ROADWORKS SUMMARY
The Ridgeway, WESTCLIFF-ON-SEA, SS0 8PX
Introduction

View current and future planned roadworks and road closures for The Ridgeway, SS0 8PX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to The Ridgeway, WESTCLIFF-ON-SEA, SS0 8PX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Ridgeway are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
16 Jan 2026
Cadent Gas are carrying out Utility asset works on Aldermans Hill, Hockley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 07:26 and could run through until 16 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 08:04.
23 Jun 2025 and 20 Dec 2026
Southend-on-sea Borough Council are proposing to carry out Highway improvement works on Queensway, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 20 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southend-on-sea Borough Council on 18 Jun 2025 at 10:07.
3 Oct 2025
Cadent Gas are carrying out Utility asset works on The Fairway, Leigh-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 08:42 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 21 Jul 2025 at 09:20.
26 Sep 2025
Southend-on-sea Borough Council are carrying out Highway repair and maintenance works on London Road, Southend-on-sea.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 10:21 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 12 Sep 2025 at 13:52.
11 Aug and 8 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Southend Road, Hockley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 14:34.
8 Nov 2025
Cadent Gas are carrying out Utility asset works on Southend Road, Hockley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 05:14 and could run through until 8 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Aug 2025 at 08:07.
22 Jan 2026
Southend-on-sea Borough Council are carrying out Highway repair and maintenance works on Hampton Gardens, Southend-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2025 at 12:02 and could run through until 22 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 4 Sep 2025 at 13:01.
22 Jan 2026
Southend-on-sea Borough Council are carrying out Highway repair and maintenance works on Byrne Drive, Southend-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2025 at 12:02 and could run through until 22 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 4 Sep 2025 at 13:03.
22 Jan 2026
Southend-on-sea Borough Council are carrying out Highway repair and maintenance works on Thornford Gardens, Southend-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2025 at 12:02 and could run through until 22 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 4 Sep 2025 at 13:02.
22 Jan 2026
Southend-on-sea Borough Council are carrying out Highway repair and maintenance works on Alton Gardens, Southend-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2025 at 12:02 and could run through until 22 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 4 Sep 2025 at 13:03.
6 Sep 2025 and 20 Aug 2026
Network Rail were proposing to carry out roadworks on Riviera Drive, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 September 2025 and run through until 20 August 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Aug 2025 at 10:27.
8 and 27 Sep 2025
Essex County Council were proposing to carry out Highway improvement works on Meppel Avenue, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Aug 2025 at 14:03.
8 and 27 Sep 2025
Essex County Council were proposing to carry out Highway improvement works on Somnes Avenue, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Aug 2025 at 14:03.
8 Sep 2025 and 20 Dec 2026
Southend-on-sea Borough Council are proposing to carry out Highway improvement works on Queensway, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 20 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southend-on-sea Borough Council on 25 Jun 2025 at 11:12.
8 Sep 2025 and 20 Dec 2026
Southend-on-sea Borough Council are proposing to carry out Highway improvement works on Southchurch Road, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 20 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southend-on-sea Borough Council on 25 Jun 2025 at 12:44.
8 Sep 2025 and 20 Dec 2026
Southend-on-sea Borough Council are proposing to carry out Highway improvement works on Sutton Road, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 20 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southend-on-sea Borough Council on 25 Jun 2025 at 12:42.
8 Sep and 22 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Main Road, Hawkwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 14:37.
Tuesday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Marcos Road, Canvey Island.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2025 at 08:36 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 15 Sep 2025 at 18:29.
15 and 18 Sep 2025
Essex County Council are proposing to carry out Highway improvement works on Oak Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Jul 2025 at 08:17.
3 Oct 2025
Essex County Council are carrying out Highway improvement works on Point Road, Canvey Island.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 00:00 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Sep 2025 at 08:10.
3 Oct 2025
Essex County Council are carrying out Highway improvement works on High Street, Canvey Island.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 00:00 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 17 Sep 2025 at 08:10.
