ROADWORKS SUMMARY
Acton Trussell, STAFFORD, ST17 0RS
Introduction
View current and future planned roadworks and road closures for ST17 0RS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Acton Trussell, STAFFORD, ST17 0RS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Sep and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Baswich Lane, Stafford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Staffordshire County Council on 4 Jun 2024 at 13:13.
20 Dec 2024
Staffordshire County Council are carrying out Highway repair and maintenance works on Baswich Lane, Stafford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2024 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Sep 2024 at 14:35.
28 Feb 2025
Staffordshire County Council are carrying out Highway repair and maintenance works on Radford Bank, Stafford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 00:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 2 Sep 2024 at 14:36.
4 Jul 2025
Staffordshire County Council are carrying out Highway repair and maintenance works on Queensville, Stafford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 00:00 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 11:40.
4 Jul 2025
Staffordshire County Council are carrying out Highway repair and maintenance works on Ampleforth Drive, Stafford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 00:00 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 11:40.
14 Oct and 13 Dec 2024
Western Power Distribution (West Midlands) are proposing to carry out Disconnection or alteration of supply on Link Footways Between Bell Close And Lister Road, Stafford.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 14 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Aug 2024 at 09:21.
14 Oct and 13 Dec 2024
Western Power Distribution (West Midlands) are proposing to carry out Disconnection or alteration of supply on Link Footways Between Bell Close And Lister Road, Stafford.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 14 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Sep 2024 at 13:52.
14 Oct and 13 Dec 2024
Western Power Distribution (West Midlands) were proposing to carry out Disconnection or alteration of supply on Link Footways Between Bell Close And Lister Road, Stafford.
These works were categorised as Major.
There were no traffic signals or road closures necessary for these works and traffic would have operated on a give-and-take basis. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 13 Nov 2024 at 13:19.
Monday
Cadent Gas are proposing to carry out Utility asset works on Thornhill Road, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Jul 2024 at 11:41.
4 Nov 2024 and 8 Aug 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Ampleforth Drive, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 13 Aug 2024 at 14:07.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Market Street, Penkridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Aug 2024 at 11:57.
Tomorrow
Cadent Gas are proposing to carry out New service connection on Tylecote Crescent, Great Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 11:39.
Monday
Cadent Gas are carrying out New service connection on Tylecote Crescent, Great Haywood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 10:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:02.
25 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Moreton Street, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 12:07.
25 and 29 Nov 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Merrivale Road, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Aug 2024 at 10:38.
25 and 29 Nov 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Burton Manor Road, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Aug 2024 at 10:51.
25 and 29 Nov 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Somerset Road, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 09:39.
25 and 29 Nov 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Manor Farm Road, Little Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 22 Aug 2024 at 09:08.
25 and 29 Nov 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Garden Street, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Aug 2024 at 08:56.
25 and 28 Nov 2024
Cadent Gas are proposing to carry out New service connection on Orchard Street, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:34.
25 and 29 Nov 2024
Staffordshire County Council were proposing to carry out Highway improvement works on St Thomas Lane, Beaconside.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Aug 2024 at 13:52.
26 and 28 Nov 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Bungham Lane, Penkridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 10:43.
2 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Belt Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 16:29.
2 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Heath Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:05.
2 and 16 Dec 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Porlock Avenue, Stafford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 10:29.
2 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Sabine Street, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 14:47.
2 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Meyrick Road, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 14:47.
2 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Mount Pleasant, Derrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 15:06.
2 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Garden Street, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 12:30.
2 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Cramer Street, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 15:00.
2 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Butterbank Lane, Coton Clanford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 15:01.
2 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Weston Road Back Alley Rear Of Numbers 15 To 79, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 12:30.
2 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Westhead Avenue, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 14:47.
2 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Great Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 15:00.
4 and 6 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Bungham Lane, Penkridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 09:26.
6 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Moreton Street, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 09:49.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Boswell Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 12:00.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Fern Road, Huntington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 13:59.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Ling Road, Huntington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 13:22.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Pillaton Lane, Pillaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 13:22.
9 and 11 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Bungham Lane, Penkridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Sep 2024 at 16:16.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Cherry Tree Road, Huntington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 13:07.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Oak Avenue, Huntington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 13:22.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Maple Drive, Huntington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 13:34.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Levedale Road, Longridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 10:49.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Camp Road, Broadhurst Green, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:44.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Meadow Lane, Acton Trussell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 14:23.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Top Road, Acton Trussell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 14:23.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Acton Hill Road, Acton Trussell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:45.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Acton Hill Lane, Acton Trussell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:45.
9 and 13 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Southfields Road, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 16:01.
9 and 12 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Great Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 11:31.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Pinewood Avenue, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 14:36.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Bath Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 14:36.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Penkvale Road, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 16:01.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Remedial works on Holdiford Road, Tixall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 08:17.
17 and 20 Dec 2024
Staffordshire County Council were proposing to carry out Remedial works on Coley Lane, Little Haywood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 15:11.
