ROADWORKS SUMMARY
Charles Street, SEAHAM, SR7 7SG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Charles Street, SR7 7SG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Charles Street, SEAHAM, SR7 7SG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Charles Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Durham County Council logo
LONG TERM
Between
20 Feb 2023 and 29 Sep 2024
Details
View Map
Share
Follow
A1018 (From Stockton Road/b1285 Junc To A19)

Durham County Council are proposing to carry out Highway improvement works on A1018 (From Stockton Road/b1285 Junc To A19), Seaham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2023 and could run through until 29 September 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 14 Feb 2023 at 15:09.

Durham County Council logo
LONG TERM
Until
14 Sep 2024
Details
View Map
Share
Follow
Dawdon Link Road

Durham County Council are carrying out Highway repair and maintenance works on Dawdon Link Road, Seaham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 March 2023 at 08:30 and could run through until 14 September 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Durham County Council on 21 Nov 2023 at 15:11.

Durham County Council logo
LONG TERM
Between
7 Aug 2023 and 3 Jan 2025
Details
View Map
Share
Follow
Dawdon Link Road

Durham County Council are proposing to carry out Highway improvement works on Dawdon Link Road, Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2023 and could run through until 3 January 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 9 Jun 2023 at 13:39.

Durham County Council logo
LONG TERM
Between
21 Aug 2023 and 31 Jan 2025
Details
View Map
Share
Follow
Dawdon Link Road

Durham County Council are proposing to carry out Highway improvement works on Dawdon Link Road, Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2023 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 10 Aug 2023 at 13:47.

Durham County Council logo
LONG TERM
Between
21 Aug 2023 and 31 Jan 2025
Details
View Map
Share
Follow
B1285 (From East Moor Road Junc To A19)

Durham County Council are proposing to carry out Highway improvement works on B1285 (From East Moor Road Junc To A19), Murton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2023 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 10 Aug 2023 at 13:48.

Durham County Council logo
LONG TERM
Between
21 Aug 2023 and 31 Jan 2025
Details
View Map
Share
Follow
Dawdon Link Road

Durham County Council are proposing to carry out Highway improvement works on Dawdon Link Road, Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2023 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 10 Aug 2023 at 13:45.

Durham County Council logo
LONG TERM
Between
6 Sep 2023 and 31 Jan 2025
Details
View Map
Share
Follow
Spring Road

Durham County Council are proposing to carry out Highway improvement works on Spring Road, Murton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2023 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 23 Aug 2023 at 13:59.

Durham County Council logo
LONG TERM
Between
19 Feb and 15 Aug 2024
Details
View Map
Share
Follow
B1285 (From East Moor Road Junc To A19)

Durham County Council are proposing to carry out Highway improvement works on B1285 (From East Moor Road Junc To A19), Murton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 15 August 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 17 Jan 2024 at 15:54.

Northern Gas Networks logo
LONG TERM
Until
17 May 2024
Details
View Map
Share
Follow
Silksworth Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Silksworth Road, Silksworth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 17 May 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2024 at 08:24.

Northern Gas Networks logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Stockton Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Stockton Road, Cold Hesledon.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 March 2024 at 11:30 and could run through until 2 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Apr 2024 at 12:17.

Durham County Council logo
LONG TERM
Between
12 Mar and 26 Jun 2024
Details
View Map
Share
Follow
A19 J A182/b1285 Leave N

Durham County Council are proposing to carry out Highway improvement works on A19 J A182/b1285 Leave N, Easington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2024 and could run through until 26 June 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 26 Jul 2023 at 11:33.

LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
A19 From J A1018 To J A690/b1286 N

Sunderland City Council are carrying out Highway improvement works on A19 From J A1018 To J A690/b1286 N, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2024 at 19:00 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 26 Apr 2024 at 15:30.

Durham County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Church Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Church Street, Murton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 29 Jan 2024 at 13:38.

Finishing
Tomorrow
Details
View Map
Share
Follow
A19 J A690/b1286 Leave N

Sunderland City Council are carrying out Highway improvement works on A19 J A690/b1286 Leave N, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2024 at 19:00 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 24 Apr 2024 at 07:54.

Northumbrian Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Herrington Footpath 18

Northumbrian Water are carrying out Utility repair and maintenance works on Herrington Footpath 18, Sunderland.

The works should not impact the carriageway.

The works started on 5 April 2024 at 11:30 and could run through until 2 May 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Northumbrian Water on 24 Apr 2024 at 13:19.

LONG TERM
Between
15 Apr and 27 Sep 2024
Details
View Map
Share
Follow
Caroline Street South Back

Sunderland City Council are proposing to carry out Highway improvement works on Caroline Street South Back, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 21 Feb 2024 at 13:20.

