ROADWORKS SUMMARY
Hatfield Road, RAYLEIGH, SS6 9AR
Introduction
View current and future planned roadworks and road closures for Hatfield Road, SS6 9AR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hatfield Road, RAYLEIGH, SS6 9AR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hatfield Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
15 Apr 2025
Cadent Gas are carrying out Utility asset works on Rectory Road, Pitsea.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 11:40 and could run through until 15 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 15:56.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 10:52.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 12:14.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 11:01.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:34.
Friday
Cadent Gas are proposing to carry out Utility asset works on Harrow Road, Bowers Gifford And North Benfleet, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 17:51.
Friday
Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Ferry Road, Hullbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 14 Aug 2024 at 15:22.
21 Nov 2024 and 13 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 November 2024 and run through until 13 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:48.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:30.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:28.
Sunday
Cadent Gas were proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:54.
Tuesday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Elmwood Avenue, Hawkwell.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 December 2024 at 16:56 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Dec 2024 at 16:28.
Friday
Cadent Gas were proposing to carry out Utility asset works on Pennial Road, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:52.
Monday
Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 08:24.
Monday
Cadent Gas were proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:54.
Monday
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Carlingford Drive, Westcliff-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Oct 2024 at 11:18.
Monday
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Arterial Road, Leigh-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 30 Sep 2024 at 11:51.
16 Jan 2025
Cadent Gas are carrying out Utility asset works on Barrie Pavement, Wickford.
These works are categorised as Major.
The works started on 13 December 2024 at 14:32 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 14:36.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Old London Road, Rawreth.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 11:13 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:22.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Kenneth Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 17:12.
Tuesday
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Southsea Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 December 2024 and could run through until 24 December 2024. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 27 Sep 2024 at 13:38.
2 and 23 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 23 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:57.
2 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kenneth Road, Thundersley, Benfleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 15:23.
2 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kenneth Road, Thundersley, Benfleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 16:19.
2 and 22 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Crest Avenue, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 08:12.
2 and 5 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Elder Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 1 Nov 2024 at 09:17.
2 and 5 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Elder Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 11 Nov 2024 at 09:53.
2 Jan and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:26.
2 Jan and 30 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Wickford Town, Wickford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 16:45.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:09.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:40.
6 and 20 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:59.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:12.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:30.
6 and 20 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 16:00.
6 Jan and 4 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fourth Walk, Canvey Island.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:22.
6 Jan and 4 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fourth Walk, Canvey Island.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:48.
6 Jan and 4 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fourth Walk, Canvey Island.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:09.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kent View Road, Vange.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 10:28.
6 and 20 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Kent View Road, Vange.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:46.
6 and 11 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 17:15.
6 and 11 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Southend Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 17:14.
6 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on London Road, Wickford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:28.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Irvon Hill Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 07:00.
6 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Irvon Hill Road, Wickford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:01.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on South Mayne, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 15:26.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on South Mayne, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 15:30.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Broadmayne Roundabout, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 15:02.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Ashlyns, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 15:04.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Lincoln Road, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 12:46.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on East Mayne, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 15:14.
11 and 13 Jan 2025
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Highbank Close, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 15:34.
13 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Greenacres, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 14 Oct 2024 at 12:28.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Clavering, Vange, Basildon.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:19.
13 and 27 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Clavering, Vange, Basildon.
These works were categorised as Major.
There were no traffic signals or road closures necessary for these works and traffic would have operated on a give-and-take basis. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 10:49.
13 and 15 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Kenneth Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 09:37.
13 and 15 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Daws Heath Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 15:45.
13 and 18 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 08:55.
13 and 18 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 08:54.
13 and 18 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Southend Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 08:54.
15 and 29 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Carlingford Drive, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 16 Oct 2024 at 12:11.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Victoria Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:03.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Victoria Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 14:38.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Uplands Park Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:04.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Uplands Park Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 14:38.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hockley Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:02.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hockley Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 14:38.
20 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Waarem Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:14.
20 Jan and 17 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Waarem Avenue, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 17:24.
20 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Cherry Orchard Way, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:38.
20 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road Roundabout, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:23.
20 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:43.
20 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:35.
21 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:17.
21 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:26.
