ROADWORKS SUMMARY
Northland Close, SUNDERLAND, SR4 9RZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Northland Close, SR4 9RZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Northland Close, SUNDERLAND, SR4 9RZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Northland Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Easington Street

Sunderland City Council are carrying out Highway repair and maintenance works on Easington Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 April 2023 at 08:00 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 22 Sep 2023 at 11:05.

LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Church Street North

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Church Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 12 Oct 2023 at 11:38.

LONG TERM
Between
5 Feb and 24 Dec 2024
Details
View Map
Share
Follow
European Way

Sunderland City Council are proposing to carry out Highway repair and maintenance works on European Way, Pallion Industrial Estate, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 6 Nov 2023 at 11:02.

LONG TERM
Between
5 Feb and 24 Dec 2024
Details
View Map
Share
Follow
Paul Watson Way

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Paul Watson Way, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 16 Oct 2023 at 08:22.

LONG TERM
Between
5 Feb and 24 Dec 2024
Details
View Map
Share
Follow
Pallion New Road

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Pallion New Road, Pallion, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 16 Oct 2023 at 09:05.

LONG TERM
Until
21 Apr 2025
Details
View Map
Share
Follow
Harbour View

Sunderland City Council are carrying out Highway repair and maintenance works on Harbour View, Roker, Sunderland.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 08:00 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 23 Apr 2024 at 07:09.

LONG TERM
Between
29 Apr 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Washington Road

Sunderland City Council are proposing to carry out Highway improvement works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 12 December 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 23 Apr 2024 at 07:03.

LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Dame Dorothy Street

Sunderland City Council are carrying out Highway improvement works on Dame Dorothy Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 May 2024 at 08:50 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 27 Nov 2024 at 10:09.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Pallion New Road

Sunderland City Council are carrying out Highway improvement works on Pallion New Road, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 20 Nov 2024 at 07:59.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Mortimer Street

Sunderland City Council are carrying out Highway improvement works on Mortimer Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2024 at 08:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 8 Nov 2024 at 07:17.

South Tyneside Council logo
LONG TERM
Between
19 Aug and 6 Dec 2024
Details
View Map
Share
Follow
A1290 Washington Road Slip Roads East And West Of A19

South Tyneside Council are proposing to carry out Highway improvement works on A1290 Washington Road Slip Roads East And West Of A19, West Boldon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Tyneside Council on 16 Aug 2024 at 11:21.

South Tyneside Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
A1290 Washington Road Slip Roads East And West Of A19

South Tyneside Council are carrying out Highway improvement works on A1290 Washington Road Slip Roads East And West Of A19, West Boldon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 19 Aug 2024 at 08:03.

South Tyneside Council logo
LONG TERM
Between
19 Aug and 6 Dec 2024
Details
View Map
Share
Follow
A1290 Washington Road Slip Roads East And West Of A19

South Tyneside Council are proposing to carry out Highway improvement works on A1290 Washington Road Slip Roads East And West Of A19, West Boldon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Tyneside Council on 16 Aug 2024 at 10:55.

South Tyneside Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
A1290 Washington Road Slip Roads East And West Of A19

South Tyneside Council are carrying out Highway improvement works on A1290 Washington Road Slip Roads East And West Of A19, West Boldon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 19 Aug 2024 at 08:01.

South Tyneside Council logo
LONG TERM
Between
19 Aug and 6 Dec 2024
Details
View Map
Share
Follow
Downhill Lane

South Tyneside Council are proposing to carry out Highway improvement works on Downhill Lane, West Boldon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Tyneside Council on 16 Aug 2024 at 10:56.

South Tyneside Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Downhill Lane

South Tyneside Council are carrying out Highway improvement works on Downhill Lane, West Boldon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 19 Aug 2024 at 08:02.

LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Pallion New Road

Sunderland City Council are carrying out Highway improvement works on Pallion New Road, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 20 Nov 2024 at 08:00.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Exeter Street

Sunderland City Council are carrying out Highway improvement works on Exeter Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 08:30 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 07:12.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Scott Terrace West Rear

Sunderland City Council are carrying out Highway improvement works on Scott Terrace West Rear, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 07:48.

LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
European Way

Sunderland City Council are carrying out Highway improvement works on European Way, Pallion Industrial Estate, Sunderland.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 09:00 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 18 Sep 2024 at 09:44.

LONG TERM
Between
23 Sep and 10 Dec 2024
Details
View Map
Share
Pallion Subway

Sunderland City Council were proposing to carry out Highway improvement works on Pallion Subway, Pallion, Sunderland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 10 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 24 Sep 2024 at 09:20.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Caroline Street South Back

Sunderland City Council are carrying out Highway improvement works on Caroline Street South Back, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 09:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 07:48.

LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Stratfield Street

Sunderland City Council are proposing to carry out Highway improvement works on Stratfield Street, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sunderland City Council on 12 Aug 2024 at 11:37.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Victoria Street

Sunderland City Council are carrying out Highway improvement works on Victoria Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 15 Nov 2024 at 07:38.

LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Oxford Street

Sunderland City Council are carrying out Highway improvement works on Oxford Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 12:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 28 Oct 2024 at 10:35.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dipe Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dipe Lane, West Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Jun 2024 at 09:49.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
North Hylton Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on North Hylton Road, Southwick, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 24 Sep 2024 at 08:22.

Cityfibre Metro Networks logo
LONG TERM
Between
4 Nov and 11 Dec 2024
Details
View Map
Share
Browne Road North Back

Cityfibre Metro Networks were proposing to carry out Utility asset works on Browne Road North Back, Fulwell, Sunderland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Aug 2024 at 13:25.

Cityfibre Metro Networks logo
LONG TERM
Between
4 Nov and 11 Dec 2024
Details
View Map
Share
Winifred Street

Cityfibre Metro Networks were proposing to carry out Utility asset works on Winifred Street, Fulwell, Sunderland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Aug 2024 at 13:23.

Cityfibre Metro Networks logo
LONG TERM
Between
4 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Winifred Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Winifred Street, Fulwell, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Aug 2024 at 10:29.

Northern Gas Networks logo
LONG TERM
Between
11 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Rowan Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rowan Avenue, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 19 Jul 2024 at 10:40.

LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Thompson Road

Sunderland City Council are proposing to carry out Highway improvement works on Thompson Road, Monkwearmouth, Sunderland.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 5 Nov 2024 at 11:55.

LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Thompson Road

Sunderland City Council are carrying out Highway improvement works on Thompson Road, Monkwearmouth, Sunderland.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 13 Nov 2024 at 07:57.

LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Paul Watson Way

Sunderland City Council are carrying out Highway improvement works on Paul Watson Way, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 07:50 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 13 Nov 2024 at 07:57.

Cityfibre Metro Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hugh Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hugh Street, Fulwell, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Aug 2024 at 10:39.

Northern Gas Networks logo
Between
16 Nov and 12 Dec 2024
Details
View Map
Share
Knoulberry Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2024 and run through until 12 December 2024. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:07.

Northern Gas Networks logo
Between
16 Nov and 12 Dec 2024
Details
View Map
Share
Shunner Close

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Shunner Close, Blackfell, Washington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:07.

Northumbrian Water logo
LONG TERM
Between
18 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 3 Oct 2024 at 13:55.

Northumbrian Water logo
LONG TERM
Between
18 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 6 Nov 2024 at 13:44.

Northumbrian Water logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are carrying out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 08:18 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 19 Nov 2024 at 10:18.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Stone Cellar Road

Energy Assets Networks (formerly Utility Distribution Networks) are carrying out Utility asset works on Stone Cellar Road, Usworth, Washington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:35 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 22 Nov 2024 at 12:32.

Energy Assets Pipelines logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Stone Cellar Road

Energy Assets Pipelines are carrying out Utility asset works on Stone Cellar Road, Usworth, Washington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:35 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 22 Nov 2024 at 12:30.

