ROADWORKS SUMMARY
Ashbourne Road, STOKE-ON-TRENT, ST10 3EZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Ashbourne Road, ST10 3EZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ashbourne Road, STOKE-ON-TRENT, ST10 3EZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ashbourne Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Staffordshire County Council logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Kingsley Bank

Staffordshire County Council are carrying out Highway improvement works on Kingsley Bank, Froghall.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2025 at 12:33 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Dec 2025 at 08:42.

Staffordshire County Council logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Manifold Valley Road

Staffordshire County Council are carrying out Highway improvement works on Manifold Valley Road, Waterhouses.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 10:25 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Sep 2026 at 11:56.

South Staffordshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Dove Street

South Staffordshire Water are carrying out Utility repair and maintenance works on Dove Street, Ellastone.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 09:46 and could run through until 16 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 10 Sep 2026 at 11:06.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Park Nook

Staffordshire County Council were proposing to carry out Highway improvement works on Park Nook, Winkhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Sep 2026 at 12:20.

Staffordshire County Council logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Dog Lane

Staffordshire County Council are carrying out Highway improvement works on Dog Lane, Ipstones Edge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 09:38 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2026 at 10:07.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Dog Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dog Lane, Windy Harbour.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 1 Jul 2026 at 13:37.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Harveys Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Harveys Lane, Kingsley Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Aug 2026 at 15:39.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Byway Open To All Traffic Kingsley 23

Staffordshire County Council are proposing to carry out Highway improvement works on Byway Open To All Traffic Kingsley 23, Kingsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Aug 2026 at 14:10.

Staffordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Fairview Lane

Staffordshire County Council are carrying out Highway improvement works on Fairview Lane, Pethillshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 09:17 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Sep 2026 at 09:42.

Staffordshire County Council logo
Today
Details
View Map
Share
High Street

Staffordshire County Council carried out Highway improvement works on High Street, Cheadle.

The road was closed for some or all of the period.

The works were completed on 16 September 2026 The works impacted the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2026 at 16:35.

Staffordshire County Council logo
Between
17 and 25 Sep 2026
Details
View Map
Share
Follow
Park Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Park Lane, Ipstones.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Sep 2026 at 11:46.

Staffordshire County Council logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Apesford Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Apesford Lane, Bradnop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Jun 2026 at 09:29.

Staffordshire County Council logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Chapel Street

Staffordshire County Council are proposing to carry out Highway improvement works on Chapel Street, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Jul 2026 at 15:06.

Staffordshire County Council logo
Between
21 and 23 Sep 2026
Details
View Map
Share
Follow
Wetley Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wetley Lane, Onecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Aug 2026 at 09:20.

Staffordshire County Council logo
Between
22 and 29 Sep 2026
Details
View Map
Share
Follow
Pethillshead Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Pethillshead Lane, Pethillshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Jul 2026 at 11:55.

Cadent Gas logo
LONG TERM
Between
25 Sep and 6 Nov 2026
Details
View Map
Share
Follow
Churnet Valley Road

Cadent Gas are proposing to carry out Utility asset works on Churnet Valley Road, Kingsley Holt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 10:21.

Staffordshire County Council logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Foxt Road

Staffordshire County Council are proposing to carry out Highway improvement works on Foxt Road, Foxt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Aug 2026 at 11:36.

Severn Trent Water logo
Between
30 Sep and 28 Oct 2026
Details
View Map
Share
Follow
Common Lane

Severn Trent Water are proposing to carry out Utility asset works on Common Lane, Calton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Jul 2026 at 09:59.

Staffordshire County Council logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Ellastone Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ellastone Road, Winkhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Jun 2026 at 09:29.

Severn Trent Water logo
Between
30 Sep and 14 Oct 2026
Details
View Map
Share
Follow
Back Lane

Severn Trent Water are proposing to carry out Utility asset works on Back Lane, Calton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Jul 2026 at 09:35.

Staffordshire County Council logo
Between
1 and 9 Oct 2026
Details
View Map
Share
Follow
Dairy House Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dairy House Lane, Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Sep 2026 at 13:51.

Cadent Gas logo
LONG TERM
Between
5 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Shawe Park Road

Cadent Gas are proposing to carry out Utility asset works on Shawe Park Road, Kingsley Holt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2026 at 14:49.

Severn Trent Water logo
Between
19 Oct and 2 Nov 2026
Details
View Map
Share
Dale Lane

Severn Trent Water were proposing to carry out Utility asset works on Dale Lane, Calton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 2 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Sep 2026 at 08:35.

Staffordshire County Council logo
Between
26 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Ford Wetley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ford Wetley Road, Ford, Leek.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Aug 2026 at 15:48.

Staffordshire County Council logo
Between
2 and 11 Nov 2026
Details
View Map
Share
Follow
Park Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Park Lane, Ipstones.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Aug 2026 at 14:15.

Staffordshire County Council logo
Between
2 and 18 Nov 2026
Details
View Map
Share
Follow
Dog Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dog Lane, Ipstones Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Aug 2026 at 14:07.

Staffordshire County Council logo
Between
6 and 8 Nov 2026
Details
View Map
Share
Follow
Wootton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wootton Lane, Farley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2026 and could run through until 8 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Jul 2026 at 09:45.

BT logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Prince George Street

BT were proposing to carry out Utility asset works on Prince George Street, Cheadle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2026 and run through until 11 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Sep 2026 at 14:23.

Hutchinson 3G logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Three Lows

Hutchinson 3G are proposing to carry out Utility asset works on Three Lows, Oakamoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 18 Aug 2026 at 10:07.

Staffordshire County Council logo
Between
12 and 20 Nov 2026
Details
View Map
Share
Follow
Ford Wetley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ford Wetley Road, Ford, Leek.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Sep 2026 at 15:46.

Staffordshire County Council logo
Between
12 and 20 Nov 2026
Details
View Map
Share
Follow
Dairy House Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dairy House Lane, Ford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Sep 2026 at 15:26.

Hutchinson 3G logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Three Lows

Hutchinson 3G are proposing to carry out Utility asset works on Three Lows, Oakamoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 24 Aug 2026 at 12:47.

Staffordshire County Council logo
Between
20 and 23 Nov 2026
Details
View Map
Share
Follow
Onecote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Onecote Road, Bottomhouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2026 at 11:49.

BT logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Church Lane

BT are proposing to carry out Utility repair and maintenance works on Church Lane, Ipstones.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Sep 2026 at 10:41.

BT logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Church Lane

BT are proposing to carry out Utility repair and maintenance works on Church Lane, Ipstones.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Sep 2026 at 12:28.

Staffordshire County Council logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
Ford Wetley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ford Wetley Road, Ford, Leek.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Sep 2026 at 12:18.

BT logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Oak Street

BT are proposing to carry out Utility asset works on Oak Street, Cheadle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Sep 2026 at 09:22.


Roadworks Map near to Ashbourne Road, STOKE-ON-TRENT, ST10 3EZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ashbourne Road, STOKE-ON-TRENT, ST10 3EZ (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Staffordshire County Council logo
MAJOR
  
DOG LANE 
(0.4 miles)
Staffordshire County Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 14 Sep 2026 - 18 Sep 2026
0.4
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.