ROADWORKS SUMMARY
School Lane, WICKFORD, SS12 9JL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for School Lane, SS12 9JL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to School Lane, WICKFORD, SS12 9JL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for School Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Until
15 Apr 2025
Details
View Map
Share
Follow
Rectory Road

Cadent Gas are carrying out Utility asset works on Rectory Road, Pitsea.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 April 2024 at 11:40 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 15:59.

Cadent Gas logo
LONG TERM
Between
4 Aug 2024 and 9 Mar 2025
Details
View Map
Share
Follow
Crays Hill

Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2024 and could run through until 9 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 24 Nov 2023 at 13:21.

Cadent Gas logo
LONG TERM
Between
5 Aug 2024 and 9 Mar 2025
Details
View Map
Share
Follow
Crays Hill

Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 9 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 20:11.

Cadent Gas logo
LONG TERM
Between
2 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Pound Lane

Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 10:52.

Cadent Gas logo
LONG TERM
Between
2 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Pound Lane

Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 12:14.

Cadent Gas logo
LONG TERM
Between
2 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Pound Lane

Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 11:01.

Cadent Gas logo
LONG TERM
Between
2 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Pound Lane

Cadent Gas are proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:34.

Cadent Gas logo
LONG TERM
Between
24 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Harrow Road

Cadent Gas are proposing to carry out Utility asset works on Harrow Road, Bowers Gifford And North Benfleet, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 17:51.

Cadent Gas logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Pound Lane

Cadent Gas are carrying out Utility asset works on Pound Lane, Bowers Gifford And North Benfleet, Basildon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:55 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 11:20.

Essex County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Chelmsford Road

Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road, Rawreth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex County Council on 8 Oct 2024 at 13:03.

Essex County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Chelmsford Road

Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road, Rawreth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Essex County Council on 17 Oct 2024 at 10:17.

LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Ferry Road

Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Ferry Road, Hullbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 14 Aug 2024 at 15:22.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
The Ridings

Essex County Council are proposing to carry out Highway improvement works on The Ridings, Canvey Island.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 May 2024 at 13:49.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Arterial Road

Essex County Council are carrying out Highway improvement works on Arterial Road, Rayleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 17:03 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 17:20.

Essex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Southend Arterial Road

Essex County Council are carrying out Highway improvement works on Southend Arterial Road, Thundersley, Benfleet.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 17:03 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 17:20.

Cadent Gas logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Rayleigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 13:48.

Cadent Gas logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Grove Road

Cadent Gas are proposing to carry out Utility asset works on Grove Road, Rayleigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:13.

Cadent Gas logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Grove Road

Cadent Gas are carrying out Utility asset works on Grove Road, Rayleigh.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 11:08 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 07:49.

Cadent Gas logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Dorothy Farm Road

Cadent Gas are proposing to carry out Utility asset works on Dorothy Farm Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 09:50.

Cadent Gas logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Dorothy Farm Road

Cadent Gas are proposing to carry out Utility asset works on Dorothy Farm Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 15:03.

Cadent Gas logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Dorothy Farm Road

Cadent Gas are carrying out Utility asset works on Dorothy Farm Road, Rayleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 11:09 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 07:51.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Fairlop Avenue

Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 08:02.

Essex County Council logo
Between
18 Nov and 4 Dec 2024
Details
View Map
Share
Elm Close

Essex County Council were proposing to carry out Highway improvement works on Elm Close, Rayleigh.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 Aug 2024 at 14:10.

Cadent Gas logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Ruskin Path

Cadent Gas are carrying out Utility asset works on Ruskin Path, Wickford.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 19 November 2024 at 08:50 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:41.

Finishing
Tuesday
Details
View Map
Share
Follow
Chapmans Walk

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Chapmans Walk, Leigh-on-sea.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 09:37 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 25 Nov 2024 at 15:45.

Cadent Gas logo
LONG TERM
Between
21 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Pound Lane

Cadent Gas were proposing to carry out Utility asset works on Pound Lane, North Benfleet, Basildon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2024 and run through until 13 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:48.

