ROADWORKS SUMMARY
Watkin Crescent, SEAHAM, SR7 9QA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Watkin Crescent, SR7 9QA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Watkin Crescent, SEAHAM, SR7 9QA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Watkin Crescent are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Durham County Council logo
LONG TERM
Between
7 Aug 2023 and 3 Jan 2025
Details
View Map
Share
Follow
Dawdon Link Road

Durham County Council are proposing to carry out Highway improvement works on Dawdon Link Road, Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2023 and could run through until 3 January 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 9 Jun 2023 at 12:39.

Durham County Council logo
LONG TERM
Between
21 Aug 2023 and 31 Jan 2025
Details
View Map
Share
Follow
Dawdon Link Road

Durham County Council are proposing to carry out Highway improvement works on Dawdon Link Road, Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2023 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 10 Aug 2023 at 12:47.

Durham County Council logo
LONG TERM
Between
21 Aug 2023 and 31 Jan 2025
Details
View Map
Share
Follow
B1285 (From East Moor Road Junc To A19)

Durham County Council are proposing to carry out Highway improvement works on B1285 (From East Moor Road Junc To A19), Murton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2023 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 10 Aug 2023 at 12:48.

Durham County Council logo
LONG TERM
Between
21 Aug 2023 and 31 Jan 2025
Details
View Map
Share
Follow
Dawdon Link Road

Durham County Council are proposing to carry out Highway improvement works on Dawdon Link Road, Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2023 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 10 Aug 2023 at 12:45.

Durham County Council logo
LONG TERM
Between
6 Sep 2023 and 31 Jan 2025
Details
View Map
Share
Follow
Spring Road

Durham County Council are proposing to carry out Highway improvement works on Spring Road, Murton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2023 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 23 Aug 2023 at 12:59.

Northumbrian Water logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Moor Crescent

Northumbrian Water are carrying out Utility repair and maintenance works on Moor Crescent, Ludworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 July 2024 at 13:00 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Jul 2024 at 12:14.

Northumbrian Water logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Church View

Northumbrian Water are carrying out Utility repair and maintenance works on Church View, Ludworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 July 2024 at 13:00 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Jul 2024 at 12:14.

LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Scott Terrace West Rear

Sunderland City Council are carrying out Highway improvement works on Scott Terrace West Rear, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 07:48.

LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Caroline Street South Back

Sunderland City Council are carrying out Highway improvement works on Caroline Street South Back, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 09:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 07:48.

LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Victoria Street

Sunderland City Council are carrying out Highway improvement works on Victoria Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 15 Nov 2024 at 07:38.

Northumbrian Water logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Barnard Avenue

Northumbrian Water are carrying out Utility repair and maintenance works on Barnard Avenue, Ludworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:45 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 28 Oct 2024 at 09:56.

Durham County Council logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
St Cuthberts Road

Durham County Council are proposing to carry out Highway repair and maintenance works on St Cuthberts Road, Peterlee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Sep 2024 at 11:07.

Northumbrian Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Northdene Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Northdene Avenue, Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 25 Sep 2024 at 14:00.

Durham County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Cuthberts Road

Durham County Council are proposing to carry out Highway repair and maintenance works on St Cuthberts Road, Peterlee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 15 Nov 2024 at 14:19.

Northumbrian Water logo
Finishing
Monday
Details
View Map
Share
Follow
Queen Street (Back)

Northumbrian Water are carrying out Utility repair and maintenance works on Queen Street (Back), Seaham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:14 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 20 Nov 2024 at 08:33.

Northern Powergrid (Northeast) logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Stockton Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Stockton Road, Cold Hesledon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 17 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Nov 2024 at 11:33.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Rear 6 To 21 Ryhope Street South

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear 6 To 21 Ryhope Street South, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 25 Sep 2024 at 11:02.

Northern Powergrid (Northeast) logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Stockton Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Stockton Road, Cold Hesledon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 17 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Oct 2024 at 09:05.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Rear 6 To 21 Ryhope Street South

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear 6 To 21 Ryhope Street South, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 07:48.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Stavordale Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stavordale Street (Back), Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 25 Oct 2024 at 13:15.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Stavordale Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stavordale Street (Back), Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 19 Nov 2024 at 08:45.

Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Sea View Road

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Sea View Road, Grangetown, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 15 Nov 2024 at 13:34.

Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Sea View Road

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Sea View Road, Grangetown, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 13:33.

Northern Powergrid (Northeast) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
John Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on John Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:14.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Front Street South Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Front Street South Back, Fence Houses, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 07:09.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Front Street South Back

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Front Street South Back, Fence Houses, Houghton-le-spring.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 15:07.

Northern Powergrid (Northeast) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
John Street

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on John Street, Hetton-le-hole, Houghton-le-spring.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Oct 2024 at 08:16.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Cheviot Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Cheviot Lane, Ryhope, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 3 Oct 2024 at 06:14.

Northern Powergrid (Northeast) logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Back Ryhope Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Back Ryhope Street, Ryhope, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 Oct 2024 at 09:55.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Maria Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Maria Street, Silksworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 22 Oct 2024 at 11:52.

Durham County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hudson Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Hudson Avenue, Horden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 13 Nov 2024 at 10:26.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Staveley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Staveley Road, Peterlee.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 09:44.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Cumbrian Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumbrian Way, Peterlee.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 09:43.


Roadworks Map near to Watkin Crescent, SEAHAM, SR7 9QA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 00:19
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Watkin Crescent, SEAHAM, SR7 9QA (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Durham County Council logo
BURNIP ROAD 
(0.2 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 22 Nov 2024 - 5 Dec 2024
0.2
Details
Share
Follow
2
Durham County Council logo
CAIRNS ROAD 
(0.6 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 18 Nov 2024 - 29 Nov 2024
0.6
Details
Share
Follow
3
Durham County Council logo
STATION ESTATE NORTH 
(0.6 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 18 Nov 2024 - 29 Nov 2024
0.6
Details
Share
Follow
4
Durham County Council logo
STATION ESTATE SOUTH 
(0.7 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 18 Nov 2024 - 29 Nov 2024
0.7
Details
Share
Follow
5
Durham County Council logo
STATION ROAD SOUTH 
(0.7 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 18 Nov 2024 - 29 Nov 2024
0.7
Details
Share
Follow
6
Northern Gas Networks logo
EMERGENCY
  
STOCKTON ROAD 
(0.9 miles)
Northern Gas Networks
Utility repair and maintenance works - Carriageway, Verge - Multi-way signals
Complete
31 Oct 2024 11:40 - 21 Nov 2024 15:11
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.