Cityfibre Metro Networks logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Hugh Street North Back

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hugh Street North Back, Fulwell, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Aug 2024 at 12:49.

Cityfibre Metro Networks logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Ritson Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Ritson Street, Fulwell, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Aug 2024 at 12:50.

Cityfibre Metro Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Atkinson Road South Back

Cityfibre Metro Networks are proposing to carry out Utility asset works on Atkinson Road South Back, Fulwell, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Aug 2024 at 12:48.

LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Edwin Street

Sunderland City Council are proposing to carry out Highway improvement works on Edwin Street, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 06:20.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Edwin Street

Sunderland City Council are carrying out Highway improvement works on Edwin Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 09:03.

LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Stratfield Street

Sunderland City Council are proposing to carry out Highway improvement works on Stratfield Street, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 06:19.

LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Stratfield Street

Sunderland City Council are carrying out Highway improvement works on Stratfield Street, Pallion, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 09:03.

Northumbrian Water logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 26 Nov 2024 at 14:13.

Northumbrian Water logo
Until
20 Dec 2024
Details
View Map
Share
Follow
A194m From J A182/b1288 To J A195 Ne

Northumbrian Water are carrying out Utility repair and maintenance works on A194m From J A182/b1288 To J A195 Ne, Sunderland.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 25 Nov 2024 at 16:13.

Finishing
Monday
Details
View Map
Share
Follow
Cairns Road

Sunderland City Council are proposing to carry out Highway improvement works on Cairns Road, Fulwell, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 21 Nov 2024 at 13:59.

Finishing
Monday
Details
View Map
Share
Follow
Cairns Road

Sunderland City Council are carrying out Highway improvement works on Cairns Road, Fulwell, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 26 Nov 2024 at 09:07.

Northumbrian Water logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Washington Road

Northumbrian Water are carrying out Utility repair and maintenance works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 27 Nov 2024 at 08:55.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Rear 6 To 21 Ryhope Street South

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear 6 To 21 Ryhope Street South, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 25 Sep 2024 at 11:02.

Northumbrian Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Rear 6 To 21 Ryhope Street South

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear 6 To 21 Ryhope Street South, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Nov 2024 at 07:48.

Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Edwin Street West Back

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Edwin Street West Back, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 14 Nov 2024 at 08:08.

Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Edwin Street West Back

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Edwin Street West Back, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 14 Nov 2024 at 09:46.

Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
North View

Sunderland City Council are proposing to carry out Highway repair and maintenance works on North View, Concord, Washington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 26 Nov 2024 at 06:04.

Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
North View

Sunderland City Council are proposing to carry out Highway repair and maintenance works on North View, Concord, Washington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 26 Nov 2024 at 10:04.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Rowan Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Rowan Avenue, Harraton, Washington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 7 February 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 11:28.

Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Thornhill Gardens North Back

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Thornhill Gardens North Back, Ashbrooke, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 14 Nov 2024 at 08:11.

Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Thornhill Gardens North Back

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Thornhill Gardens North Back, Ashbrooke, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 14 Nov 2024 at 09:45.

Telefonica UK logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Hutton Street

Telefonica UK are proposing to carry out Utility asset works on Hutton Street, Boldon Colliery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 21 Aug 2024 at 16:00.

Telefonica UK logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Hutton Street

Telefonica UK are proposing to carry out Utility asset works on Hutton Street, Boldon Colliery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 21 Oct 2024 at 10:26.

Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Sea View Road

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Sea View Road, Grangetown, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 15 Nov 2024 at 13:34.

Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Sea View Road

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Sea View Road, Grangetown, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 19 Nov 2024 at 13:33.

Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Colchester Terrace West Back

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Colchester Terrace West Back, High Barnes, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 14 Nov 2024 at 08:10.

Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Colchester Terrace West Back

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Colchester Terrace West Back, High Barnes, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 18 Nov 2024 at 11:08.

Northumbrian Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Hunter Terrace West Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hunter Terrace West Back, Grangetown, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 19 Sep 2024 at 11:43.