Essex County Council logo
Between
25 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Southernhay

Essex County Council are proposing to carry out Highway improvement works on Southernhay, Basildon Town, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:13.

Essex County Council logo
Between
25 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Nether Mayne

Essex County Council are proposing to carry out Highway improvement works on Nether Mayne, Basildon Town, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:21.

Essex County Council logo
Between
25 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Laindon Link

Essex County Council are proposing to carry out Highway improvement works on Laindon Link, Laindon, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:18.

Essex County Council logo
Between
25 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Roundacre New Roundabout

Essex County Council are proposing to carry out Highway improvement works on Roundacre New Roundabout, Basildon Town, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:16.

Essex County Council logo
Between
25 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Roundacre

Essex County Council are proposing to carry out Highway improvement works on Roundacre, Basildon Town, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:23.

Cadent Gas logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
The Greenway

Cadent Gas are proposing to carry out Utility asset works on The Greenway, Runwell, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:22.

Cadent Gas logo
Between
25 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Brock Hill

Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:30.

Cadent Gas logo
Between
25 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Brock Hill

Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:28.

Cadent Gas logo
Between
25 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Brock Hill

Cadent Gas are proposing to carry out Utility asset works on Brock Hill, Runwell, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 14:34.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Brock Hill

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Brock Hill, South Hanningfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 08:46.

Until
5 Dec 2024
Details
View Map
Share
Follow
Avondale Road

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Avondale Road, South Benfleet, Benfleet.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 10:21 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 16:41.

Cadent Gas logo
Between
26 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Mollands

Cadent Gas are proposing to carry out Utility asset works on Mollands, Vange, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 11:28.

Cadent Gas logo
Between
26 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Mollands

Cadent Gas are proposing to carry out Utility asset works on Mollands, Vange, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 13:58.

Essex County Council logo
Between
29 Nov and 4 Dec 2024
Details
View Map
Share
Follow
London Road Roundabout

Essex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Jun 2024 at 10:41.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Pennial Road

Cadent Gas are proposing to carry out Utility asset works on Pennial Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:40.

Cadent Gas logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Thelma Avenue

Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 08:31.

Essex County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Richmond Avenue

Essex County Council are proposing to carry out Highway improvement works on Richmond Avenue, South Benfleet, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 09:35.

Essex County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Richmond Avenue

Essex County Council were proposing to carry out Highway improvement works on Richmond Avenue, South Benfleet, Benfleet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 11:19.

Essex County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Church Road

Essex County Council are proposing to carry out Highway improvement works on Church Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Oct 2024 at 15:41.

Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Nevendon Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nevendon Road, Nevendon, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:56.

Essex County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
The Gore

Essex County Council are proposing to carry out Highway improvement works on The Gore, Ghyllgrove, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Oct 2024 at 15:05.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
The Gore

Essex County Council are proposing to carry out Highway improvement works on The Gore, Ghyllgrove, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:55.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Cranfield Park Road

Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 11:45.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Cranfield Park Road

Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 16:30.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Cranfield Park Road

Essex County Council were proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 15:29.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Cranfield Park Road

Essex County Council were proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 15:29.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Radwinter Avenue

Essex County Council are proposing to carry out Highway improvement works on Radwinter Avenue, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 16:09.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Cranfield Park Road

Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 16:30.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Cranfield Park Road

Essex County Council were proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Oct 2024 at 15:29.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Cranfield Park Road

Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Oct 2024 at 16:19.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Cranfield Park Road

Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 16:04.

Essex County Council logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Cranfield Park Road

Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 13:19.

Essex County Council logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Cranfield Park Road

Essex County Council are proposing to carry out Highway improvement works on Cranfield Park Road, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 12:44.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Salcott Crescent

Essex County Council are proposing to carry out Highway improvement works on Salcott Crescent, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 16:46.

Essex County Council logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Salcott Crescent

Essex County Council are proposing to carry out Highway improvement works on Salcott Crescent, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 13:19.

Essex County Council logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Salcott Crescent

Essex County Council are proposing to carry out Highway improvement works on Salcott Crescent, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 09:17.