Anglian Water carried out Utility repair and maintenance works on Tunbridge Road, Southend-on-sea.
The road was closed for some or all of the period.
The works were originally planned between 17 Sep 2025 and 19 Sep 2025 and were actually completed between 17 Sep 2025 (13:27) and 18 Sep 2025 (14:45). The works impacted the carriageway only.
This roadwork event was last updated by Anglian Water on 18 Sep 2025 at 14:45.
18 and 27 Sep 2025
Essex County Council are proposing to carry out Highway improvement works on Point Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jun 2025 at 09:12.
18 and 27 Sep 2025
Essex County Council are proposing to carry out Highway improvement works on High Street, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Jun 2025 at 09:42.
3 Oct 2025
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Newington Avenue, Southend-on-sea.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2025 at 03:31 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 18 Sep 2025 at 08:37.
19 and 27 Sep 2025
Essex County Council are proposing to carry out Highway repair and maintenance works on Southend Arterial Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Aug 2025 at 15:45.
22 Sep and 6 Oct 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Southchurch Road, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 6 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 12 Jun 2025 at 15:11.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Church Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Jul 2025 at 11:01.
Wednesday
Essex County Council are proposing to carry out Highway improvement works on Church Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Sep 2025 at 14:43.
22 Sep and 20 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Great Eastern Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jul 2025 at 09:04.
22 Sep and 20 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Great Eastern Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jul 2025 at 09:40.
24 and 26 Sep 2025
Essex County Council are proposing to carry out Highway improvement works on Seaview Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Sep 2025 at 22:48.
24 and 26 Sep 2025
Essex County Council are proposing to carry out Highway improvement works on Sheldon Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Sep 2025 at 10:23.
26 Sep and 6 Oct 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Warrior Square, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 5 Sep 2025 at 12:29.
26 Sep and 6 Oct 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Warrior Square North, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 5 Sep 2025 at 11:40.
26 Sep and 6 Oct 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Warrior Square East, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 5 Sep 2025 at 11:41.
27 and 30 Sep 2025
Network Rail were proposing to carry out Works for Rail Purposes on The Ridgeway, Westcliff-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 September 2025 and run through until 30 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Apr 2025 at 10:19.
29 Sep and 3 Oct 2025
Cadent Gas are proposing to carry out New service connection on Meadway, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 08:58.
29 Sep and 3 Oct 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Meadway, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2025 at 16:04.
29 Sep and 3 Oct 2025
Cadent Gas are proposing to carry out New service connection on Meadway, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 18:12.
29 Sep and 27 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Fermoy Road, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 11:14.
29 Sep and 27 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Fermoy Road, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 11:37.
29 Sep and 20 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Daines Way, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 11:09.
29 Sep and 20 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Daines Way, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 10:55.
29 Sep and 4 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Barnstaple Road, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 11:02.
29 Sep and 4 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Barnstaple Road, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 10:36.
29 Sep and 3 Oct 2025
Essex And Suffolk Water are proposing to carry out New service connection on St Marys Drive, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 25 Jul 2025 at 09:09.
29 Sep and 3 Oct 2025
Essex And Suffolk Water are proposing to carry out New service connection on St Marys Drive, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 31 Jul 2025 at 09:12.
29 Sep and 10 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Bramble Road, Hadleigh, Benfleet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 25 Jun 2025 at 11:31.
29 Sep and 10 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on St Michaels Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 25 Jun 2025 at 11:43.
29 Sep and 12 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Main Road, Hawkwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2025 at 09:09.
30 Sep and 2 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Daws Heath Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the verge only.
This roadwork event was last updated by Essex And Suffolk Water on 23 Jul 2025 at 08:53.
30 Sep and 2 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Daws Heath Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the verge only.
This roadwork event was last updated by Essex And Suffolk Water on 1 Aug 2025 at 13:52.
