ROADWORKS SUMMARY
Helmores, BASILDON, SS15 6SA
Introduction
View current and future planned roadworks and road closures for Helmores, SS15 6SA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Helmores, BASILDON, SS15 6SA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Helmores are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
24 Mar 2025 and 28 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Brookfield Close, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 October 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 13 Feb 2025 at 08:55.
5 Oct 2026
Cadent Gas are carrying out Utility asset works on Dunstable Road, Stanford Le Hope.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:01 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 08:14.
9 Oct 2026
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Belmont Avenue, Wickford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 07:21 and could run through until 9 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 7 Sep 2026 at 07:21.
Friday
Cadent Gas are carrying out Utility asset works on Parry Close, Stanford Le Hope.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 12:49 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 13:20.
Friday
Essex County Council are proposing to carry out Highway improvement works on Dunton Road, Herongate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 May 2026 at 08:55.
Today
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Dry Street, Langdon Hills.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:41 and could run through until 16 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 7 Sep 2026 at 17:31.
Tuesday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Lower Dunton Road, Dunton, Basildon.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2026 at 07:23 and could run through until 22 September 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2026 at 16:06.
BT carried out Utility asset works on Dunton Road, Laindon.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 14 Sep 2026 and 16 Sep 2026 and were actually completed between 14 Sep 2026 (09:30) and 16 Sep 2026 (15:00). The works impacted the verge only.
This roadwork event was last updated by BT on 16 Sep 2026 at 15:02.
Today
BT are proposing to carry out Utility asset works on Dunton Road, Laindon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the verge only.
This roadwork event was last updated by BT on 26 Jun 2026 at 08:31.
BT carried out Utility asset works on Dunton Road, Little Burstead, Billericay.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 14 Sep 2026 and 16 Sep 2026 and were actually completed between 14 Sep 2026 (09:30) and 16 Sep 2026 (15:00). The works impacted the verge only.
This roadwork event was last updated by BT on 16 Sep 2026 at 15:02.
Today
BT are proposing to carry out Utility asset works on Dunton Road, Little Burstead, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the verge only.
This roadwork event was last updated by BT on 26 Jun 2026 at 08:58.
29 Sep 2026
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Middle Road, Ingrave.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 08:30 and could run through until 29 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2026 at 09:29.
29 Sep 2026
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Quilters Straight, Fryerns, Basildon.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 09:20 and could run through until 29 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 15 Sep 2026 at 10:13.
24 Sep 2026
Cadent Gas are carrying out Utility repair and maintenance works on London Road, Stanford Le Hope.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 08:59 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 10:34.
Friday
Essex County Council are proposing to carry out Highway improvement works on Amersham Avenue, Langdon Hills.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Aug 2026 at 12:17.
16 and 24 Sep 2026
Cadent Gas were proposing to carry out Utility repair and maintenance works on Rayleigh Road, Stanford Le Hope.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2026 and run through until 24 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 10:27.
21 Sep and 2 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Beambridge, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Jun 2026 at 15:23.
21 and 23 Sep 2026
Essex County Council are proposing to carry out Highway improvement works on Bridgecote Lane, Noak Bridge, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jul 2026 at 08:30.
21 and 23 Sep 2026
BT are proposing to carry out Utility repair and maintenance works on Prince Charles Avenue, Thurrock, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 27 Aug 2026 at 12:48.
21 and 23 Sep 2026
BT are proposing to carry out Utility repair and maintenance works on Prince Charles Avenue, Thurrock, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 27 Aug 2026 at 11:27.
23 and 26 Sep 2026
Essex County Council are proposing to carry out Highway improvement works on Wickford Avenue, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Sep 2026 at 10:13.
23 and 26 Sep 2026
Essex County Council are proposing to carry out Highway improvement works on Wickford Avenue, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 26 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Sep 2026 at 10:04.
23 and 25 Sep 2026
Essex County Council are proposing to carry out Highway improvement works on Codenham Straight, Kingswood, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Sep 2026 at 14:26.
23 and 25 Sep 2026
Essex County Council are proposing to carry out Highway improvement works on Waldegrave, Kingswood, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Sep 2026 at 15:16.
23 and 25 Sep 2026
Essex County Council are proposing to carry out Highway improvement works on Codenham Straight, Kingswood, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Aug 2026 at 10:06.
23 and 25 Sep 2026
Essex County Council are proposing to carry out Highway improvement works on Codenham Straight, Kingswood, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Sep 2026 at 15:45.
23 and 25 Sep 2026
Essex County Council are proposing to carry out Highway improvement works on Codenham Straight, Kingswood, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Sep 2026 at 08:55.
28 and 30 Sep 2026
Essex County Council are proposing to carry out Highway improvement works on Borwick Lane, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Sep 2026 at 15:38.
28 Sep and 3 Oct 2026
Essex County Council are proposing to carry out Remedial works on Laindon Link, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Sep 2026 at 08:33.
28 Sep and 3 Oct 2026
Essex County Council are proposing to carry out Remedial works on Laindon Link, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 9 Sep 2026 at 14:36.
