ROADWORKS SUMMARY
Summer Oaks, SHAFTESBURY, SP7 9NW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Summer Oaks, SP7 9NW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Summer Oaks, SHAFTESBURY, SP7 9NW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Summer Oaks are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Electricity Network Company logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Common Mead Lane To Sewage Works - Access Road

Electricity Network Company are carrying out Utility repair and maintenance works on Common Mead Lane To Sewage Works - Access Road, Gillingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2024 at 12:00 and could run through until 31 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 16 Jan 2024 at 12:49.

Electricity Network Company logo
LONG TERM
Until
3 Jun 2024
Details
View Map
Share
Follow
Bleet Lane

Electricity Network Company are carrying out Utility repair and maintenance works on Bleet Lane, Gillingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2024 at 12:00 and could run through until 3 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 16 Jan 2024 at 12:51.

Electricity Network Company logo
LONG TERM
Until
3 Jun 2024
Details
View Map
Share
Follow
Nations Road To Bleet Lane - Road

Electricity Network Company are carrying out Utility repair and maintenance works on Nations Road To Bleet Lane - Road, Eccliffe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2024 at 12:00 and could run through until 3 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 16 Jan 2024 at 12:42.

Electricity Network Company logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Common Mead Lane

Electricity Network Company are carrying out Utility repair and maintenance works on Common Mead Lane, Gillingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 11:30 and could run through until 31 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 26 Mar 2024 at 16:05.

Electricity Network Company logo
LONG TERM
Until
3 Jun 2024
Details
View Map
Share
Follow
Bleet Lane To New Road

Electricity Network Company are carrying out Utility repair and maintenance works on Bleet Lane To New Road, Madjeston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2024 at 12:00 and could run through until 3 June 2024. The works will impact the verge only.

This roadwork event was last updated by Electricity Network Company on 20 Mar 2024 at 10:05.

Electricity Network Company logo
LONG TERM
Until
3 Jun 2024
Details
View Map
Share
Follow
Bleet Lane

Electricity Network Company are carrying out Utility repair and maintenance works on Bleet Lane, Gillingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2024 at 12:00 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 16 Jan 2024 at 12:45.

Electricity Network Company logo
LONG TERM
Until
3 Jun 2024
Details
View Map
Share
Follow
Cole Street Lane

Electricity Network Company are carrying out Utility repair and maintenance works on Cole Street Lane, East Stour.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2024 at 12:00 and could run through until 3 June 2024. The works will impact the cycleway only.

This roadwork event was last updated by Electricity Network Company on 16 Jan 2024 at 12:43.

Southern Gas Networks logo
LONG TERM
Between
25 Mar and 28 Jun 2024
Details
View Map
Share
Follow
Shaftesbury Road

Southern Gas Networks are proposing to carry out Works for Rail Purposes on Shaftesbury Road, Gillingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 Feb 2024 at 09:02.

Southern Gas Networks logo
LONG TERM
Between
25 Mar and 28 Jun 2024
Details
View Map
Share
Follow
Shaftesbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shaftesbury Road, Gillingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 Feb 2024 at 09:11.

G2 Energy IDNO logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Shaftesbury Road

G2 Energy IDNO are carrying out New service connection on Shaftesbury Road, Motcombe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 12:15 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 10 Apr 2024 at 14:35.

G2 Energy IDNO logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Turnpike Road

G2 Energy IDNO are proposing to carry out roadworks on Turnpike Road, Motcombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 17 Nov 2023 at 16:05.

Southern Gas Networks logo
LONG TERM
Between
1 Apr and 10 May 2024
Details
View Map
Share
Follow
Barnaby Mead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnaby Mead, Gillingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 10 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2024 at 12:41.

G2 Energy IDNO logo
Between
27 Apr and 27 May 2024
Details
View Map
Share
Follow
Lox Lane

G2 Energy IDNO are proposing to carry out roadworks on Lox Lane, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 17 Nov 2023 at 16:16.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Bridewell Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Bridewell Lane, Motcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 4 Apr 2024 at 16:10.

Dorset Council logo
LONG TERM
Between
5 May and 21 Jun 2024
Details
View Map
Share
Follow
Common Mead Lane

Dorset Council are proposing to carry out Highway improvement works on Common Mead Lane, Gillingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 24 Apr 2024 at 15:16.

Dorset Council logo
Between
7 and 11 May 2024
Details
View Map
Share
Follow
Ivy Cross Roundabout

Dorset Council are proposing to carry out Highway improvement works on Ivy Cross Roundabout, Shaftesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 20 Mar 2024 at 10:20.

Dorset Council logo
Between
7 and 11 May 2024
Details
View Map
Share
Follow
Ivy Cross Roundabout

Dorset Council are proposing to carry out Highway improvement works on Ivy Cross Roundabout, Shaftesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 21 Feb 2024 at 13:50.

Southern Gas Networks logo
Between
7 and 31 May 2024
Details
View Map
Share
Follow
Peacemarsh Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peacemarsh Road, Gillingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 31 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2024 at 16:22.