30 Sep and 2 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Daws Heath Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the verge only.
This roadwork event was last updated by Essex And Suffolk Water on 6 Aug 2025 at 10:44.
6 and 27 Oct 2025
Essex County Council are proposing to carry out Highway improvement works on Long Road, Canvey Island.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Aug 2025 at 13:37.
6 and 31 Oct 2025
Network Rail were proposing to carry out roadworks on Riviera Drive, Southend-on-sea.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Aug 2025 at 14:48.
6 and 31 Oct 2025
Network Rail are proposing to carry out roadworks on Riviera Drive, Southend-on-sea.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Aug 2025 at 15:53.
6 and 10 Oct 2025
Essex And Suffolk Water are proposing to carry out New service connection on Gainsborough Drive, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 17 Jul 2025 at 15:20.
6 and 10 Oct 2025
Essex And Suffolk Water are proposing to carry out New service connection on Carlton Drive, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 1 Aug 2025 at 13:55.
6 and 10 Oct 2025
Essex And Suffolk Water are proposing to carry out New service connection on Carlton Drive, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 6 Aug 2025 at 10:22.
6 Oct 2025 and 3 Apr 2026
Essex County Council are proposing to carry out Highway improvement works on Southend Arterial Road, Thundersley, Benfleet.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 3 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Aug 2025 at 11:01.
6 Oct 2025 and 3 Apr 2026
Essex County Council are proposing to carry out Highway improvement works on Southend Arterial Road, Thundersley, Benfleet.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 3 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Sep 2025 at 10:07.
7 and 14 Oct 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Western Approaches, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 19 Aug 2025 at 09:45.
13 and 24 Oct 2025
Essex County Council are proposing to carry out Highway improvement works on Long Road, Canvey Island.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Sep 2025 at 11:20.
13 and 31 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Station Road, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 26 Jun 2025 at 09:46.
13 and 31 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Station Road, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 9 Jul 2025 at 10:57.
13 and 31 Oct 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Station Road, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 21 Jul 2025 at 15:09.
13 and 24 Oct 2025
Essex And Suffolk Water are proposing to carry out New service connection on Leighwood Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 9 Jul 2025 at 08:18.
13 and 24 Oct 2025
Essex And Suffolk Water are proposing to carry out New service connection on Leighwood Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 9 Jul 2025 at 10:48.
13 Oct and 20 Dec 2025
Essex County Council are proposing to carry out Highway improvement works on Arterial Road, Rayleigh.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 20 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 9 May 2025 at 14:39.
13 Oct and 20 Dec 2025
Essex County Council are proposing to carry out Highway improvement works on Arterial Road, Rayleigh.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 20 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 May 2025 at 15:03.
13 and 17 Oct 2025
Essex County Council are proposing to carry out Remedial works on Spring Gardens, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Sep 2025 at 11:19.
17 and 20 Oct 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Victoria Avenue, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 2 Sep 2025 at 15:00.
20 Oct and 18 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Ness Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:40.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Waterford Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 12:59.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Fremantle, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:39.
20 Oct and 25 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Shoeburyness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:27.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on West Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:38.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Waterford Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:36.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Stroma Gardens, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:23.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Thorpedene Gardens, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:36.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Elm Grove, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 11:10.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Elm Grove, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 11:46.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Thorpe Hall Avenue, Thorpe Bay.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 11:29.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Thorpe Hall Avenue, Thorpe Bay.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:46.
20 Oct and 14 Nov 2025
Network Rail are proposing to carry out roadworks on Riviera Drive, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Sep 2025 at 14:34.
20 Oct 2025 and 3 Feb 2027
Southend-on-sea Borough Council are proposing to carry out Highway improvement works on Queensway, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 3 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Southend-on-sea Borough Council on 8 Sep 2025 at 10:45.
20 Oct 2025 and 3 Feb 2027
Southend-on-sea Borough Council are proposing to carry out Highway improvement works on Southchurch Road, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 3 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Southend-on-sea Borough Council on 8 Sep 2025 at 10:46.
