ROADWORKS SUMMARY
The Drive, WESTCLIFF-ON-SEA, SS0 8PL
Introduction

View current and future planned roadworks and road closures for The Drive, SS0 8PL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to The Drive, WESTCLIFF-ON-SEA, SS0 8PL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
16 Jan 2026
Cadent Gas are carrying out Utility asset works on Aldermans Hill, Hockley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 07:26 and could run through until 16 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 08:04.
7 Apr and 12 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Arterial Road, Rayleigh.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 12 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 13 Mar 2025 at 15:58.
12 Jul 2025
Essex County Council are carrying out Highway improvement works on Arterial Road, Rayleigh.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 00:00 and could run through until 12 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 8 Apr 2025 at 08:00.
21 Apr and 13 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Arterial Road, Rayleigh.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 13 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 14 Feb 2025 at 11:03.
12 May and 10 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Queensway, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 11:50.
12 May and 10 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Queensway, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 15:39.
23 Jun 2025
Cadent Gas are carrying out Utility asset works on Third Walk, Canvey Island.
These works are categorised as Major.
The works started on 19 May 2025 at 09:40 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 11:07.
19 May and 17 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Whitegate Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 13:40.
19 May and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Bull Lane, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 14:08.
16 Jun 2025
Cadent Gas are carrying out Utility asset works on Bull Lane, Hockley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 10:00 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 11:28.
Monday
Cadent Gas were proposing to carry out Utility asset works on Cleveland Road, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 16:45.
Monday
Cadent Gas are proposing to carry out Utility asset works on Cleveland Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 13:33.
Monday
Cadent Gas are proposing to carry out Utility asset works on Cleveland Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 10:50.
26 May and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Western Esplanade, Canvey Island.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 15:58.
26 May and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Western Esplanade, Canvey Island.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:56.
26 May and 7 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Western Esplanade, Canvey Island.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 7 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 16:44.
Monday
Cadent Gas are proposing to carry out Utility asset works on Leigh Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 08:44.
Monday
Cadent Gas were proposing to carry out Utility asset works on Leigh Road, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 9 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 16:46.
Monday
Cadent Gas are proposing to carry out Utility asset works on Leigh Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 May 2025 at 12:17.
26 May and 23 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Woodfield Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 08:57.
26 May and 23 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Woodfield Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 11:00.
23 Aug 2025
Cadent Gas are carrying out Utility asset works on Woodfield Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 May 2025 at 08:17 and could run through until 23 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 13:31.
26 May and 22 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Manners Way, Southend-on-sea.
These works are categorised as Major.
The works will start on or after 26 May 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 15:32.
22 Jul 2025
Cadent Gas are carrying out Utility asset works on Manners Way, Southend-on-sea.
These works are categorised as Major.
The works started on 27 May 2025 at 10:37 and could run through until 22 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 11:25.
26 May and 22 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Hampton Gardens, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 15:36.
26 May and 22 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Hampton Gardens, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 14:12.
26 May and 22 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Hampton Gardens, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 15:35.
22 Jul 2025
Cadent Gas are carrying out Utility asset works on Hampton Gardens, Southend-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 10:39 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 11:44.
26 May and 8 Sep 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Hampton Gardens, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 25 Feb 2025 at 09:07.
26 May and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Byrne Drive, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 May 2025 at 10:26.
4 Jul 2025
Cadent Gas are carrying out Utility asset works on Byrne Drive, Southend-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 11:35 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 12:17.
26 May and 8 Sep 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Byrne Drive, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 25 Feb 2025 at 09:11.
26 May and 8 Sep 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Thornford Gardens, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 25 Feb 2025 at 09:14.
26 May and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Oakengrange Drive, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 15:37.
Monday
Essex And Suffolk Water are carrying out New service connection on Gladstone Road, Hockley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:19 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 29 May 2025 at 07:31.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Ridgeway, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 13:59.
Tomorrow
Essex County Council are carrying out Highway improvement works on Ridgeway, Rayleigh.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 09:33 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 28 May 2025 at 09:51.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Burrows Way, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 13:41.