Essex County Council logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Radwinter Avenue

Essex County Council are proposing to carry out Highway improvement works on Radwinter Avenue, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 16:04.

Essex County Council logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Radwinter Avenue

Essex County Council are proposing to carry out Highway improvement works on Radwinter Avenue, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 13:19.

Essex County Council logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Radwinter Avenue

Essex County Council are proposing to carry out Highway improvement works on Radwinter Avenue, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:44.

Essex County Council logo
Between
8 and 15 Dec 2024
Details
View Map
Share
Follow
Rayleigh Road

Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:09.

Essex County Council logo
Between
8 and 15 Dec 2024
Details
View Map
Share
Follow
Stadium Way

Essex County Council are proposing to carry out Highway improvement works on Stadium Way, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:09.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Thelma Avenue

Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 08:24.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Thelma Avenue

Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 15:44.

Southend-on-sea Borough Council logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Arterial Road

Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Arterial Road, Leigh-on-sea.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southend-on-sea Borough Council on 30 Sep 2024 at 11:51.

Essex County Council logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Broadmayne

Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Oct 2024 at 08:38.

Essex County Council logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Great Oaks

Essex County Council are proposing to carry out Highway improvement works on Great Oaks, Basildon Town, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Oct 2024 at 08:38.

Essex County Council logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Great Oaks

Essex County Council were proposing to carry out Highway improvement works on Great Oaks, Basildon Town, Basildon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Sep 2024 at 15:23.

Essex County Council logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Westgate

Essex County Council are proposing to carry out Highway improvement works on Westgate, Basildon Town, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 23 Oct 2024 at 08:38.

Essex County Council logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Broadmayne

Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.

Essex County Council logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Broadmayne

Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.

Essex County Council logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Southernhay

Essex County Council are proposing to carry out Highway improvement works on Southernhay, Basildon Town, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.

Essex County Council logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Broadmayne

Essex County Council are proposing to carry out Highway improvement works on Broadmayne, Basildon Town, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Oct 2024 at 13:05.

Essex County Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Rayleigh Road

Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:34.

Essex County Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Stadium Way

Essex County Council are proposing to carry out Highway improvement works on Stadium Way, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:34.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Barrie Pavement

Cadent Gas are proposing to carry out Utility asset works on Barrie Pavement, Wickford.

These works are categorised as Major.

The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:48.

Essex County Council logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Church Road

Essex County Council are proposing to carry out Highway improvement works on Church Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 16 Oct 2024 at 11:55.

Essex County Council logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Church Road

Essex County Council are proposing to carry out Highway improvement works on Church Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 15:26.

UK Power Networks Eastern & London logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Coxes Farm Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Coxes Farm Road, Great Burstead And South Green, Billericay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 15:48.

Essex County Council logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Kenneth Road

Essex County Council are proposing to carry out Highway improvement works on Kenneth Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 17:12.

Essex County Council logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Long Riding

Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Oct 2024 at 16:52.

Essex County Council logo
Between
17 and 21 Dec 2024
Details
View Map
Share
Follow
Long Riding

Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 15:40.

Essex County Council logo
Between
17 and 21 Dec 2024
Details
View Map
Share
Follow
Long Riding

Essex County Council are proposing to carry out Highway improvement works on Long Riding, Barstable, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 13:44.

Cadent Gas logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Fairlop Avenue

Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:27.

Cadent Gas logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Kenneth Road

Cadent Gas are proposing to carry out Utility asset works on Kenneth Road, Thundersley, Benfleet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 15:23.

Cadent Gas logo
Between
2 and 23 Jan 2025
Details
View Map
Share
Follow
Kenneth Road

Cadent Gas are proposing to carry out Utility asset works on Kenneth Road, Thundersley, Benfleet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 16:19.

Cadent Gas logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Crest Avenue

Cadent Gas are proposing to carry out Utility asset works on Crest Avenue, Pitsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:31.

Between
2 and 5 Jan 2025
Details
View Map
Share
Follow
Elder Avenue

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Elder Avenue, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 1 Nov 2024 at 09:17.

