ROADWORKS SUMMARY
St. Anns Road, SOUTHEND-ON-SEA, SS2 5AT
Introduction
View current and future planned roadworks and road closures for St. Anns Road, SS2 5AT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to St. Anns Road, SOUTHEND-ON-SEA, SS2 5AT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. Anns Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Network Rail carried out roadworks on Riviera Drive, Southend-on-sea.
These works were categorised as Major.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 17 Oct 2025 and 15 Sep 2026 and were actually completed between 17 Oct 2025 (15:00) and 15 Sep 2026 (10:00). The works impacted the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Sep 2026 at 10:00.
31 Jan 2027
Southend-on-sea Borough Council are carrying out Highway improvement works on Queensway Slip Road Nw, Southend-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 October 2025 at 09:30 and could run through until 31 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Southend-on-sea Borough Council on 4 Mar 2026 at 14:24.
31 Jan 2027
Southend-on-sea Borough Council are carrying out Highway improvement works on Queensway Slip Road Ne, Southend-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 October 2025 at 09:30 and could run through until 31 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Southend-on-sea Borough Council on 4 Mar 2026 at 14:25.
3 Feb 2027
Southend-on-sea Borough Council are carrying out Highway improvement works on Queensway, Southend-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 December 2025 at 08:00 and could run through until 3 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Southend-on-sea Borough Council on 8 Dec 2025 at 09:32.
Friday
Southend-on-sea Borough Council are carrying out Highway improvement works on Lancaster Gardens, Southend-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 June 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southend-on-sea Borough Council on 26 Aug 2026 at 10:39.
Friday
Southend-on-sea Borough Council are carrying out Highway improvement works on Tyrrel Drive, Southend-on-sea.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 June 2026 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southend-on-sea Borough Council on 26 Aug 2026 at 10:40.
29 Jan 2027
Southend-on-sea Borough Council are carrying out Highway repair and maintenance works on Bournes Green Chase, Southend-on-sea.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 July 2026 at 12:40 and could run through until 29 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southend-on-sea Borough Council on 14 Jul 2026 at 12:42.
29 Sep 2026
Cadent Gas are carrying out Utility asset works on Church Road, Barling Magna.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 10:36 and could run through until 29 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 12:45.
Friday
Cadent Gas are carrying out Utility asset works on Carpenters, Little Wakering.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:15 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 15:00.
Sunday
Cadent Gas are carrying out Utility asset works on Percy Road, Leigh-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 20 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 08:32.
25 Sep 2026
Southend-on-sea Borough Council are carrying out Highway repair and maintenance works on Prince Avenue, Westcliff-on-sea.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 10:30 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 09:33.
28 Sep 2026
Cadent Gas are carrying out Utility asset works on Rectory Avenue, Rochford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 09:47 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 09:55.
16 Nov 2026
Cadent Gas are carrying out Utility asset works on Rectory Road, Rochford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 11:15 and could run through until 16 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 12:01.
25 Sep 2026
Cadent Gas are carrying out Utility asset works on Banyard Way, Rochford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 11:10 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 12:01.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Chadwick Road, Westcliff-on-sea.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2026 at 10:45 and could run through until 16 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 09:23.
28 Sep 2026
Cadent Gas are carrying out Utility asset works on Ashingdon Road, Hawkwell.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2026 at 11:23 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 12:15.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Feeches Road, Southend-on-sea.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 10:00 and could run through until 16 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 11:09.
14 Sep and 12 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Harewood Avenue, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 12 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 15:50.
16 and 22 Sep 2026
Network Rail are proposing to carry out Works for Rail Purposes on The Ridgeway, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 22 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 9 Sep 2026 at 14:04.
16 and 22 Sep 2026
Network Rail are proposing to carry out Works for Rail Purposes on The Ridgeway, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 22 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 7 Sep 2026 at 15:53.
21 Sep and 6 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Eastbury Avenue, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Jul 2026 at 15:52.
21 Sep and 16 Oct 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Bellhouse Road, Eastwood, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 11 Sep 2026 at 11:30.
21 and 23 Sep 2026
Essex County Council are proposing to carry out Highway improvement works on Fairmead Avenue, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Jul 2026 at 19:49.
