ROADWORKS SUMMARY
Tanswell Court, BASILDON, SS13 3JW
Introduction
View current and future planned roadworks and road closures for Tanswell Court, SS13 3JW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Tanswell Court, BASILDON, SS13 3JW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tanswell Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
15 Apr 2025
Cadent Gas are carrying out Utility asset works on Rectory Road, Pitsea.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 11:40 and could run through until 15 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 15:59.
22 Jul 2024 and 6 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 6 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 30 Jul 2024 at 12:57.
22 Jul 2024 and 14 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 14 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 4 Aug 2024 at 22:10.
4 Aug 2024 and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2024 and could run through until 9 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 24 Nov 2023 at 13:21.
5 Aug 2024 and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2024 and could run through until 9 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 20:11.
23 Aug 2024 and 6 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 August 2024 and could run through until 6 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 12 Sep 2024 at 15:36.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 10:52.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 12:14.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 11:01.
2 Sep 2024 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:34.
Sunday
Cadent Gas are carrying out Utility asset works on Lekoe Road, Canvey Island.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 09:52 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 08:53.
24 Sep and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Harrow Road, Bowers Gifford And North Benfleet, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 17:51.
26 Sep 2024 and 14 Apr 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 14 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 13 Sep 2024 at 11:18.
14 Apr 2025
Essex County Council are carrying out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 00:00 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 08:17.
7 Oct and 20 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Outwood Common Road, Billericay Town, Billericay.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 11:51.
15 Dec 2024
Cadent Gas are carrying out Utility asset works on Pound Lane, Bowers Gifford And North Benfleet, Basildon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:55 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 11:20.
21 Oct and 30 Nov 2024
Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road, Rawreth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 8 Oct 2024 at 13:03.
24 Oct and 30 Nov 2024
Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road, Rawreth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Oct 2024 at 10:17.
30 Nov 2024
Essex County Council are carrying out Highway improvement works on Chelmsford Road, Rawreth.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 October 2024 at 00:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 07:50.
11 and 29 Nov 2024
Essex County Council are proposing to carry out Highway improvement works on The Ridings, Canvey Island.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 May 2024 at 13:49.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Arterial Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Sep 2024 at 16:01.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Arterial Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Oct 2024 at 13:31.
Thursday
Essex County Council are carrying out Highway improvement works on Arterial Road, Rayleigh.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 17:03 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 17:20.
Tomorrow
Essex County Council are proposing to carry out Remedial works on Southend Arterial Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Aug 2024 at 14:54.
Tomorrow
Essex County Council were proposing to carry out Remedial works on Southend Arterial Road, Thundersley, Benfleet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 23 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Aug 2024 at 17:50.
Tomorrow
Essex County Council are proposing to carry out Remedial works on Southend Arterial Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Aug 2024 at 17:50.
Tomorrow
Essex County Council were proposing to carry out Remedial works on Southend Arterial Road, Thundersley, Benfleet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 23 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Sep 2024 at 18:11.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Southend Arterial Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Sep 2024 at 15:53.
Thursday
Essex County Council are carrying out Highway improvement works on Southend Arterial Road, Thundersley, Benfleet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 17:03 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 17:20.
Today
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nevendon Road, Nevendon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 4 Oct 2024 at 14:22.
Wednesday
Essex County Council are carrying out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 00:00 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:04.
Wednesday
Essex County Council are carrying out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 00:00 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:06.
Monday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Daws Heath Road, Rayleigh.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 09:46 and could run through until 25 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 20 Nov 2024 at 12:46.
18 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 08:02.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Sep 2024 at 12:21.
Tuesday
Essex County Council are proposing to carry out Highway improvement works on High Road, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Sep 2024 at 12:09.
Monday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Daws Heath Road, Rayleigh.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 07:02 and could run through until 25 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 18 Nov 2024 at 15:53.
18 Nov and 4 Dec 2024
Essex County Council were proposing to carry out Highway improvement works on Elm Close, Rayleigh.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Aug 2024 at 14:10.
23 Dec 2024
Cadent Gas are carrying out Utility asset works on Ruskin Path, Wickford.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 19 November 2024 at 08:50 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:41.
Wednesday
Essex County Council are carrying out Remedial works on Canvey Way, South Benfleet, Benfleet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 00:00 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Nov 2024 at 08:48.
21 Nov 2024 and 13 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 November 2024 and run through until 13 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:48.