Between
2 and 5 Jan 2025
Details
View Map
Share
Follow
Elder Avenue

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Elder Avenue, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Essex And Suffolk Water on 11 Nov 2024 at 09:53.

Cadent Gas logo
Between
2 and 21 Jan 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Ramsden Crays, Wickford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 11:47.

Cadent Gas logo
LONG TERM
Between
2 Jan and 9 Mar 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:26.

Cadent Gas logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Wickford Town, Wickford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:21.

Cadent Gas logo
LONG TERM
Between
3 Jan and 7 Aug 2025
Details
View Map
Share
Follow
Crays Hill

Cadent Gas are proposing to carry out Utility asset works on Crays Hill, Ramsden Crays, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:26.

UK Power Networks Eastern & London logo
Between
4 and 7 Jan 2025
Details
View Map
Share
Coxes Farm Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Coxes Farm Road, Great Burstead And South Green, Billericay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 January 2025 and run through until 7 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 13:45.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Thelma Avenue

Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:09.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Thelma Avenue

Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:40.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Thelma Avenue

Cadent Gas are proposing to carry out Utility asset works on Thelma Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 10:41.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Lionel Road

Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:12.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Lionel Road

Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:30.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Lionel Road

Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 15:12.

Cadent Gas logo
Between
6 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Fourth Walk

Cadent Gas are proposing to carry out Utility asset works on Fourth Walk, Canvey Island.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:22.

Cadent Gas logo
Between
6 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Fourth Walk

Cadent Gas are proposing to carry out Utility asset works on Fourth Walk, Canvey Island.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:48.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Kent View Road

Cadent Gas are proposing to carry out Utility asset works on Kent View Road, Vange.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 10:28.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Kent View Road

Cadent Gas are proposing to carry out Utility asset works on Kent View Road, Vange.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 14:26.

Essex County Council logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Southend Road

Essex County Council are proposing to carry out Highway improvement works on Southend Road, Hockley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 17:14.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
London Road

Cadent Gas were proposing to carry out Utility asset works on London Road, Wickford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:28.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Irvon Hill Road

Cadent Gas are proposing to carry out Utility asset works on Irvon Hill Road, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 07:00.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Irvon Hill Road

Cadent Gas were proposing to carry out Utility asset works on Irvon Hill Road, Wickford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:01.

Essex County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
South Mayne

Essex County Council are proposing to carry out Highway improvement works on South Mayne, Pitsea, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:38.

Essex County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
South Mayne

Essex County Council are proposing to carry out Highway improvement works on South Mayne, Barstable, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:38.

Essex County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Broadmayne Roundabout

Essex County Council are proposing to carry out Highway improvement works on Broadmayne Roundabout, Fryerns, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:27.

Essex County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Ashlyns

Essex County Council are proposing to carry out Highway improvement works on Ashlyns, Pitsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:38.

Essex County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
East Mayne

Essex County Council are proposing to carry out Highway improvement works on East Mayne, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:38.

Essex County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Greenacres

Essex County Council are proposing to carry out Highway improvement works on Greenacres, Hadleigh, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 14 Oct 2024 at 12:28.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Clavering

Cadent Gas are proposing to carry out Utility asset works on Clavering, Vange, Basildon.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:19.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Clavering

Cadent Gas are proposing to carry out Utility asset works on Clavering, Vange, Basildon.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 11:16.

Essex County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Kenneth Road

Essex County Council are proposing to carry out Highway improvement works on Kenneth Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 09:37.

Essex County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Daws Heath Road

Essex County Council are proposing to carry out Highway improvement works on Daws Heath Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 15:45.

Essex County Council logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Miles Gray Road

Essex County Council were proposing to carry out Remedial works on Miles Gray Road, Pipps Hill Industrial, Basildon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 13:24.

Essex County Council logo
LONG TERM
Between
13 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Miles Gray Road

Essex County Council are proposing to carry out Highway improvement works on Miles Gray Road, Pipps Hill Industrial, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 14:51.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Wash Road

Virgin Media are proposing to carry out Utility asset works on Wash Road, Noak Bridge, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Nov 2024 at 09:46.

