ROADWORKS SUMMARY
Little Lullaway, BASILDON, SS15 5JH
Introduction
View current and future planned roadworks and road closures for Little Lullaway, SS15 5JH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Little Lullaway, BASILDON, SS15 5JH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Little Lullaway are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
15 Apr 2025
Cadent Gas are carrying out Utility asset works on Rectory Road, Pitsea.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 11:40 and could run through until 15 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 15:56.
22 Jul 2024 and 6 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 6 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 30 Jul 2024 at 12:57.
22 Jul 2024 and 14 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 14 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 4 Aug 2024 at 22:10.
4 Aug 2024 and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2024 and could run through until 9 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 24 Nov 2023 at 13:21.
5 Aug 2024 and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2024 and could run through until 9 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 20:11.
23 Aug 2024 and 6 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 August 2024 and could run through until 6 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 12 Sep 2024 at 15:36.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 10:52.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 12:14.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 11:01.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:34.
Friday
Cadent Gas are proposing to carry out Utility asset works on Harrow Road, Bowers Gifford And North Benfleet, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 17:51.
26 Sep 2024 and 14 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 14 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 13 Sep 2024 at 11:18.
14 Apr 2025
Essex County Council are carrying out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 00:00 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 08:17.
Friday
Cadent Gas were proposing to carry out Utility asset works on Outwood Common Road, Billericay Town, Billericay.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 11:51.
21 Nov 2024 and 13 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 November 2024 and run through until 13 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:48.
25 Nov 2024 and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Outwood Common Road, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:38.
25 Nov 2024 and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Outwood Common Road, Billericay Town, Billericay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:11.
12 Feb 2025
Cadent Gas are carrying out Utility asset works on Outwood Common Road, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 11:20 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:11.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:30.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:28.
Sunday
Cadent Gas were proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:54.
Friday
Cadent Gas were proposing to carry out Utility asset works on Billericay Road, Herongate.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 14:31.
Friday
Cadent Gas are proposing to carry out Utility asset works on Billericay Road, Herongate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:05.
Friday
Cadent Gas are proposing to carry out Utility asset works on Billericay Road, Herongate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 14:57.
16 Jan 2025
Cadent Gas are carrying out Utility asset works on Barrie Pavement, Wickford.
These works are categorised as Major.
The works started on 13 December 2024 at 14:32 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 14:36.
Today
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on High Road, Horndon On The Hill.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 23:58 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Dec 2024 at 07:55.
Today
BT are carrying out Utility repair and maintenance works on Hardings Elms Road, Ramsden Crays, Wickford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 12:30 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 16 Dec 2024 at 12:03.
Friday
Essex County Council are proposing to carry out Highway improvement works on Wayletts, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 14:05.
Friday
Essex County Council are proposing to carry out Highway improvement works on Wayletts, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 16 Dec 2024 at 18:12.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Coxes Farm Road, Great Burstead And South Green, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 15:48.
Friday
UK Power Networks Eastern & London are carrying out New service connection on Coxes Farm Road, Great Burstead And South Green, Billericay.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 08:44 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 08:44.
Friday
Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Oct 2024 at 16:52.
Saturday
Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 15:40.
Saturday
Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 13:44.
1 Jan and 6 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Copland Road, Stanford Le Hope.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:34.
2 and 22 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Crest Avenue, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 08:12.
2 and 5 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Elder Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 1 Nov 2024 at 09:17.
2 and 5 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Elder Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 11 Nov 2024 at 09:53.
2 Jan and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:26.
2 Jan and 30 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Wickford Town, Wickford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 16:45.
3 Jan and 7 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:26.
4 and 7 Jan 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Coxes Farm Road, Great Burstead And South Green, Billericay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 January 2025 and run through until 7 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 13:45.
6 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Scratton Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:36.
6 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Scratton Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 12:54.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Scratton Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:21.
6 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Manor Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:23.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Manor Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:44.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Manor Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:03.
6 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Brampton Close, Corringham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:21.
6 Jan and 26 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Brampton Close, Corringham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 26 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:56.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kent View Road, Vange.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 10:28.
6 and 20 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Kent View Road, Vange.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 09:46.
6 and 18 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Langdon Hills, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 15:59.
6 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on London Road, Wickford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:28.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Irvon Hill Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 07:00.