Tomorrow
Essex County Council are carrying out Highway improvement works on Southend Road, Wickford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 00:00 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 07:04.
25 Nov and 5 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Southernhay, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:13.
25 Nov and 4 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Nether Mayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:21.
25 Nov and 5 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Laindon Link, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:18.
25 Nov and 4 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Roundacre New Roundabout, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:16.
25 Nov and 4 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Roundacre, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:23.
25 Nov 2024 and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Outwood Common Road, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:38.
25 Nov 2024 and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Outwood Common Road, Billericay Town, Billericay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:11.
25 Nov and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on The Greenway, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:22.
25 Nov and 22 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:30.
25 Nov and 22 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:28.
25 Nov and 22 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:28.
25 and 29 Nov 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Brock Hill, South Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 08:46.
25 and 29 Nov 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Brock Hill, South Hanningfield, Chelmsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:34.
26 Nov and 10 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Mollands, Vange, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 11:28.
26 Nov and 10 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Mollands, Vange, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 13:58.
29 Nov and 4 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Jun 2024 at 10:41.
2 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Pennial Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:40.
2 and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 08:31.
2 and 4 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Richmond Avenue, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 09:35.
2 and 4 Dec 2024
Essex County Council were proposing to carry out Highway improvement works on Richmond Avenue, South Benfleet, Benfleet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 11:19.
2 and 4 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Oct 2024 at 15:41.
2 and 6 Dec 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nevendon Road, Nevendon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 17 Nov 2024 at 08:09.
3 and 6 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on The Gore, Ghyllgrove, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Oct 2024 at 15:05.
4 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on The Gore, Ghyllgrove, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:55.
4 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 11:45.
4 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 16:30.
4 and 7 Dec 2024
Essex County Council were proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 15:29.
4 and 7 Dec 2024
Essex County Council were proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 15:29.
4 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Radwinter Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 16:09.
4 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 16:30.
4 and 7 Dec 2024
Essex County Council were proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 15:29.
4 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 16:19.
4 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 16:04.
4 and 14 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 13:19.
4 and 14 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 12:44.
4 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Salcott Crescent, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 16:46.
4 and 14 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Salcott Crescent, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 13:19.
4 and 14 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Salcott Crescent, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 09:17.
4 and 7 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Radwinter Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 16:04.
4 and 14 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Radwinter Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 13:19.
4 and 14 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Radwinter Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:44.
8 and 11 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:51.
8 and 11 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Stadium Way, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:51.
9 and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 08:24.
9 and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 15:44.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Oct 2024 at 08:38.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Great Oaks, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Oct 2024 at 08:38.
9 and 16 Dec 2024
Essex County Council were proposing to carry out Highway improvement works on Great Oaks, Basildon Town, Basildon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Sep 2024 at 15:23.
9 and 17 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Westgate, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 Oct 2024 at 08:38.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Southernhay, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.
9 and 16 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.
9 and 11 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:34.
9 and 11 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Stadium Way, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:34.
9 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Barrie Pavement, Wickford.
These works are categorised as Major.
The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:48.
10 and 12 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Oct 2024 at 11:55.
10 and 12 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 15:26.
16 and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Wayletts, Laindon, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:48.
16 and 20 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Coxes Farm Road, Great Burstead And South Green, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 15:48.
17 and 19 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Kenneth Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 17:12.
17 and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Oct 2024 at 16:52.
17 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 15:40.
17 and 21 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 13:44.
2 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:27.
2 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kenneth Road, Thundersley, Benfleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 15:23.
2 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kenneth Road, Thundersley, Benfleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 16:19.
2 and 22 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Crest Avenue, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:31.
2 and 5 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Elder Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 1 Nov 2024 at 09:17.
2 and 5 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Elder Avenue, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 11 Nov 2024 at 09:53.
2 and 21 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Ramsden Crays, Wickford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 11:47.
2 Jan and 25 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Ramsden Crays, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 08:24.
2 Jan and 9 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:26.
2 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Wickford Town, Wickford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:21.
3 Jan and 7 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:26.
4 and 7 Jan 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Coxes Farm Road, Great Burstead And South Green, Billericay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 January 2025 and run through until 7 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 13:45.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:09.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:40.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 10:41.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:12.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:30.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 15:12.
6 Jan and 4 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fourth Walk, Canvey Island.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:22.
6 Jan and 4 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fourth Walk, Canvey Island.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:48.