Today
Essex County Council are proposing to carry out Highway improvement works on London Road Service Road East, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Feb 2025 at 15:56.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Mitchells Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 May 2025 at 08:04.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Mitchells Avenue, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 May 2025 at 08:20.
2 and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Southchurch Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 13:43.
2 and 13 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Southchurch Road, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 10:37.
2 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Manners Way Service Road West, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 15:38.
2 and 22 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Alton Gardens, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 15:40.
Tomorrow
Essex County Council are proposing to carry out Highway improvement works on Stanley Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Mar 2025 at 15:04.
Tomorrow
Essex County Council are carrying out Highway improvement works on Stanley Road, Thundersley, Benfleet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 15:37 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 2 Jun 2025 at 15:51.
3 and 20 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Point Road, Canvey Island.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 19 May 2025 at 10:53.
3 and 20 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on High Street, Canvey Island.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 13 May 2025 at 09:00.
3 and 20 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on High Street, Canvey Island.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 14 May 2025 at 09:02.
4 and 18 Jun 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Western Esplanade, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 13 Mar 2025 at 12:04.
4 and 20 Jun 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Fairfax Drive, Westcliff-on-sea.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 2 Jun 2025 at 15:40.
4 and 20 Jun 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Fairfax Drive, Westcliff-on-sea.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 3 Jun 2025 at 12:02.
6 and 12 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Spring Gardens, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 13:24.
6 and 12 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on High Mead, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Feb 2025 at 13:24.
9 and 27 Jun 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Rylands Road, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 14 Mar 2025 at 15:07.
9 and 23 Jun 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Hainault Avenue, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 13 Mar 2025 at 15:58.
9 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 09:43.
9 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Church Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 14:18.
9 and 14 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Kiln Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 May 2025 at 09:43.
9 and 14 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Kiln Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 May 2025 at 09:32.
9 and 14 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Kiln Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 May 2025 at 08:31.
9 and 14 Jun 2025
Essex County Council are proposing to carry out Remedial works on Kenneth Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 May 2025 at 11:04.
9 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Oakengrange Drive, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 14:25.
9 and 14 Jun 2025
Essex County Council are proposing to carry out Remedial works on Bread And Cheese Hill, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 May 2025 at 10:53.
9 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Manners Way Service Road West, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 14:26.
9 and 16 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Feb 2025 at 10:51.
9 and 29 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Harp House Roundabout, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 15:28.
10 and 12 Jun 2025
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Burches Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 17 Mar 2025 at 08:26.
10 and 14 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Spring Gardens, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 16 Apr 2025 at 15:54.
10 and 14 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on High Mead, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Apr 2025 at 15:28.
13 and 18 Jun 2025
Essex County Council are proposing to carry out Remedial works on Canvey Road - B1014, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 May 2025 at 15:14.
15 and 19 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Spring Gardens, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Feb 2025 at 14:25.
15 and 19 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on High Mead, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 21 Feb 2025 at 14:56.
16 and 18 Jun 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Vernon Road, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 7 Apr 2025 at 14:34.
16 Jun and 4 Jul 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Rylands Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 20 Mar 2025 at 12:51.
16 Jun and 4 Jul 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Rylands Road, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 8 Apr 2025 at 14:45.
16 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Heather Drive, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 09:25.
16 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Heather Drive, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 10:40.
16 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Heather Drive, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 08:30.
16 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Alton Gardens, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 14:23.
16 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Harp House Roundabout, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 14:25.
16 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Buckingham Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 08:27.
16 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Buckingham Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 08:08.
17 and 30 Jun 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Woodfield Park Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 12 May 2025 at 10:23.
17 and 30 Jun 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Woodfield Park Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 3 Jun 2025 at 08:48.
17 and 26 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 13 Feb 2025 at 08:19.
17 and 26 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on Rayleigh Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Feb 2025 at 08:19.
17 and 26 Jun 2025
Essex County Council were proposing to carry out Highway improvement works on Rayleigh Road, Thundersley, Benfleet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Apr 2025 at 15:49.
19 and 21 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Mar 2025 at 11:40.
