ROADWORKS SUMMARY
Holders Road, SALISBURY, SP4 7PH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Holders Road, SP4 7PH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Holders Road, SALISBURY, SP4 7PH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Holders Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
13 Jul 2024
Details
View Map
Share
Follow
A360 Camp Hill Crossroads North To Stoford Bush Crossroads

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on A360 Camp Hill Crossroads North To Stoford Bush Crossroads, South Newton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 10:45 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Apr 2024 at 11:28.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
12 Jul 2024
Details
View Map
Share
Follow
A360 Stoford Bush Crossroads North To Druids Lodge

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on A360 Stoford Bush Crossroads North To Druids Lodge, Druids Lodge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 10:45 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Apr 2024 at 11:28.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
13 Jul 2024
Details
View Map
Share
Follow
A360 Druids Lodge North To Longbarrow Roundabout

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on A360 Druids Lodge North To Longbarrow Roundabout, Berwick St James.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 10:45 and could run through until 13 July 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Apr 2024 at 11:28.

Southern Gas Networks logo
LONG TERM
Between
15 Apr and 24 May 2024
Details
View Map
Share
Follow
Allington Track

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Allington Track, Allington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 24 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Mar 2024 at 08:31.

National Highways logo
LONG TERM
Between
13 May and 6 Jul 2024
Details
View Map
Share
Follow
B3086 Airmens Corner North To The Packway

National Highways are proposing to carry out Highway repair and maintenance works on B3086 Airmens Corner North To The Packway, Winterbourne Stoke.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 6 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Mar 2024 at 15:28.

Wessex Water logo
Between
27 and 29 May 2024
Details
View Map
Share
Follow
Newton Toney Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Newton Toney Road, Allington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 18 Apr 2024 at 14:49.

Wessex Water logo
Between
27 and 29 May 2024
Details
View Map
Share
Follow
Wyndham Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Wyndham Lane, Allington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 18 Apr 2024 at 14:48.

Wiltshire Council logo
Between
10 and 21 Jun 2024
Details
View Map
Share
Follow
Chapel At Netton East C292 To High Post Road

Wiltshire Council are proposing to carry out Highway improvement works on Chapel At Netton East C292 To High Post Road, Netton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 21 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 22 Mar 2024 at 15:24.

Wiltshire Council logo
Between
10 and 21 Jun 2024
Details
View Map
Share
Follow
High Post Road

Wiltshire Council are proposing to carry out Highway improvement works on High Post Road, Netton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 21 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 22 Mar 2024 at 15:30.


Roadworks Map near to Holders Road, SALISBURY, SP4 7PH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Apr 2024 14:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Holders Road, SALISBURY, SP4 7PH (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.