Durham County Council logo
Finishing
Monday
Details
View Map
Share
Follow
The Graham Way

Durham County Council are proposing to carry out Highway repair and maintenance works on The Graham Way, Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Feb 2024 at 10:10.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Tunstall Park

BT are carrying out Utility asset works on Tunstall Park, Ashbrooke, Sunderland.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 April 2024 at 08:59 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Apr 2024 at 11:12.

Between
21 Apr and 9 May 2024
Details
View Map
Share
Follow
Westheath Avenue

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Westheath Avenue, Grangetown, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 16 Apr 2024 at 10:05.

Durham County Council logo
Until
16 May 2024
Details
View Map
Share
Follow
Tempest Road

Durham County Council are carrying out Highway repair and maintenance works on Tempest Road, Seaham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 April 2024 at 08:00 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 23 Apr 2024 at 09:26.

Finishing
Tomorrow
Details
View Map
Share
Follow
Elsdonburn Road

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Elsdonburn Road, East Moorside, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 16 Apr 2024 at 08:15.

Finishing
Tomorrow
Details
View Map
Share
Follow
Rutland Avenue

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Rutland Avenue, Silksworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 17 Apr 2024 at 08:18.

Vodafone logo
Finishing
Thursday
Details
View Map
Share
Follow
A19 J A182/b1285 Leave N

Vodafone are proposing to carry out Diversionary works on A19 J A182/b1285 Leave N, Easington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Vodafone on 25 Apr 2024 at 09:51.

Northumbrian Water logo
Between
28 Apr and 9 May 2024
Details
View Map
Share
Follow
West Avenue (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on West Avenue (Back), Easington Colliery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 16 Apr 2024 at 10:56.

Durham County Council logo
Between
28 Apr and 19 May 2024
Details
View Map
Share
Follow
Seaton Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Seaton Lane, Seaham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 25 Apr 2024 at 15:04.

Telefonica UK logo
Finishing
Wednesday
Details
View Map
Share
Follow
The Precinct

Telefonica UK are proposing to carry out Utility asset works on The Precinct, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 21 Mar 2024 at 08:43.

Durham County Council logo
LONG TERM
Between
1 May and 30 Jun 2024
Details
View Map
Share
Follow
Church Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Church Lane, Murton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Mar 2024 at 14:32.

Between
6 and 30 May 2024
Details
View Map
Share
Follow
A19 Through J A690/b1286 S

Sunderland City Council are proposing to carry out Highway improvement works on A19 Through J A690/b1286 S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 26 Apr 2024 at 15:30.

Nexfibre Networks Limited logo
Between
7 and 10 May 2024
Details
View Map
Share
Follow
North Crescent

Nexfibre Networks Limited are proposing to carry out Utility asset works on North Crescent, Easington Village.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Apr 2024 at 14:17.

Nexfibre Networks Limited logo
Between
7 and 11 May 2024
Details
View Map
Share
Follow
Petwell Crescent

Nexfibre Networks Limited are proposing to carry out Utility asset works on Petwell Crescent, Easington Village.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Apr 2024 at 14:15.

Nexfibre Networks Limited logo
Between
12 and 14 May 2024
Details
View Map
Share
Follow
Holm Hill Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Holm Hill Lane, Easington Colliery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 23 Apr 2024 at 09:53.

Northern Powergrid (Northeast) logo
Between
13 and 31 May 2024
Details
View Map
Share
Follow
Laura Street West Back

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Laura Street West Back, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Feb 2024 at 12:42.

Between
2 Jun and 1 Jul 2024
Details
View Map
Share
Follow
A19 Through J A690/b1286 S

Sunderland City Council are proposing to carry out Highway improvement works on A19 Through J A690/b1286 S, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 26 Apr 2024 at 15:30.

Durham County Council logo
LONG TERM
Between
3 Jun and 31 Jul 2024
Details
View Map
Share
Follow
Blackhills Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Blackhills Road, Horden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 31 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Mar 2024 at 10:22.

LONG TERM
Between
10 Jun and 22 Nov 2024
Details
View Map
Share
Follow
Victoria Street

Sunderland City Council are proposing to carry out Highway improvement works on Victoria Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 17 Apr 2024 at 08:15.

LONG TERM
Between
10 Jun and 22 Nov 2024
Details
View Map
Share
Follow
Scott Terrace West Rear

Sunderland City Council are proposing to carry out Highway improvement works on Scott Terrace West Rear, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 17 Apr 2024 at 08:14.

LONG TERM
Between
10 Jun and 22 Nov 2024
Details
View Map
Share
Follow
Caroline Street South Back

Sunderland City Council are proposing to carry out Highway improvement works on Caroline Street South Back, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 17 Apr 2024 at 08:15.

