford Lane, Latherford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 22 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Sep 2025 at 11:11.

Staffordshire County Council logo
Between
22 and 26 Dec 2025
Details
View Map
Share
Follow
Marston Road

Staffordshire County Council are proposing to carry out Highway improvement works on Marston Road, Wheaton Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 December 2025 and could run through until 26 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2025 at 11:15.

Cadent Gas logo
Between
27 Dec 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Windermere Road

Cadent Gas are proposing to carry out Utility asset works on Windermere Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2025 at 12:16.

Staffordshire County Council logo
Between
29 Dec 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Horsebrook Farm Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Horsebrook Farm Lane, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 December 2025 and could run through until 2 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Sep 2025 at 12:58.

Staffordshire County Council logo
Between
29 Dec 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Horsebrook Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Horsebrook Lane, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 December 2025 and could run through until 2 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Sep 2025 at 12:35.

Staffordshire County Council logo
Between
29 Dec 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Bognop Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bognop Road, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 December 2025 and could run through until 2 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Sep 2025 at 14:31.

Staffordshire County Council logo
Between
29 Dec 2025 and 2 Jan 2026
Details
View Map
Share
Follow
Pendeford Hall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Pendeford Hall Lane, Coven.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 December 2025 and could run through until 2 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2025 at 13:47.


Roadworks Map near to Vicarage Road, STAFFORD, ST19 9HA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 8 Oct 2025 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Vicarage Road, STAFFORD, ST19 9HA (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
COVEN ROAD 
(0.5 miles)
BT
Utility repair and maintenance works - Carriageway - Two-way signals
Cancelled
(Scheduled: 7 Oct 2025 - 9 Oct 2025)
0.5
Details
Share
2
Cadent Gas logo
MAJOR
  
HORSEBROOK LANE 
(0.9 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 6 Oct 2025 - 31 Oct 2025
0.9
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
HORSEBROOK LANE 
(0.9 miles)
Cadent Gas
Utility asset works - Carriageway - Road closure
In Progress
Since: 6 Oct 2025 09:17
(Scheduled: 6 Oct 2025 - 31 Oct 2025)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.