6 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Irvon Hill Road, Wickford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:01.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Kennel Lane, Great Burstead And South Green, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 11 Nov 2024 at 09:16.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Kennel Lane, Great Burstead And South Green, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 19 Nov 2024 at 12:10.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Wiggins Lane, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 16 Oct 2024 at 16:11.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Wiggins Lane, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 3 Nov 2024 at 06:58.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Wiggins Lane, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 7 Nov 2024 at 15:30.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Wiggins Lane, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 09:42.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mount View, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:39.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mount View, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 10:02.
6 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Whiteways, Billericay Town, Billericay.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:42.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Whiteways, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:42.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Whiteways, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 16:34.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on South Mayne, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 15:26.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on South Mayne, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 15:30.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Broadmayne Roundabout, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 15:02.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Ashlyns, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 15:04.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Lincoln Road, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 12:46.
8 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on East Mayne, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 15:14.
13 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Corringham Road, Stanford Le Hope.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:06.
13 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Corringham Road, Stanford Le Hope.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 12:34.
13 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Billet Lane, Stanford Le Hope.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:12.
13 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Billet Lane, Stanford Le Hope.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 12:12.
13 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Barstable Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:23.
13 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Barstable Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:41.
13 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Barstable Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 09:06.
13 and 26 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Barstable Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:57.
13 Jan and 1 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Brampton Close, Corringham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:33.
13 Jan and 1 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Brampton Close, Corringham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 11:17.
13 Jan and 1 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Brampton Close, Corringham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 16:23.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Clavering, Vange, Basildon.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:19.
13 and 27 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Clavering, Vange, Basildon.
These works were categorised as Major.
There were no traffic signals or road closures necessary for these works and traffic would have operated on a give-and-take basis. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 10:49.
13 Jan and 7 Mar 2025
Essex County Council were proposing to carry out Remedial works on Miles Gray Road, Pipps Hill Industrial, Basildon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:24.
13 Jan and 7 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Miles Gray Road, Pipps Hill Industrial, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 14:51.
13 and 15 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Wash Road, Noak Bridge, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Nov 2024 at 09:46.
13 and 15 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Wash Road, Noak Bridge, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 3 Dec 2024 at 14:21.
15 and 29 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Stanford Le Hope.
These works are categorised as Major.
The works will start on or after 15 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 12:54.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Potash Road, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 11:00.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Queens Park Avenue, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 11:08.
20 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Corringham Road, Stanford Le Hope.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:34.
20 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Corringham Road, Stanford Le Hope.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 09:06.
20 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Corringham Road, Stanford Le Hope.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:05.
20 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Billet Lane, Stanford Le Hope.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:34.
20 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Billet Lane, Stanford Le Hope.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 09:07.
20 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mackley Drive, Corringham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:48.
20 and 24 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Church Road, Bulphan.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 4 Dec 2024 at 09:49.
20 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Fairlop Gardens, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 14:06.
20 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Fairlop Gardens, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 18:54.
20 and 24 Jan 2025
Essex County Council were proposing to carry out Remedial works on Dunton Road, Dunton, Basildon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 14:00.
21 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Barstable Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:09.
21 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Barstable Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 12:07.
22 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on London Road, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 11:39.
22 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Western Road, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 10:04.
22 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Tye Common Road, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 10:12.
22 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on London Road, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 10:16.
27 Jan and 25 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lyndhurst Road, Corringham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:47.
27 Jan and 15 Feb 2025
Thurrock Council are proposing to carry out Highway improvement works on Southend Road, Corringham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 15 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 13 Dec 2024 at 09:30.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Halstow Way, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 13:01.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Halstow Way, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 11:31.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Halstow Way, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 15:36.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crest Avenue, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 10:28.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crest Avenue, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 10:48.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crest Avenue, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 11:23.
27 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Gardiners Lane North, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 13:34.
27 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Nevendon Road, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 08:57.
28 Jan and 3 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Gardiners Lane North, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 16:17.
3 and 28 Feb 2025
Thurrock Council are proposing to carry out Highway improvement works on Burgess Avenue, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 30 Oct 2024 at 09:10.
3 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gardner Avenue, Corringham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:38.
3 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gardner Avenue, Corringham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 11:18.
3 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gardner Avenue, Corringham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 13:28.
3 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gardner Avenue, Corringham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 10:06.
3 and 24 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Gardner Avenue, Corringham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 14:01.
3 and 7 Feb 2025
Essex County Council are proposing to carry out Remedial works on Dunton Road, Dunton, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Dec 2024 at 17:42.