19 and 21 Jun 2025
Essex County Council are proposing to carry out Highway improvement works on White Hart Lane, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Jun 2025 at 11:12.
20 and 24 Jun 2025
Network Rail are proposing to carry out Works for Rail Purposes on The Ridgeway, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 17 Mar 2025 at 11:20.
20 and 24 Jun 2025
Network Rail were proposing to carry out Works for Rail Purposes on The Ridgeway, Westcliff-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 June 2025 and run through until 24 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Apr 2025 at 10:06.
20 and 23 Jun 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Leigh Road, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 1 Apr 2025 at 15:27.
23 and 25 Jun 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Marine Parade, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 9 Apr 2025 at 10:22.
23 and 25 Jun 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tudor Road, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 11 Apr 2025 at 11:22.
23 and 25 Jun 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tudor Road, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 12 May 2025 at 09:17.
23 and 25 Jun 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Tudor Road, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 1 Apr 2025 at 15:16.
23 Jun and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on The Fairway, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 11:29.
23 Jun and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on The Fairway, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 14:16.
23 Jun and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on The Fairway, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:41.
23 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Woodside, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 11:30.
23 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Woodside, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:41.
23 Jun and 8 Sep 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Alton Gardens, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 10 Mar 2025 at 10:18.
24 and 30 Jun 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Linden Way, Canvey Island.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 June 2025 and run through until 30 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Apr 2025 at 12:41.
24 Jun and 3 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Linden Way, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 09:04.
24 Jun and 3 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Linden Way, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 08:40.
24 and 30 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Tudor Road, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 30 June 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2025 at 15:32.
24 and 30 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Tudor Road, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 30 June 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 14:04.
26 and 30 Jun 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Vernon Road, Leigh-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 1 Apr 2025 at 13:51.
26 and 30 Jun 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Silversea Drive, Westcliff-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 1 Apr 2025 at 13:30.
26 and 30 Jun 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Eastern Avenue, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 1 Apr 2025 at 14:04.
30 Jun and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Ormonde Avenue, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 09:56.
30 Jun and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Ormonde Avenue, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 10:45.
30 Jun and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Ormonde Avenue, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 08:53.
1 and 3 Jul 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Vernon Road, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 2 Apr 2025 at 10:57.
1 and 3 Jul 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Silversea Drive, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 2 Apr 2025 at 11:51.
1 and 21 Jul 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Rylands Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 9 Apr 2025 at 11:10.
1 and 7 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Woodfield Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 24 Feb 2025 at 13:18.
1 and 3 Jul 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Eastern Avenue, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 7 Apr 2025 at 09:55.
3 and 7 Jul 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Chalkwell Avenue, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 9 Apr 2025 at 10:27.
4 and 7 Jul 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Marine Parade, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 11 Apr 2025 at 12:06.
4 and 8 Jul 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Marine Parade, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 4 Apr 2025 at 15:42.
4 and 8 Jul 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Vernon Road, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 4 Apr 2025 at 14:47.
4 and 15 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on Southend Arterial Road, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Mar 2025 at 13:36.
7 and 21 Jul 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Victoria Avenue, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 28 May 2025 at 08:06.
7 and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on St Davids Drive, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 10:07.
7 and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on St Davids Drive, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 09:44.
7 and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on St Davids Drive, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 08:32.
7 and 10 Jul 2025
Essex County Council are proposing to carry out Highway improvement works on London Road Service Road East, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Apr 2025 at 16:21.
14 and 16 Jul 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Eastern Avenue, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 16 Apr 2025 at 14:49.
15 and 19 Jul 2025
Essex County Council are proposing to carry out Remedial works on High Street, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 May 2025 at 08:33.
15 and 19 Jul 2025
Essex County Council are proposing to carry out Remedial works on Ferry Road, South Benfleet, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 23 May 2025 at 10:07.
21 and 27 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Remedial works on Beach Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 09:50.
21 and 27 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Remedial works on Beach Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 May 2025 at 09:48.
21 and 27 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Remedial works on Beach Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 08:38.
21 and 30 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Florence Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 08:56.
