ROADWORKS SUMMARY
Church End, ROCHFORD, SS4 2DH
Introduction
View current and future planned roadworks and road closures for Church End, SS4 2DH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Church End, ROCHFORD, SS4 2DH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Church End are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
10 Feb 2025
Cadent Gas are carrying out Utility asset works on Wakering Avenue, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 January 2025 at 10:48 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Jan 2025 at 11:15.
6 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wakering Avenue, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 10:26.
6 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wakering Avenue, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:29.
Friday
Essex County Council are proposing to carry out Highway improvement works on Creeksea Lane, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 10:58.
Friday
Essex County Council are carrying out Highway improvement works on Creeksea Lane, Burnham-on-crouch.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jan 2025 at 15:11.
13 Jan and 21 Mar 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Maldon Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 29 Nov 2024 at 12:20.
13 Jan and 21 Mar 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Maldon Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Dec 2024 at 08:48.
27 Feb 2025
Cadent Gas are carrying out Utility asset works on Elm Road, Shoeburyness.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 13:08 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 13:23.
Essex County Council carried out Highway improvement works on Main Road, Hawkwell.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 18 Jan 2025 and 20 Jan 2025 and were actually completed between 18 Jan 2025 (20:00) and 20 Jan 2025 (09:51). The works impacted the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Jan 2025 at 10:06.
28 Jan 2025
Cadent Gas are carrying out Utility repair and maintenance works on Thorpe Hall Avenue, Thorpe Bay.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 January 2025 at 08:18 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 11:39.
Thursday
Essex County Council are proposing to carry out Highway improvement works on Paglesham Road, Stambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 31 Dec 2024 at 09:00.
Thursday
Essex County Council are proposing to carry out Highway improvement works on Paglesham Road, Stambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Jan 2025 at 11:27.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Hall Road Roundabout, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Dec 2024 at 09:32.
Thursday
Essex County Council are proposing to carry out Highway improvement works on Paglesham Road, Paglesham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Jan 2025 at 16:05.
Thursday
Essex County Council are proposing to carry out Highway improvement works on Paglesham Road, Paglesham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Jan 2025 at 13:05.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Dec 2024 at 09:30.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:35.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Dec 2024 at 09:23.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:43.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Cherry Orchard Way, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:38.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Cherry Orchard Way, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Dec 2024 at 09:29.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Hall Road Roundabout, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:23.
20 and 29 Jan 2025
Essex County Council were proposing to carry out Remedial works on Burnham Road, Southminster.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 09:02.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Jan 2025 at 12:46.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Jan 2025 at 12:36.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 31 Dec 2024 at 10:26.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Jan 2025 at 12:39.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Jan 2025 at 13:42.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Jan 2025 at 11:58.
27 Jan and 4 Apr 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Maldon Road, Burnham-on-crouch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 8 Jan 2025 at 09:42.
27 Jan and 10 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Thorpe Hall Avenue, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 19 Sep 2024 at 15:38.
27 and 31 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Eastwoodbury Lane And Cherry Orchard Roundabout, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 16 Jan 2025 at 15:32.
27 Jan and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 13:04.
27 Jan and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 14:46.
3 and 5 Feb 2025
Essex And Suffolk Water are proposing to carry out Remedial works on The Endway, Althorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 14 Nov 2024 at 10:19.
10 and 21 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Kings Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 14:07.
10 and 21 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Kings Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Jan 2025 at 10:44.
10 and 21 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Kings Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Jan 2025 at 08:42.
10 and 17 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 11:29.
10 and 21 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 14:14.
10 and 21 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Kings Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Dec 2024 at 10:24.
10 and 21 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Burnham Road, Southminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Jan 2025 at 08:51.
10 and 24 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Rochford Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 11 Nov 2024 at 13:15.
10 and 24 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on North Shoebury Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 11 Nov 2024 at 10:28.
10 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Goslings, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 14:56.
10 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Goslings, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:53.
13 and 27 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Stock Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 10 Dec 2024 at 10:23.
17 Feb and 17 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Ashingdon Road, Hawkwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 5 Dec 2024 at 15:57.
17 Feb and 13 Mar 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Ship Road, Burnham-on-crouch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 13 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jan 2025 at 09:13.
17 and 23 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bournemouth Park Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 16:47.
17 and 23 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bournemouth Park Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 10:49.
17 and 23 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bournemouth Park Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 13:52.
17 Feb and 17 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Ashingdon Road, Hawkwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 26 Nov 2024 at 12:18.
24 Feb and 10 Mar 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Southchurch Road, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 24 Sep 2024 at 11:27.
24 Feb and 11 Mar 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Southchurch Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 14 Oct 2024 at 13:30.
24 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Providence, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Dec 2024 at 10:40.
25 Feb and 3 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Independent Footpath From Audleys Close To Carolines Close, Southend-on-sea.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 25 February 2025 and could run through until 3 March 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Cityfibre Metro Networks on 6 Dec 2024 at 16:58.
25 Feb and 3 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Independent Footpath From Audleys Close To Carolines Close, Southend-on-sea.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 25 February 2025 and could run through until 3 March 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Dec 2024 at 11:10.
3 and 14 Mar 2025
BT are proposing to carry out Utility asset works on Manners Way Service Road East, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 24 Dec 2024 at 08:14.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wakering Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:02.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wakering Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 09:52.
3 Mar and 21 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Elm Road, Shoeburyness.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:19.
3 and 24 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Elm Road, Shoeburyness.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 24 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:01.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Blackgate Road, Shoeburyness.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 13:01.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Blackgate Road, Shoeburyness.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:23.
3 Mar and 4 Apr 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Eastern Avenue, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 14 Oct 2024 at 15:55.
4 and 6 Mar 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on North Crescent, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 2 Jan 2025 at 12:16.
5 and 7 Mar 2025
BT are proposing to carry out Utility asset works on Sycamore Grove, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Dec 2024 at 09:57.
13 Mar and 10 Apr 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Providence, Burnham-on-crouch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 March 2025 and run through until 10 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jan 2025 at 09:14.
17 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Gunners Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:14.
17 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Gunners Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 12:56.
19 and 21 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Apton Hall Road, Stambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Jan 2025 at 11:40.
19 and 21 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Apton Hall Road, Stambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Jan 2025 at 14:39.
24 and 26 Mar 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on North Crescent, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 27 Dec 2024 at 09:31.
24 Mar and 4 Apr 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Shoebury Road, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 6 Jan 2025 at 09:36.
31 Mar and 2 Apr 2025
BT are proposing to carry out Utility asset works on Marsh Road, Essex, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 17 Dec 2024 at 16:11.
31 Mar and 2 Apr 2025
BT are proposing to carry out Utility asset works on Marsh Road, Essex, Burnham-on-crouch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 23 Dec 2024 at 08:54.
7 and 11 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Ecn11001, Rochford.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the cycleway only.
This roadwork event was last updated by Essex County Council on 14 Jan 2025 at 10:38.
9 and 11 Apr 2025
BT are proposing to carry out Utility asset works on Sutton Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Jan 2025 at 12:17.
9 and 11 Apr 2025
BT are proposing to carry out Utility asset works on Sycamore Grove, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Jan 2025 at 12:18.
17 and 21 Apr 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Feeches Road, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 21 April 2025. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 9 Jan 2025 at 09:38.
17 Apr and 14 May 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Ship Road, Burnham-on-crouch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 April 2025 and run through until 14 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jan 2025 at 09:15.
Roadworks Map near to Church End, ROCHFORD, SS4 2DH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Church End, ROCHFORD, SS4 2DH (4 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.