3 and 28 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Dunton Road, Dunton, Basildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 13:14.
3 and 28 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Dunton Road, Dunton, Basildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 14:13.
3 and 28 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Dunton Road, Dunton, Basildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Dec 2024 at 16:23.
10 Feb and 26 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath Access For Bellmaine Avenue, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:48.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Great Oaks, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 10:03.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Westgate, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 10:28.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on The Gore, Ghyllgrove, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:22.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on The Gore, Ghyllgrove, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Dec 2024 at 15:39.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 10:15.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Southernhay, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 10:12.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Ghyllgrove, Ghyllgrove, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:36.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Ghyllgrove, Ghyllgrove, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Dec 2024 at 15:39.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Church Road, Vange.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:36.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Church Road, Vange.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Dec 2024 at 15:39.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Church Road, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:36.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Church Road, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Dec 2024 at 15:39.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on The Fremnells, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:36.
10 and 20 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on The Fremnells, Fryerns, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Dec 2024 at 15:39.
10 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Oak Road, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 08:03.
10 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Oak Road, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Dec 2024 at 07:54.
11 and 14 Feb 2025
Thurrock Council are proposing to carry out Highway improvement works on Southend Road, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 4 Dec 2024 at 14:04.
14 and 17 Feb 2025
Virgin Media were proposing to carry out Utility repair and maintenance works on High Road North, Laindon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 February 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 12 Nov 2024 at 14:14.
16 and 20 Feb 2025
Telefonica UK are proposing to carry out Utility asset works on Greens Farm Lane, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telefonica UK on 19 Nov 2024 at 16:58.
17 Feb and 19 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on Miles Gray Road, Pipps Hill Industrial, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 08:47.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hillway, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:51.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hillway, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:39.
19 Feb and 14 Mar 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Ashdon Way, Kingswood, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 6 Dec 2024 at 08:12.
19 and 22 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Runwell Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 09:23.
19 and 22 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Runwell Road, Runwell, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 09:40.
22 Feb and 3 Mar 2025
Essex County Council are proposing to carry out Works for road purposes on Pitsea Hall Lane, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 17 Dec 2024 at 11:09.
24 Feb and 11 Apr 2025
Thurrock Council are proposing to carry out Highway improvement works on Lampits Hill, Corringham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thurrock Council on 13 Dec 2024 at 10:24.
24 and 26 Feb 2025
BT are proposing to carry out Utility asset works on Montague Street, Essex, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Dec 2024 at 12:47.
27 Feb and 13 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Southernhay, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 09:51.
27 Feb and 13 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Nether Mayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 09:56.
27 Feb and 13 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Laindon Link, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 09:54.
27 Feb and 13 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Great Knightleys, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:36.
27 Feb and 13 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Great Knightleys, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 10:36.
27 Feb and 13 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Roundacre New Roundabout, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 09:57.
27 Feb and 13 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Roundacre, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 09:59.
3 Mar and 16 May 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath Access For Rachael Clarke Close, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:48.
3 Mar and 16 May 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath Access For Rachael Clarke Close, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 14:04.
3 Mar and 8 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Bellmaine Avenue, Corringham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 8 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:49.
3 and 5 Mar 2025
Thurrock Council were proposing to carry out Highway repair and maintenance works on Stanford Interchange To Borough Boundary At Five Bells Eastbound, Stanford Le Hope.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thurrock Council on 26 Nov 2024 at 09:22.
3 and 5 Mar 2025
BT are proposing to carry out Utility asset works on Dunton Road, Essex, Laindon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 4 Dec 2024 at 10:42.
6 and 27 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Outwood Common Road, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 12:00.
10 and 28 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Oak Road, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Dec 2024 at 16:07.
10 and 15 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 12:32.
10 and 15 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 16:15.
17 and 19 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Bells Hill Road, Fobbing, Stanford-le-hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 12 Dec 2024 at 13:17.
Roadworks Map near to Little Lullaway, BASILDON, SS15 5JH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Little Lullaway, BASILDON, SS15 5JH (39 Events)
(Scheduled Dates)
(miles)
(Scheduled: 16 Dec 2024 - 19 Dec 2024)
(Scheduled: 13 Dec 2024 - 19 Dec 2024)
(Scheduled: 17 Dec 2024 - 20 Dec 2024)
(Scheduled: 13 Dec 2024 - 19 Dec 2024)
(Scheduled: 16 Dec 2024 - 19 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.