1 and 5 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Edinburgh Way, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 5 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Sep 2026 at 16:53.
1 and 3 Oct 2026
Telefonica UK are proposing to carry out Utility asset works on Childerditch Lane, Little Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 3 October 2026. The works will impact the verge only.
This roadwork event was last updated by Telefonica UK on 20 Aug 2026 at 09:38.
2 and 6 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Wickford Avenue, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Sep 2026 at 15:58.
5 and 10 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Southend Arterial Road, Pipps Hill Industrial, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 10 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 9 Sep 2026 at 15:13.
5 and 9 Oct 2026
Thurrock Council are proposing to carry out Highway improvement works on Branksome Avenue, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 21 May 2026 at 09:52.
5 Oct and 11 Nov 2026
Thurrock Council are proposing to carry out Highway repair and maintenance works on The Manorway, Stanford Le Hope.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 11 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Thurrock Council on 28 Jul 2026 at 14:37.
5 Oct and 11 Nov 2026
Thurrock Council are proposing to carry out Highway repair and maintenance works on The Manorway Southend Road Link Westbound, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 11 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Thurrock Council on 28 Jul 2026 at 14:39.
12 and 23 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Aug 2026 at 11:41.
12 and 16 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Wickford Avenue, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Aug 2026 at 08:40.
12 and 23 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Sep 2026 at 08:26.
15 and 17 Oct 2026
Essex County Council are proposing to carry out Remedial works on Rayleigh Road, Hutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2026 and could run through until 17 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Sep 2026 at 15:38.
19 and 22 Oct 2026
BT are proposing to carry out Utility repair and maintenance works on Coxes Farm Road, Essex, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 28 Aug 2026 at 14:00.
19 and 23 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road Slip Road From A127 To Noak Hill Road Eastbound, Noak Bridge, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Aug 2026 at 14:53.
19 and 23 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road Slip Road From A127 To Noak Hill Road Eastbound, Noak Bridge, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 9 Sep 2026 at 13:35.
19 and 23 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road Slip Road From Noak Hill Road A127 Eastbound, Noak Bridge, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Aug 2026 at 09:24.
19 Oct and 13 Nov 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Five Bells Slip Road To Southend Road Westbound, Vange, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Sep 2026 at 12:35.
19 and 23 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road Slip Road From Noak Hill Road A127 Eastbound, Noak Bridge, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Sep 2026 at 08:54.
19 Oct and 13 Nov 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Pitsea Bypass, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Sep 2026 at 11:26.
20 Oct and 13 Nov 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Broadway Link Roundabout, Pitsea, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Sep 2026 at 16:41.
20 Oct and 13 Nov 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Broadway Link Roundabout, Pitsea, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Sep 2026 at 13:23.
21 Oct and 2 Dec 2026
Thurrock Council are proposing to carry out Highway improvement works on Corringham Road, Stanford Le Hope.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 2 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thurrock Council on 21 May 2026 at 09:16.
22 and 24 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Laindon Link, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 24 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Sep 2026 at 16:55.
22 Oct and 12 Nov 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Pitsea Bypass, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2026 and could run through until 12 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Sep 2026 at 11:48.
23 and 27 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Eastbound Slip From A128 To A127, West Horndon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 27 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 3 Sep 2026 at 13:19.
23 and 27 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road, West Horndon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Sep 2026 at 13:03.
23 and 27 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road, Dunton, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 27 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 2 Sep 2026 at 10:40.
23 and 27 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road, Pipps Hill Industrial, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Sep 2026 at 12:20.
23 and 27 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road Slip Road From West Mayne To A127 Eastbound, Dunton, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2026 and could run through until 27 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 1 Sep 2026 at 14:04.
26 and 30 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Wickford Avenue, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Sep 2026 at 11:36.
26 and 28 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Barrington Gardens, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Sep 2026 at 11:12.
26 and 28 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Barrington Gardens, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Sep 2026 at 11:15.
26 and 28 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Barrington Gardens, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Sep 2026 at 10:25.
26 and 28 Oct 2026
BT are proposing to carry out Utility asset works on Church Lane, Essex, Little Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 23 Jul 2026 at 08:56.
26 and 28 Oct 2026
Essex County Council are proposing to carry out Highway improvement works on Barrington Gardens, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Aug 2026 at 13:05.
27 and 29 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road Slip Road From West Mayne To A127 Westbound, Dunton, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Sep 2026 at 15:11.
27 and 29 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road, Pipps Hill Industrial, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 2 Sep 2026 at 10:22.
27 and 29 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road, Dunton, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 29 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 1 Sep 2026 at 14:25.
28 Oct and 3 Nov 2026
BT are proposing to carry out Utility asset works on Kennel Lane, Essex, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2026 and could run through until 3 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 6 Aug 2026 at 07:42.
29 and 31 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road, Ramsden Crays.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2026 and could run through until 31 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Sep 2026 at 09:58.