28 Sep and 2 Oct 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Leigh Hill, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 13 Jul 2026 at 14:24.
30 Sep and 2 Oct 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Oakwood Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 8 Sep 2026 at 13:54.
30 Sep and 2 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Mucking Hall Road, Barling Magna.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the verge only.
This roadwork event was last updated by Essex County Council on 11 Aug 2026 at 15:07.
12 Oct and 9 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Riviera Drive, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 13:51.
12 Oct and 2 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Ilfracombe Avenue, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 13:50.
13 and 27 Oct 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Station Road, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 09:10.
14 and 28 Oct 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Leigham Court Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 09:09.
15 and 29 Oct 2026
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Chalkwell Park Drive, Leigh-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 October 2026 and run through until 29 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 10:09.
16 and 30 Oct 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Marguerite Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 09:04.
21 Oct and 4 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Grand Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 4 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 09:03.
22 Oct and 5 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Leigh Cliff Road, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 08:48.
23 Oct and 6 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on High Cliff Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 08:52.
26 and 30 Oct 2026
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on South Street, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 4 Aug 2026 at 15:39.
26 Oct and 9 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Somerville Gardens, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 08:55.
27 Oct and 10 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Carlton Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 10 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 08:56.
28 Oct and 11 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Nelson Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2026 and could run through until 11 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 08:57.
29 Oct and 2 Nov 2026
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Oakwood Avenue, Leigh-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2026 and run through until 2 November 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 21 Aug 2026 at 14:52.
29 Oct and 12 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Woodfield Road, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2026 and could run through until 12 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 08:58.
30 Oct and 13 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Hillside Crescent, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 08:59.
2 and 16 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Woodfield Gardens, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 16 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 09:00.
2 and 4 Nov 2026
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Gusted Hall Lane, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 13 Aug 2026 at 12:52.
3 and 17 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Glen Road, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 09:01.
4 and 18 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Grand Parade, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 09:03.
5 and 19 Nov 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Grand Parade, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2026 at 09:03.
10 and 12 Nov 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Arterial Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 12 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 25 Aug 2026 at 16:31.
12 and 14 Nov 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Arterial Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2026 and could run through until 14 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 14 Sep 2026 at 16:30.
17 Nov and 4 Dec 2026
BT were proposing to carry out Utility asset works on Ashurst Avenue, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2026 and run through until 4 December 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 20 Aug 2026 at 12:14.
20 and 24 Nov 2026
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Woodcutters Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2026 at 15:45.
27 Nov and 11 Dec 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Blenheim Chase, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2026 and could run through until 11 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 26 Aug 2026 at 15:35.
30 Nov and 14 Dec 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Prittlewell Chase, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 14 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 27 Aug 2026 at 14:21.
30 Nov and 2 Dec 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Oakwood Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 25 Aug 2026 at 16:53.
1 Dec 2026 and 26 Jan 2027
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Prince Avenue, Westcliff-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2026 and could run through until 26 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 27 Aug 2026 at 14:00.
2 and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on London Road, Leigh-on-sea.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 15:30.
7 and 21 Dec 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Whitehouse Road, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 4 Sep 2026 at 13:25.
7 and 21 Dec 2026
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Lymington Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 10 Sep 2026 at 13:18.
9 and 23 Dec 2026
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Station Road, Leigh-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2026 and run through until 23 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 14 Sep 2026 at 11:19.
10 and 24 Dec 2026
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Leigham Court Drive, Leigh-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2026 and run through until 24 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 14 Sep 2026 at 11:21.
Roadworks Map near to St. Anns Road, SOUTHEND-ON-SEA, SS2 5AT
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to St. Anns Road, SOUTHEND-ON-SEA, SS2 5AT (36 Events)
(Scheduled Dates)
(miles)
(Scheduled: 31 Oct 2025 - 31 Jan 2027)
(Scheduled: 8 Dec 2025 - 3 Feb 2027)
(Scheduled: 31 Oct 2025 - 31 Jan 2027)
(Scheduled: 2 Feb 2026 - 3 Feb 2027)
(Scheduled: 8 Dec 2025 - 3 Feb 2027)
(Scheduled: 5 May 2026 - 31 Jan 2027)
Contains public sector information licensed under the Open Government Licence v3.0.