Northumbrian Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Hunter Terrace West Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hunter Terrace West Back, Grangetown, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 27 Nov 2024 at 11:24.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:24.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:03.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Wilson Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Wilson Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:58.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:24.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:50.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Richmond Street

Sunderland City Council are proposing to carry out Highway improvement works on Richmond Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:24.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Richmond Street

Sunderland City Council are proposing to carry out Highway improvement works on Richmond Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:05.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:59.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street North

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Easington Street North

Sunderland City Council are proposing to carry out Highway improvement works on Easington Street North, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:00.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Brooke Street North Back

Sunderland City Council are proposing to carry out Highway improvement works on Brooke Street North Back, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 13:04.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Stobart Street

Sunderland City Council are proposing to carry out Highway improvement works on Stobart Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 2 Oct 2024 at 17:25.

LONG TERM
Between
1 Jan and 30 Sep 2025
Details
View Map
Share
Follow
Stobart Street

Sunderland City Council are proposing to carry out Highway improvement works on Stobart Street, Monkwearmouth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 8 Oct 2024 at 12:59.

Northumbrian Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Saint Oswalds Terrace South Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Saint Oswalds Terrace South Back, Shiney Row, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 27 Sep 2024 at 13:41.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rowan Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rowan Avenue, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 12:21.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 19 Jul 2024 at 10:37.

Northern Gas Networks logo
Between
6 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Hylton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hylton Road, Millfield, Sunderland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 12:42.

Northern Gas Networks logo
Between
6 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Hylton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hylton Road, Millfield, Sunderland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 12:25.

Northumbrian Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Knoulberry Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Knoulberry Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 23 Oct 2024 at 11:45.

LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Stratfield Street

Sunderland City Council are proposing to carry out Highway improvement works on Stratfield Street, Pallion, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 22 Oct 2024 at 13:51.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Mount Lane

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Mount Lane, Springwell, Gateshead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 14:14.

LONG TERM
Between
6 Jan and 23 May 2025
Details
View Map
Share
Follow
Pier View

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Pier View, Roker, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 10 Jun 2024 at 09:49.

LONG TERM
Between
6 Jan and 23 May 2025
Details
View Map
Share
Follow
Roker Terrace

Sunderland City Council are proposing to carry out Highway repair and maintenance works on Roker Terrace, Roker, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sunderland City Council on 10 Jun 2024 at 09:11.

Energy Assets Networks (formerly Utility Distribution Networks) logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Stone Cellar Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Stone Cellar Road, Usworth, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 16 Oct 2024 at 13:51.

Northern Powergrid (Northeast) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
John Street

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on John Street, Hetton-le-hole, Houghton-le-spring.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Oct 2024 at 08:16.

Northern Powergrid (Northeast) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
John Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on John Street, Hetton-le-hole, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:14.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Front Street South Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Front Street South Back, Fence Houses, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 07:09.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Front Street South Back

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Front Street South Back, Fence Houses, Houghton-le-spring.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 12 Nov 2024 at 15:07.

Northumbrian Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Cheviot Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Cheviot Lane, Ryhope, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 3 Oct 2024 at 06:14.

Northern Powergrid (Northeast) logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Back Ryhope Street

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Back Ryhope Street, Ryhope, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 Oct 2024 at 09:55.

Energy Assets Pipelines logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Stone Cellar Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Stone Cellar Road, Usworth, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 16 Oct 2024 at 13:48.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lambton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Lambton Lane, New Lambton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Oct 2024 at 13:36.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Maria Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Maria Street, Silksworth, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 22 Oct 2024 at 11:52.

Northumbrian Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Grasmere Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Grasmere Terrace, Columbia, Washington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 10 Oct 2024 at 14:03.

Northumbrian Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Noble Street North Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Noble Street North Back, Hendon, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 22 Oct 2024 at 13:52.

Northern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Vigo Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Vigo Lane, Harraton, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 14:00.

Northumbrian Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Beckenham Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Beckenham Avenue, East Boldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 11:19.