6 Jan and 26 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Brampton Close, Corringham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 26 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:56.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kent View Road, Vange.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 10:28.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kent View Road, Vange.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 14:26.
6 and 18 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on High Road, Langdon Hills, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 15:59.
6 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on London Road, Wickford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:28.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Irvon Hill Road, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 07:00.
6 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Irvon Hill Road, Wickford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:01.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Kennel Lane, Great Burstead And South Green, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 11 Nov 2024 at 09:16.
6 and 10 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Kennel Lane, Great Burstead And South Green, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 19 Nov 2024 at 12:10.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mount View, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:39.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mount View, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:59.
6 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Whiteways, Billericay Town, Billericay.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:42.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Whiteways, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:42.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Whiteways, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:48.
13 Jan and 1 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Brampton Close, Corringham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 15:00.
13 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Greenacres, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 14 Oct 2024 at 12:28.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Clavering, Vange, Basildon.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:19.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Clavering, Vange, Basildon.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 11:16.
13 and 15 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Kenneth Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 09:37.
13 and 15 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Daws Heath Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 15:45.
13 Jan and 7 Mar 2025
Essex County Council were proposing to carry out Remedial works on Miles Gray Road, Pipps Hill Industrial, Basildon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:24.
13 Jan and 7 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Miles Gray Road, Pipps Hill Industrial, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 14:51.
13 and 15 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Wash Road, Noak Bridge, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Nov 2024 at 09:46.
15 and 29 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Stanford Le Hope.
These works are categorised as Major.
The works will start on or after 15 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 14:30.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Victoria Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:03.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Victoria Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 10:14.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Uplands Park Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:04.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Uplands Park Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 10:14.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hockley Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:02.
15 and 17 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hockley Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 10:14.
20 Jan and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Waarem Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:14.
20 Jan and 17 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Waarem Avenue, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 17:24.
20 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Mackley Drive, Corringham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 10:30.
20 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Fairlop Gardens, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 14:06.
20 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Fairlop Gardens, Barstable, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 18:54.
21 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:17.
21 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:26.
21 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 08:25.
21 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:22.
21 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 10:00.
21 Jan and 2 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:06.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Windsor Gardens, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Westwood Close, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Parkfields, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road Access Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.
23 and 25 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Queensmere, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.
27 Jan and 25 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lyndhurst Road, Corringham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 12:00.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:11.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Dalwood Gardens, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:16.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Daws Heath Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:15.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Halstow Way, Pitsea, Basildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 13:01.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crest Avenue, Pitsea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 10:28.
27 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Gardiners Lane North, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 13:34.
27 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Nevendon Road, Wickford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:30.
3 and 28 Feb 2025
Thurrock Council are proposing to carry out Highway improvement works on Burgess Avenue, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thurrock Council on 30 Oct 2024 at 09:10.
3 and 21 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Stafford Walk, Canvey Island.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 30 Apr 2024 at 10:48.
3 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gardner Avenue, Corringham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 16:00.
3 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gardner Avenue, Corringham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 10:06.
3 and 24 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Gardner Avenue, Corringham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 14:01.
10 Feb and 26 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath Access For Bellmaine Avenue, Stanford Le Hope.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:00.
10 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Oak Road, Ramsden Crays, Wickford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 15:59.
14 and 17 Feb 2025
Virgin Media were proposing to carry out Utility repair and maintenance works on High Road North, Laindon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 February 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 12 Nov 2024 at 14:14.
16 and 20 Feb 2025
Telefonica UK are proposing to carry out Utility asset works on Greens Farm Lane, Billericay Town, Billericay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Telefonica UK on 19 Nov 2024 at 16:58.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Thisselt Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:16.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Thisselt Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 11:28.
17 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Thisselt Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 14:59.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hillway, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:51.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hillway, Billericay Town, Billericay.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:10.
Roadworks Map near to Tanswell Court, BASILDON, SS13 3JW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Tanswell Court, BASILDON, SS13 3JW (23 Events)
(Scheduled Dates)
(miles)
(Scheduled: 12 Nov 2024 - 25 Nov 2024)
(Scheduled: 20 Nov 2024 - 26 Nov 2024)
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
(Scheduled: 20 Nov 2024 - 25 Nov 2024)
(Scheduled: 9 Apr 2024 - 15 Apr 2025)
Contains public sector information licensed under the Open Government Licence v3.0.