21 and 30 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Florence Road, Canvey Island.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 10:28.
21 Jul and 4 Aug 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Riviera Drive, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 2 May 2025 at 12:32.
21 Jul and 4 Aug 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Riviera Drive, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 21 May 2025 at 08:50.
21 Jul and 1 Aug 2025
BT are proposing to carry out Utility asset works on Manners Way Service Road East, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 28 Apr 2025 at 15:39.
21 Jul and 4 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Eastwood Old Road, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 15:16.
21 Jul and 4 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Eastwood Old Road, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 09:33.
21 Jul and 4 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Eastwood Old Road, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 12:02.
21 Jul and 4 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Eastwood Old Road, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 12:49.
21 Jul and 4 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Eastwood Old Road, Eastwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:42.
21 and 26 Jul 2025
T-Mobile (UK) are proposing to carry out Utility asset works on Claydons Lane, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 16 May 2025 at 09:20.
21 and 27 Jul 2025
T-Mobile (UK) are proposing to carry out Utility asset works on Claydons Lane, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 30 May 2025 at 09:13.
21 and 27 Jul 2025
T-Mobile (UK) are proposing to carry out Utility asset works on Claydons Lane, Thundersley, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 2 Jun 2025 at 11:47.
23 Jul and 6 Aug 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Central Avenue, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 6 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 24 Apr 2025 at 09:15.
28 Jul and 11 Aug 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Chichester Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 23 Apr 2025 at 11:58.
29 and 31 Jul 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Hamstel Road And Eastern Avenue Roundabout, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 29 Apr 2025 at 16:14.
4 Aug and 23 Dec 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Hampton Gardens, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 23 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 14 Mar 2025 at 15:56.
4 Aug and 23 Dec 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Byrne Drive, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 23 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 14 Mar 2025 at 15:47.
4 Aug and 23 Dec 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Thornford Gardens, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 23 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 14 Mar 2025 at 15:54.
4 and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Moor Park Gardens, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 12:11.
4 and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Moor Park Gardens, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 14:16.
4 and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Moor Park Gardens, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:42.
4 Aug and 23 Dec 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Alton Gardens, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 23 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 17 Mar 2025 at 08:41.
4 and 8 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on Hatfield Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 May 2025 at 14:05.
5 and 11 Aug 2025
Essex And Suffolk Water are proposing to carry out New service connection on Gladstone Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 11 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 15 May 2025 at 08:20.
11 and 16 Aug 2025
Essex County Council were proposing to carry out Highway improvement works on Rayleigh Road, Thundersley, Benfleet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 16 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 May 2025 at 15:00.
11 Aug and 3 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Woodlands Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 13:27.
11 Aug and 3 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Woodlands Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 15:29.
11 Aug and 8 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Southend Road, Hockley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 14:34.
11 Aug and 8 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Southend Road, Hockley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Feb 2025 at 10:34.
11 Aug and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Spa Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 13:20.
11 Aug and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Spa Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 12:52.
11 and 15 Aug 2025
Cadent Gas were proposing to carry out New service connection on White Hart Lane, Hawkwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 12:01.
25 Aug and 8 Sep 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Lonsdale Road, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 8 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 30 May 2025 at 10:19.
25 Aug and 8 Sep 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Salisbury Avenue, Westcliff-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 8 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 28 May 2025 at 11:11.
25 Aug and 9 Sep 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Chalkwell Park Drive, Leigh-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 9 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 28 May 2025 at 11:11.
25 Aug and 9 Sep 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Stock Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 21 May 2025 at 10:27.
26 and 29 Aug 2025
Essex County Council are proposing to carry out Highway improvement works on Woodfield Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 May 2025 at 09:41.
28 Aug and 1 Sep 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Southbourne Grove, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 29 May 2025 at 12:44.
28 Aug and 1 Sep 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Southbourne Grove, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 3 Jun 2025 at 15:13.
Roadworks Map near to The Drive, WESTCLIFF-ON-SEA, SS0 8PL (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to The Drive, WESTCLIFF-ON-SEA, SS0 8PL (53 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.