20 Oct 2025 and 3 Feb 2027
Southend-on-sea Borough Council are proposing to carry out Highway improvement works on Sutton Road, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 3 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Southend-on-sea Borough Council on 8 Sep 2025 at 10:44.
20 Oct and 10 Nov 2025
Cadent Gas were proposing to carry out Utility asset works on Belchamps Way, Hawkwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 10 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 16:57.
20 Oct and 1 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Belchamps Way, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jul 2025 at 08:53.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Hockley Rise, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 09:20.
20 Oct and 10 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Hockley Rise, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 11:01.
20 Oct and 1 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Belchamps Way, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 09:21.
22 and 25 Oct 2025
Essex County Council are proposing to carry out Highway improvement works on Maple Way, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 31 Jul 2025 at 12:17.
22 and 25 Oct 2025
Essex County Council are proposing to carry out Highway improvement works on Maple Way, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Aug 2025 at 10:14.
22 and 25 Oct 2025
Essex County Council are proposing to carry out Highway improvement works on Maple Way, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Aug 2025 at 12:08.
22 and 25 Oct 2025
Essex County Council are proposing to carry out Highway improvement works on Link Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 7 Aug 2025 at 10:00.
22 and 25 Oct 2025
Essex County Council are proposing to carry out Highway improvement works on Link Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 Aug 2025 at 12:08.
27 Oct and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Pentland Avenue, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:28.
27 Oct and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Connaught Gardens, Shoeburyness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:31.
27 Oct and 17 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Cranley Gardens, Shoeburyness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:32.
27 and 31 Oct 2025
Essex County Council are proposing to carry out Highway improvement works on Vicarage Hill, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Sep 2025 at 08:57.
27 and 29 Oct 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Prittlewell Chase, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 11 Aug 2025 at 09:20.
27 and 29 Oct 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Prittlewell Chase, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 13 Aug 2025 at 09:57.
27 Oct and 8 Nov 2025
Essex County Council are proposing to carry out Highway improvement works on Eastwood Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Jul 2025 at 09:51.
27 and 31 Oct 2025
Essex And Suffolk Water are proposing to carry out New service connection on Spa Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 11 Jul 2025 at 08:38.
30 Oct and 4 Nov 2025
Essex County Council are proposing to carry out Highway improvement works on Maple Way, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Sep 2025 at 09:47.
30 Oct and 4 Nov 2025
Essex County Council are proposing to carry out Highway improvement works on Link Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Sep 2025 at 09:53.
31 Oct and 4 Nov 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Southchurch Boulevard, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 8 Aug 2025 at 12:07.
31 Oct and 4 Nov 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Southchurch Boulevard, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 12 Aug 2025 at 09:59.
3 Nov 2025 and 1 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Ness Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 1 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 10:06.
3 and 24 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Waterford Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 10:07.
3 and 24 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Fremantle, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 10:02.
3 and 24 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Linton Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:41.
3 and 24 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on St Andrews Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:43.
3 and 24 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Seaview Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:14.
7 and 11 Nov 2025
Essex County Council are proposing to carry out Highway improvement works on Maple Way, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 31 Jul 2025 at 11:55.
7 and 11 Nov 2025
Essex County Council are proposing to carry out Highway improvement works on Link Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 31 Jul 2025 at 09:40.
7 and 11 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on The Ridgeway, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 17 Mar 2025 at 11:22.
7 and 11 Nov 2025
Network Rail were proposing to carry out Works for Rail Purposes on The Ridgeway, Westcliff-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 November 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Apr 2025 at 10:38.
10 Nov and 16 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Shoeburyness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 16 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 10:19.
10 Nov and 1 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on West Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 10:16.
10 Nov and 1 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Richmond Avenue, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:12.
10 Nov and 1 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Admirals Walk, Shoeburyness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:28.