Scottish Hydro Electric Power Dis logo
Between
13 and 15 May 2024
Details
View Map
Share
Follow
Berry Wood Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Berry Wood Lane, Donhead St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Apr 2024 at 11:13.

Wessex Water logo
Between
13 and 17 May 2024
Details
View Map
Share
Follow
Haimes Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Haimes Lane, Shaftesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 11 Mar 2024 at 10:05.

Dorset Council logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Church Road

Dorset Council are proposing to carry out Utility repair and maintenance works on Church Road, Silton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 8 Apr 2024 at 10:40.

Wiltshire Council logo
Between
28 and 31 May 2024
Details
View Map
Share
Follow
Park Corner Farm East C305 To Wise Lane

Wiltshire Council are proposing to carry out Highway improvement works on Park Corner Farm East C305 To Wise Lane, Underhill, East Knoyle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 10 Apr 2024 at 11:35.

Dorset Council logo
Between
30 May and 1 Jun 2024
Details
View Map
Share
Follow
Huntingford Road

Dorset Council are proposing to carry out Utility repair and maintenance works on Huntingford Road, Huntingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 8 Apr 2024 at 10:40.

Wiltshire Council logo
Between
31 May and 4 Jun 2024
Details
View Map
Share
Follow
A350 East Knoyle Bypass

Wiltshire Council are proposing to carry out Highway repair and maintenance works on A350 East Knoyle Bypass, East Knoyle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 28 Mar 2024 at 11:30.

Wessex Water logo
Between
2 and 4 Jun 2024
Details
View Map
Share
Follow
Berry Wood Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Berry Wood Lane, Donhead St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 10 Apr 2024 at 12:26.

Wiltshire Council logo
Between
3 and 7 Jun 2024
Details
View Map
Share
Follow
Mere Park

Wiltshire Council are proposing to carry out Highway improvement works on Mere Park, Mere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 25 Apr 2024 at 16:13.

Wiltshire Council logo
Between
3 and 7 Jun 2024
Details
View Map
Share
Follow
Park Corner Farm North C297 To The Street West Knoyle

Wiltshire Council are proposing to carry out Highway improvement works on Park Corner Farm North C297 To The Street West Knoyle, West Knoyle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 25 Apr 2024 at 16:10.

Dorset Council logo
Between
6 and 11 Jun 2024
Details
View Map
Share
Follow
Front Street

Dorset Council are proposing to carry out Highway improvement works on Front Street, East Stour.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2024 and could run through until 11 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 4 Jan 2024 at 16:35.

Wessex Water logo
Between
17 and 19 Jun 2024
Details
View Map
Share
Follow
Frog Lane

Wessex Water are proposing to carry out New service connection on Frog Lane, Motcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 28 Mar 2024 at 16:10.

Wiltshire Council logo
Between
1 and 12 Jul 2024
Details
View Map
Share
Follow
Share Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Share Lane, Tisbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 12 July 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 25 Apr 2024 at 16:14.

Dorset Council logo
Between
4 and 18 Jul 2024
Details
View Map
Share
Follow
Buddens Lane

Dorset Council are proposing to carry out Highway improvement works on Buddens Lane, West Melbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 23 Apr 2024 at 11:15.

Dorset Council logo
Between
4 and 18 Jul 2024
Details
View Map
Share
Follow
Crockers Farm Lane To Buddens Lane

Dorset Council are proposing to carry out Highway improvement works on Crockers Farm Lane To Buddens Lane, Twyford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 23 Apr 2024 at 11:15.

Southern Gas Networks logo
Between
7 and 11 Jul 2024
Details
View Map
Share
Follow
Victoria Street

Southern Gas Networks are proposing to carry out New service connection on Victoria Street, Shaftesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2024 at 09:34.

Dorset Council logo
Between
7 and 19 Jul 2024
Details
View Map
Share
Follow
Lower Blandford Road

Dorset Council are proposing to carry out Highway improvement works on Lower Blandford Road, Shaftesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 23 Apr 2024 at 11:20.

Dorset Council logo
Between
8 and 22 Jul 2024
Details
View Map
Share
Follow
Common Mead Lane

Dorset Council are proposing to carry out Highway improvement works on Common Mead Lane, Gillingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 23 Apr 2024 at 11:20.

Southern Gas Networks logo
LONG TERM
Between
8 Jul and 11 Oct 2024
Details
View Map
Share
Follow
Shaftesbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shaftesbury Road, Gillingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 11 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2024 at 09:01.

Dorset Council logo
Between
8 and 22 Jul 2024
Details
View Map
Share
Follow
Cole Street Lane

Dorset Council are proposing to carry out Highway improvement works on Cole Street Lane, East Stour.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 23 Apr 2024 at 11:20.


Roadworks Map near to Summer Oaks, SHAFTESBURY, SP7 9NW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Apr 2024 07:08
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Summer Oaks, SHAFTESBURY, SP7 9NW (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wessex Water logo
MAJOR
  
BRIDEWELL LANE 
(0.9 miles)
Wessex Water
Utility repair and maintenance works - Carriageway, Verge - Road closure
Planned
Scheduled: 29 Apr 2024 - 3 May 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.