18 and 20 Dec 2024
BT are proposing to carry out Utility asset works on Levedale Road, Levedale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 25 Sep 2024 at 13:12.
19 Dec 2024 and 13 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Brocton Road, Brocton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 13 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 09:28.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Road, Pillaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 10:56.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Main Road, Colwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 15:14.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Main Road, Little Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 15:01.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Coley Lane, Little Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 10:57.
30 Dec 2024 and 1 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Butterbank Lane, Coton Clanford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 09:41.
30 Dec 2024 and 1 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Greyfriars Place, Stafford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 December 2024 and run through until 1 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 12:31.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Johnson Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 15:53.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Cecil Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:32.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Otherton Lane, Penkridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 16:06.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Pye Green Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:20.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blewitt Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:20.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blewitt Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 13:03.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Whitfield Road, Hednesford, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:33.
6 Jan and 15 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green, Pye Green, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Aug 2024 at 16:19.
6 Jan and 15 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green, Pye Green, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 14:56.
6 Jan and 28 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green, Pye Green, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Nov 2024 at 13:09.
6 Jan and 15 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green Service Road, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Aug 2024 at 16:19.
6 Jan and 15 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green Service Road, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 15:23.
6 Jan and 28 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green Service Road, Cannock.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Nov 2024 at 13:23.
6 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Pinfold Lane, Penkridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 13:26.
6 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Pinfold Lane, Penkridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 11 Jul 2024 at 12:02.
6 Jan and 4 Jul 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Silkmore Lane, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:18.
6 Jan and 4 Jul 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Queensville Bridge, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:18.
6 Jan and 4 Jul 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Lichfield Road, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:18.
6 Jan and 4 Jul 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Queensville Roundabout, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:18.
6 Jan and 4 Jul 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Queensville Avenue, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:35.
6 Jan and 4 Jul 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on St Leonards Avenue, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:18.
6 Jan and 4 Jul 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Riverway, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:32.
6 Jan and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Queensway, Stafford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 29 Oct 2024 at 14:38.
6 Jan and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Queensway, Stafford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 29 Oct 2024 at 14:31.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Weston Road, Stafford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 09:30.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Harris Road, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Nov 2024 at 11:25.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Otherton Lane, Penkridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 14:53.
13 and 22 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Corporation Street, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Aug 2024 at 14:01.
20 and 24 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Water Eaton Lane, Water Eaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 11:21.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Water Eaton Lane, Water Eaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 14:29.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Water Eaton Lane, Congreve.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 08:37.
20 and 22 Jan 2025
BT are proposing to carry out Utility asset works on Levedale Road, Levedale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 14 Oct 2024 at 17:30.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Bednall Road, Acton Trussell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 08:50.
20 and 23 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Nelson Way, Stafford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 23 Oct 2024 at 13:18.
20 and 28 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Shrewsbury Road, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 1 Nov 2024 at 14:54.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mount Pleasant, Derrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 09:17.
20 and 23 Jan 2025
Cadent Gas are proposing to carry out New service connection on Orchard Street, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 12:16.
22 and 24 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Nelson Way, Stafford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 13:58.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Pinewood Avenue, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 12:52.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Bath Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:45.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Belt Road, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 11:48.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Heath Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:41.
27 and 29 Jan 2025
BT were proposing to carry out Utility asset works on Levedale Road, Levedale.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 8 Nov 2024 at 15:53.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Camp Road, Broadhurst Green, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:08.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Meadow Lane, Acton Trussell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:07.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Top Road, Acton Trussell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:07.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Acton Hill Road, Acton Trussell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:54.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Acton Hill Lane, Acton Trussell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:38.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Brocton Road, Brocton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 09:38.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Butterbank Lane, Coton Clanford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:08.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blewitt Street, Cannock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 11:11.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Sandon Road, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 15:14.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Sandon Road, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 1 Nov 2024 at 08:56.
3 and 28 Feb 2025
Severn Trent Water are proposing to carry out Utility asset works on Meakin Grove, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 08:29.
10 and 14 Feb 2025
Staffordshire County Council were proposing to carry out Remedial works on Bednall Road, Acton Trussell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 12:55.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Bednall Road, Acton Trussell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 14:05.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Main Road, Little Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 07:22.
10 and 13 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Coley Lane, Little Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 12:27.
10 and 19 Feb 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Anson Row, Little Haywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:30.
12 and 14 Feb 2025
BT are proposing to carry out Utility asset works on Levedale Road, Levedale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 19 Nov 2024 at 10:14.
12 and 14 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Nelson Way, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 13:10.
18 and 20 Feb 2025
BT are proposing to carry out Utility asset works on Bradley Lane, Haughton, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 12 Nov 2024 at 12:25.
18 and 20 Feb 2025
BT are proposing to carry out Utility asset works on Bradley Lane, Haughton, Stafford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 13 Nov 2024 at 08:41.
Roadworks Map near to Acton Trussell, STAFFORD, ST17 0RS
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Acton Trussell, STAFFORD, ST17 0RS (1 Events)