LONG TERM
Between
10 Jun and 22 Nov 2024
Details
View Map
Share
Follow
Caroline Street

Sunderland City Council are proposing to carry out Highway improvement works on Caroline Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 17 Apr 2024 at 08:14.

Durham County Council logo
Between
11 and 13 Jun 2024
Details
View Map
Share
Follow
The Graham Way

Durham County Council are proposing to carry out Highway repair and maintenance works on The Graham Way, Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Apr 2024 at 13:08.

Durham County Council logo
Between
12 and 16 Jun 2024
Details
View Map
Share
Follow
A182 (From Carrs Farm To B1283 Roundabout)

Durham County Council are proposing to carry out Highway repair and maintenance works on A182 (From Carrs Farm To B1283 Roundabout), South Hetton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 16 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Apr 2024 at 13:08.

Durham County Council logo
LONG TERM
Between
17 Jun and 26 Jul 2024
Details
View Map
Share
Follow
B1285 From Junction With A19 To Junction With Seaton Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on B1285 From Junction With A19 To Junction With Seaton Lane, Seaham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Durham County Council on 13 Mar 2024 at 11:44.

Between
17 Jun and 8 Jul 2024
Details
View Map
Share
Follow
A690 Northbound From County Boundary To A19

Sunderland City Council are proposing to carry out Highway repair and maintenance works on A690 Northbound From County Boundary To A19, Houghton-le-spring.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 8 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 21 Mar 2024 at 08:59.

Durham County Council logo
Between
17 Jun and 12 Jul 2024
Details
View Map
Share
Follow
B1285 From Junction With A19 To Junction With Seaton Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on B1285 From Junction With A19 To Junction With Seaton Lane, Seaham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 18 Mar 2024 at 09:57.

Durham County Council logo
Between
1 and 14 Jul 2024
Details
View Map
Share
Follow
Bede Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Bede Street, Easington Colliery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 14 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 23 Apr 2024 at 09:57.

Durham County Council logo
LONG TERM
Between
1 Jul and 31 Aug 2024
Details
View Map
Share
Follow
B1285 From Junction With A19 To Junction With Seaton Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on B1285 From Junction With A19 To Junction With Seaton Lane, Seaham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Mar 2024 at 15:00.

Durham County Council logo
LONG TERM
Between
1 Jul and 30 Aug 2024
Details
View Map
Share
Follow
Stockton Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Stockton Road, Cold Hesledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Durham County Council on 18 Mar 2024 at 10:49.

Durham County Council logo
Between
2 and 15 Jul 2024
Details
View Map
Share
Follow
Ashton Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Ashton Street, Easington Colliery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 11:49.

Durham County Council logo
Between
2 and 15 Jul 2024
Details
View Map
Share
Follow
Bede Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Bede Street, Easington Colliery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 09:13.

Durham County Council logo
Between
2 and 15 Jul 2024
Details
View Map
Share
Follow
Seaside Lane (Back)

Durham County Council are proposing to carry out Highway repair and maintenance works on Seaside Lane (Back), Easington Colliery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 23 Apr 2024 at 09:56.

Durham County Council logo
Between
2 and 15 Jul 2024
Details
View Map
Share
Follow
Ascot Street (Back)

Durham County Council are proposing to carry out Highway repair and maintenance works on Ascot Street (Back), Easington Colliery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 24 Apr 2024 at 08:54.

Northern Powergrid (Northeast) logo
Between
14 and 25 Jul 2024
Details
View Map
Share
Follow
Canon Cockin Street East Back

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Canon Cockin Street East Back, Hendon, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 25 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Apr 2024 at 09:36.


Roadworks Map near to Charles Street, SEAHAM, SR7 7SG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Apr 2024 10:09
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Charles Street, SEAHAM, SR7 7SG (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Durham County Council logo
HARBOUR WALK 
(0.2 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 26 Apr 2024 08:00
(Scheduled: 25 Apr 2024 - 8 May 2024)
0.2
Details
Share
Follow
2
Durham County Council logo
MAJOR
  
TEMPEST ROAD 
(0.3 miles)
Durham County Council
Highway repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 23 Apr 2024 08:00
(Scheduled: 21 Apr 2024 - 16 May 2024)
0.3
Details
Share
Follow
3
Durham County Council logo
MAJOR
  
THE GRAHAM WAY 
(0.4 miles)
Durham County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 16 Apr 2024 - 29 Apr 2024
0.4
Details
Share
Follow
4
Northumbrian Water logo
NORTON AVENUE 
(0.9 miles)
Northumbrian Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 25 Apr 2024 09:35
(Scheduled: 24 Apr 2024 - 30 Apr 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.