29 and 31 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road Slip Road From Noak Hill Road A127 Eastbound, Noak Bridge, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2026 and could run through until 31 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 2 Sep 2026 at 09:23.
29 and 31 Oct 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road, Pipps Hill Industrial, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2026 and could run through until 31 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 1 Sep 2026 at 14:52.
2 and 4 Nov 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road Slip Road From A132 To A127 Westbound, Cranes Industrial, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 1 Sep 2026 at 15:34.
2 and 16 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Peterborough Way, Fryerns, Basildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jul 2026 at 17:16.
2 and 4 Nov 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road, Cranes Industrial, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 1 Sep 2026 at 15:22.
2 and 4 Nov 2026
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road, Pipps Hill Industrial, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 1 Sep 2026 at 15:04.
2 and 21 Nov 2026
National Highways are proposing to carry out Works for road purposes on Fen Lane, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 21 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 10 Sep 2026 at 11:54.
2 and 4 Nov 2026
BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the verge only.
This roadwork event was last updated by BT on 28 Aug 2026 at 16:32.
4 and 6 Nov 2026
Essex County Council are proposing to carry out Highway improvement works on Dencourt Crescent, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Jul 2026 at 11:32.
9 Nov and 11 Dec 2026
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Priests Field, Ingrave.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 14 Sep 2026 at 08:52.
9 Nov and 5 Dec 2026
National Highways are proposing to carry out Works for road purposes on Stanford Road, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 5 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by National Highways on 7 Jul 2026 at 10:45.
12 and 14 Nov 2026
Thurrock Council are proposing to carry out Highway repair and maintenance works on North Hill, Horndon On The Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 16 Jul 2026 at 15:21.
16 and 24 Nov 2026
BT are proposing to carry out Utility asset works on Lion Hill, Thurrock, Fobbing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 24 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 10 Sep 2026 at 14:03.
20 Nov 2026 and 26 Mar 2027
Essex County Council are proposing to carry out Remedial works on Southend Arterial Road, Pipps Hill Industrial, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 26 March 2027. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Aug 2026 at 16:15.
20 Nov 2026 and 26 Mar 2027
Essex County Council are proposing to carry out Remedial works on Southend Arterial Road, Dunton, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 26 March 2027. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Aug 2026 at 16:14.
23 and 28 Nov 2026
National Highways were proposing to carry out Works for road purposes on Brentwood Road, Chadwell St Mary.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 November 2026 and run through until 28 November 2026. The works were due to impact the carriageway and verge.
This roadwork event was last updated by National Highways on 4 Sep 2026 at 11:13.
23 Nov and 11 Dec 2026
Essex And Suffolk Water are proposing to carry out Diversionary works on Wash Road West, Laindon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 24 Aug 2026 at 11:32.
23 Nov and 11 Dec 2026
Essex And Suffolk Water are proposing to carry out Diversionary works on Noak Hill Road, Laindon, Basildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 24 Aug 2026 at 12:15.
24 and 28 Nov 2026
Thurrock Council are proposing to carry out Highway repair and maintenance works on Rectory Road, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2026 and could run through until 28 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 7 Jul 2026 at 15:14.
25 and 27 Nov 2026
Essex County Council are proposing to carry out Highway improvement works on Basildon Drive, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Aug 2026 at 09:15.
30 Nov and 7 Dec 2026
Thurrock Council are proposing to carry out Highway repair and maintenance works on Prince Charles Avenue, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 7 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 7 Jul 2026 at 14:48.
30 Nov and 3 Dec 2026
BT are proposing to carry out Utility repair and maintenance works on Outwood Common Road, Essex, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 3 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 3 Sep 2026 at 14:44.
4 and 18 Dec 2026
Cadent Gas are proposing to carry out Utility asset works on Peterborough Way, Fryerns, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 13:00.
7 and 11 Dec 2026
Essex And Suffolk Water are proposing to carry out Diversionary works on Dunton Road, Laindon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 24 Aug 2026 at 13:08.
7 and 9 Dec 2026
National Highways are proposing to carry out Works for road purposes on Rectory Road, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 9 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 7 Jul 2026 at 10:47.
9 and 12 Dec 2026
National Highways are proposing to carry out Works for road purposes on Baker Street, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2026 and could run through until 12 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by National Highways on 7 Jul 2026 at 10:48.
14 and 16 Dec 2026
BT are proposing to carry out Utility asset works on Fen Lane, Thurrock, Bulphan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 16 December 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 9 Sep 2026 at 13:58.
14 and 18 Dec 2026
National Highways are proposing to carry out Works for road purposes on High Road, Orsett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the verge only.
This roadwork event was last updated by National Highways on 15 Sep 2026 at 11:51.
Roadworks Map near to Helmores, BASILDON, SS15 6SA
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Helmores, BASILDON, SS15 6SA (15 Events)
(Scheduled Dates)
(miles)
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
(Scheduled: 16 Sep 2026 - 24 Sep 2026)
(Scheduled: 16 Sep 2026 - 22 Sep 2026)
Contains public sector information licensed under the Open Government Licence v3.0.