Essex County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Main Road

Essex County Council are proposing to carry out Highway improvement works on Main Road, Hawkwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 08:54.

Essex County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Southend Road

Essex County Council are proposing to carry out Highway improvement works on Southend Road, Hockley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 08:54.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Essex County Council are proposing to carry out Highway improvement works on Victoria Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:03.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Essex County Council are proposing to carry out Highway improvement works on Victoria Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 14:38.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Uplands Park Road

Essex County Council are proposing to carry out Highway improvement works on Uplands Park Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:04.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Uplands Park Road

Essex County Council are proposing to carry out Highway improvement works on Uplands Park Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 14:38.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Hockley Road

Essex County Council are proposing to carry out Highway improvement works on Hockley Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 09:02.

Essex County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Hockley Road

Essex County Council are proposing to carry out Highway improvement works on Hockley Road, Rayleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 14:38.

Cadent Gas logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Waarem Avenue

Cadent Gas are proposing to carry out Utility asset works on Waarem Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:14.

Cadent Gas logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Waarem Avenue

Cadent Gas were proposing to carry out Utility asset works on Waarem Avenue, Canvey Island.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 17:24.

Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Fairlop Gardens

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Fairlop Gardens, Barstable, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 14:06.

Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Fairlop Gardens

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Fairlop Gardens, Barstable, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 21 Nov 2024 at 18:54.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Lionel Road

Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:17.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Lionel Road

Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:26.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Lionel Road

Cadent Gas are proposing to carry out Utility asset works on Lionel Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 08:25.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Fairlop Avenue

Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:22.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Fairlop Avenue

Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 10:00.

Cadent Gas logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Fairlop Avenue

Cadent Gas are proposing to carry out Utility asset works on Fairlop Avenue, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:06.

Essex County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Underhill Road

Essex County Council are proposing to carry out Highway improvement works on Underhill Road, South Benfleet, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 11:14.

Essex County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Mount Road

Essex County Council are proposing to carry out Highway improvement works on Mount Road, South Benfleet, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 11:14.

Essex County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Avenue Road

Essex County Council are proposing to carry out Highway improvement works on Avenue Road, South Benfleet, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 11:14.

Essex County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Hill Road

Essex County Council are proposing to carry out Highway improvement works on Hill Road, South Benfleet, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 11:14.

Essex County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Windsor Gardens

Essex County Council are proposing to carry out Highway improvement works on Windsor Gardens, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.

Essex County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Windsor Gardens

Essex County Council are proposing to carry out Highway improvement works on Windsor Gardens, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 15:01.

Essex County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Westwood Close

Essex County Council are proposing to carry out Highway improvement works on Westwood Close, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.

Essex County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Westwood Close

Essex County Council are proposing to carry out Highway improvement works on Westwood Close, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 15:01.

Essex County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Parkfields

Essex County Council are proposing to carry out Highway improvement works on Parkfields, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.

Essex County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Parkfields

Essex County Council are proposing to carry out Highway improvement works on Parkfields, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:48.

Essex County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Rayleigh Road Access Road

Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road Access Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.

Essex County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Rayleigh Road Access Road

Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road Access Road, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 15:01.

Essex County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Queensmere

Essex County Council are proposing to carry out Highway improvement works on Queensmere, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 10:43.

Essex County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Queensmere

Essex County Council are proposing to carry out Highway improvement works on Queensmere, Thundersley, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 14:48.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Rectory Road

Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Hadleigh, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:11.

Essex County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Greenacres

Essex County Council are proposing to carry out Highway improvement works on Greenacres, Hadleigh, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:36.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Dalwood Gardens

Essex County Council are proposing to carry out Highway improvement works on Dalwood Gardens, Hadleigh, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:16.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Daws Heath Road

Essex County Council are proposing to carry out Highway improvement works on Daws Heath Road, Hadleigh, Benfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:15.

Essex County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Halstow Way

Essex County Council are proposing to carry out Highway improvement works on Halstow Way, Pitsea, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 13:01.