21 Jan and 2 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 16:01.
21 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:22.
21 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 10:00.
21 Jan and 2 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 16:00.
22 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Underhill Road, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 10:47.
22 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Mount Road, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 10:52.
22 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Avenue Road, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 10:50.
22 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hill Road, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 10:48.
22 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Church Road, Rawreth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 12:13.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Windsor Gardens, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Windsor Gardens, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 12:49.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Westwood Close, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Westwood Close, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 12:51.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Parkfields, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Parkfields, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 12:50.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road Access Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road Access Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 12:48.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Queensmere, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Queensmere, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 12:46.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 12:13.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 11:54.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 12:13.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:11.
27 Jan and 7 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Greenacres, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:36.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Dalwood Gardens, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:16.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Daws Heath Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:15.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Halstow Way, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 13:01.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Halstow Way, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 11:31.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Halstow Way, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 15:36.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crest Avenue, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 10:28.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crest Avenue, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 10:48.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crest Avenue, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 11:23.
27 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Gardiners Lane North, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 13:34.
27 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Nevendon Road, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 08:57.
28 and 31 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Tankerville Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 11 Sep 2024 at 14:51.
28 and 31 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Tankerville Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 13 Sep 2024 at 11:45.
28 Jan and 3 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Gardiners Lane North, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 16:17.
3 and 21 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Stafford Walk, Canvey Island.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Apr 2024 at 10:48.
3 and 6 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Middlesex Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 12 Nov 2024 at 14:59.
10 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Dec 2024 at 16:32.
10 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Scrub Lane, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 12:08.
10 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on New Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 11:14.
10 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Daws Heath Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Dec 2024 at 16:32.
10 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Dalwood Gardens, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Dec 2024 at 17:03.
10 and 17 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Kenneth Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 11:54.
10 and 17 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Bread And Cheese Hill, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 11:34.
10 and 24 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Rochford Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 11 Nov 2024 at 13:15.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on The Fremnells, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:36.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on The Fremnells, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Dec 2024 at 15:39.
11 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Canvey Road - B1014, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:52.
11 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Canvey Road - B1014, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Nov 2024 at 15:39.
11 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Ferry Road, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Nov 2024 at 15:36.
11 and 25 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Marine Parade, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 18 Nov 2024 at 12:19.
11 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on High Street, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:52.
11 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on High Street, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Nov 2024 at 15:37.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Thisselt Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:16.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Thisselt Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 11:28.
17 Feb and 10 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Thisselt Road, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 15:44.
17 Feb and 10 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Linde Road, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 15:44.
17 Feb and 17 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Ashingdon Road, Hawkwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 26 Nov 2024 at 12:18.
17 Feb and 17 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Ashingdon Road, Hawkwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 5 Dec 2024 at 15:57.
18 and 21 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Middlesex Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 25 Nov 2024 at 12:33.
19 and 22 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Runwell Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 09:23.
19 and 22 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Runwell Road, Runwell, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 09:40.
22 Feb and 3 Mar 2025
Essex County Council are proposing to carry out Works for road purposes on Pitsea Hall Lane, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 11:09.
24 and 26 Feb 2025
BT are proposing to carry out Utility asset works on Montague Street, Essex, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Dec 2024 at 12:47.
3 and 14 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Old Wickford Road, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 09:11.
3 and 14 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Old Wickford Road, South Woodham Ferrers, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 08:24.
7 and 17 Mar 2025
BT are proposing to carry out Utility asset works on Daws Heath Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 17 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 2 Dec 2024 at 15:17.
10 and 15 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 12:32.
10 and 15 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 16:15.
12 and 14 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Belton Gardens, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 13 Dec 2024 at 10:12.
Roadworks Map near to Hatfield Road, RAYLEIGH, SS6 9AR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hatfield Road, RAYLEIGH, SS6 9AR (16 Events)
(Scheduled Dates)
(miles)
(Scheduled: 5 Dec 2024 - 10 Jan 2025)
(Scheduled: 16 Dec 2024 - 10 Jan 2025)
(Scheduled: 28 Oct 2024 - 15 Jan 2025)
(Scheduled: 14 Nov 2024 - 20 Dec 2024)
(Scheduled: 4 Dec 2024 - 14 Jan 2025)