Northumbrian Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Beckenham Avenue

Northumbrian Water were proposing to carry out Utility repair and maintenance works on Beckenham Avenue, East Boldon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 10:08.

Northumbrian Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Cambria Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Cambria Street, South Hylton, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 13:33.

Northern Gas Networks logo
Between
18 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Wilson Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Street, Millfield, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 12:02.

Northern Gas Networks logo
Between
18 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Wilson Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Street, Millfield, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 11:24.

Northern Gas Networks logo
Between
22 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Hylton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hylton Road, Millfield, Sunderland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 11:21.

Northern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Hylton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hylton Road, Millfield, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 09:10.

Northern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Hylton Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hylton Road, Millfield, Sunderland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 25 Oct 2024 at 11:58.

Northern Gas Networks logo
Between
24 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Wilson Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilson Street, Millfield, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 09:11.


Roadworks Map near to Northland Close, SUNDERLAND, SR4 9RZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 18:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Northland Close, SUNDERLAND, SR4 9RZ (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Gas Networks logo
GREENWOOD ROAD, GRINDON 
(0.3 miles)
Northern Gas Networks
Utility repair and maintenance works - Carriageway, Verge - Some carriageway incursion
In Progress
Since: 25 Nov 2024 10:37
(Scheduled: 25 Nov 2024 - 29 Nov 2024)
0.3
Details
Share
Follow
2
Northern Gas Networks logo
GREENWOOD ROAD, GRINDON 
(0.3 miles)
Northern Gas Networks
Utility repair and maintenance works - Verge - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 29 Nov 2024
0.3
Details
Share
Follow
3
URGENT
  
THORNDALE ROAD, THORNEY CLOSE 
(0.4 miles)
Sunderland City Council
Highway repair and maintenance works - Footway, Carriageway - No carriageway incursion
Complete
27 Nov 2024 13:00 - 13:54
0.4
Details
Share
4
Northern Powergrid (Northeast) logo
PALMERSTON ROAD, PENNYWELL 
(0.5 miles)
Northern Powergrid (Northeast)
New service connection - Footway, Carriageway -
In Progress
Since: 21 Nov 2024 09:55
(Scheduled: 20 Nov 2024 - 27 Nov 2024)
0.5
Details
Share
Follow
5
Virgin Media logo
SOMERSET ROAD, SPRINGWELL ESTATE 
(0.6 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 27 Nov 2024 11:47
(Scheduled: 26 Nov 2024 - 29 Nov 2024)
0.6
Details
Share
Follow
6
Northumbrian Water logo
TELFORD ROAD, THORNEY CLOSE 
(0.6 miles)
Northumbrian Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
Complete
21 Nov 2024 08:39 - 27 Nov 2024 08:54
0.6
Details
Share
7
Northern Powergrid (Northeast) logo
BECKWITH ROAD, MIDDLE HERRINGTON 
(0.7 miles)
Northern Powergrid (Northeast)
Utility asset works - Footway, Carriageway -
In Progress
Since: 25 Nov 2024 09:55
(Scheduled: 25 Nov 2024 - 29 Nov 2024)
0.7
Details
Share
Follow
8
Northern Powergrid (Northeast) logo
BECKWITH ROAD, MIDDLE HERRINGTON 
(0.7 miles)
Northern Powergrid (Northeast)
Utility asset works - Footway, Carriageway -
Cancelled
(Scheduled: 25 Nov 2024 - 29 Nov 2024)
0.7
Details
Share
9
Northumbrian Water logo
URGENT
  
SUTHERLAND DRIVE 
(0.7 miles)
Northumbrian Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 26 Nov 2024 10:33
(Scheduled: 26 Nov 2024 - 2 Dec 2024)
0.7
Details
Share
Follow
10
Northumbrian Water logo
SUNNINGDALE ROAD, SPRINGWELL ESTATE 
(0.8 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 27 Nov 2024 09:30
(Scheduled: 27 Nov 2024 - 28 Nov 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.