11 Nov and 2 Dec 2025
BT were proposing to carry out Utility asset works on High Road, Hockley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2025 and run through until 2 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Jun 2025 at 17:11.
11 Nov and 2 Dec 2025
BT were proposing to carry out Utility asset works on Main Road, Hockley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2025 and run through until 2 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Jun 2025 at 17:11.
11 Nov and 2 Dec 2025
BT were proposing to carry out Utility asset works on Southend Road, Hockley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2025 and run through until 2 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Jun 2025 at 17:10.
11 Nov and 2 Dec 2025
BT were proposing to carry out Utility asset works on Aldermans Hill, Hockley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2025 and run through until 2 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Jun 2025 at 17:11.
17 Nov and 8 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Waterford Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:21.
17 Nov and 8 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Stroma Gardens, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:06.
17 Nov and 8 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Thorpedene Gardens, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:17.
17 Nov 2025 and 15 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Fermoy Road, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 15 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:49.
17 Nov 2025 and 15 Jan 2026
Cadent Gas were proposing to carry out Utility asset works on Fermoy Road, Thorpe Bay.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2025 and run through until 15 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:43.
17 Nov and 8 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Elm Grove, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:52.
17 Nov and 8 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Thorpe Hall Avenue, Thorpe Bay.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 15:53.
17 Nov and 5 Dec 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Arterial Road, Leigh-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 10 Sep 2025 at 08:30.
17 Nov and 5 Dec 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Arterial Road, Leigh-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 10 Sep 2025 at 10:30.
17 and 24 Nov 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Western Approaches, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 14 Aug 2025 at 14:21.
20 Nov and 10 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Richmond Avenue, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:38.
20 Nov and 10 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Admirals Walk, Shoeburyness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 15:37.
23 and 30 Nov 2025
Essex And Suffolk Water are proposing to carry out New service connection on Spa Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 11 Sep 2025 at 13:57.
23 Nov and 7 Dec 2025
Essex And Suffolk Water are proposing to carry out New service connection on Spa Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 11:15.
24 Nov and 15 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Pentland Avenue, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:29.
24 Nov and 15 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Connaught Gardens, Shoeburyness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:15.
24 Nov and 15 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Cranley Gardens, Shoeburyness.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 10:17.
24 Nov and 15 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Daines Way, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 14:38.
24 Nov and 30 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Barnstaple Road, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 14:35.
26 Nov and 4 Dec 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Warrior Square, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 4 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 27 Aug 2025 at 13:42.
26 Nov and 4 Dec 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Warrior Square North, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 4 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 27 Aug 2025 at 13:44.
26 Nov and 3 Dec 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Warrior Square East, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 3 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 27 Aug 2025 at 13:45.
1 and 19 Dec 2025
Essex County Council are proposing to carry out Highway improvement works on Labworth Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Sep 2025 at 08:30.
1 and 22 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Linton Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:36.
1 and 22 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on St Andrews Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:26.
1 and 22 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Seaview Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:31.
1 and 3 Dec 2025
Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Fairfax Drive, Westcliff-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 3 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 15 Sep 2025 at 09:44.
1 and 3 Dec 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Fairfax Drive, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 15 Sep 2025 at 15:32.
1 and 3 Dec 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Fairfax Drive, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 15 Sep 2025 at 17:34.
8 and 19 Dec 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Richmond Avenue, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 13:24.
15 and 17 Dec 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Harp House Roundabout, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 10 Sep 2025 at 14:59.
15 and 17 Dec 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Harp House Roundabout, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Sep 2025 at 16:00.
Roadworks Map near to The Ridgeway, WESTCLIFF-ON-SEA, SS0 8PX (Loading...)















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to The Ridgeway, WESTCLIFF-ON-SEA, SS0 8PX (17 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Aug 2025 - 4 Aug 2026)
(Scheduled: 17 Sep 2025 - 19 Sep 2025)
(Scheduled: 28 Jul 2025 - 26 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.