Essex County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Crest Avenue

Essex County Council are proposing to carry out Highway improvement works on Crest Avenue, Pitsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 10:28.

UK Power Networks Eastern & London logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Gardiners Lane North

UK Power Networks Eastern & London are proposing to carry out New service connection on Gardiners Lane North, Ramsden Crays, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 13:34.

Cadent Gas logo
LONG TERM
Between
27 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Nevendon Road

Cadent Gas are proposing to carry out Utility asset works on Nevendon Road, Wickford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:30.

UK Power Networks Eastern & London logo
Between
28 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Gardiners Lane North

UK Power Networks Eastern & London are proposing to carry out New service connection on Gardiners Lane North, Ramsden Crays, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 09:07.

Essex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Stafford Walk

Essex County Council are proposing to carry out Highway improvement works on Stafford Walk, Canvey Island.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Apr 2024 at 10:48.

UK Power Networks Eastern & London logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Oak Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Oak Road, Ramsden Crays, Wickford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 15:59.

Southend-on-sea Borough Council logo
Between
11 and 25 Feb 2025
Details
View Map
Share
Follow
Marine Parade

Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Marine Parade, Leigh-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southend-on-sea Borough Council on 18 Nov 2024 at 12:19.

Essex County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Middlemead

Essex County Council are proposing to carry out Highway improvement works on Middlemead, South Hanningfield, Chelmsford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:18.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Thisselt Road

Cadent Gas are proposing to carry out Utility asset works on Thisselt Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:16.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Thisselt Road

Cadent Gas are proposing to carry out Utility asset works on Thisselt Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 11:28.

Cadent Gas logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Thisselt Road

Cadent Gas are proposing to carry out Utility asset works on Thisselt Road, Canvey Island.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 14:59.

BT logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Montague Street

BT are proposing to carry out Utility asset works on Montague Street, Essex, Basildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Nov 2024 at 11:39.


Roadworks Map near to School Lane, WICKFORD, SS12 9JL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to School Lane, WICKFORD, SS12 9JL (21 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
HARROW ROAD, BOWERS GIFFORD AND NORTH BENFLEET 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Complete
7 Oct 2024 07:00 - 25 Oct 2024 11:50
0.3
Details
Share
2
Cadent Gas logo
MAJOR
  
HARROW ROAD, BOWERS GIFFORD AND NORTH BENFLEET 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 24 Sep 2024 - 20 Dec 2024
0.3
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
POUND LANE, NORTH BENFLEET 
(0.4 miles)
Cadent Gas
Utility asset works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 21 Nov 2024 - 13 Jan 2025)
0.4
Details
Share
4
Cadent Gas logo
POUND LANE, NORTH BENFLEET 
(0.4 miles)
Cadent Gas
Remedial works - Carriageway - Two-way signals
Cancelled
(Scheduled: 25 Nov 2024 - 29 Nov 2024)
0.4
Details
Share
5
Cadent Gas logo
MAJOR
  
NORTH BENFLEET HALL ROAD, BOWERS GIFFORD AND NORTH BENFLEET 
(0.5 miles)
Cadent Gas
Utility asset works - Footway - Multi-way signals
Cancelled
(Scheduled: 21 Nov 2024 - 19 Dec 2024)
0.5
Details
Share
6
Cadent Gas logo
MAJOR
  
POUND LANE, NORTH BENFLEET 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 2 Sep 2024 - 31 Jan 2025
0.5
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
POUND LANE, NORTH BENFLEET 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 2 Sep 2024 - 31 Jan 2025
0.5
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
POUND LANE, NORTH BENFLEET 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 2 Sep 2024 - 31 Jan 2025
0.5
Details
Share
Follow
9
Cadent Gas logo
MAJOR
  
POUND LANE, NORTH BENFLEET 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 2 Sep 2024 - 31 Jan 2025
0.5
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
POUND LANE, NORTH BENFLEET 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Complete
9 Sep 2024 07:49 - 25 Oct 2024 11:56
0.5
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.