ROADWORKS SUMMARY
High Street, SOUTHAMPTON, SO40 9HN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for High Street, SO40 9HN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to High Street, SOUTHAMPTON, SO40 9HN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for High Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southampton City Council logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Cleasby Close Footpath

Southampton City Council are carrying out Highway improvement works on Cleasby Close Footpath, Millbrook, Southampton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2024 at 17:19 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 30 Sep 2024 at 16:24.

Southampton City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Redbridge Roundabout Footpaths

Southampton City Council are carrying out Highway improvement works on Redbridge Roundabout Footpaths, Redbridge, Southampton.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 28 May 2024 at 00:00 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Southampton City Council on 25 Nov 2024 at 12:28.

Southern Water logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Princes Crescent

Southern Water are carrying out Utility repair and maintenance works on Princes Crescent, Lyndhurst.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2024 at 23:30 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 12 Dec 2024 at 10:12.

Southampton City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Havelock Road

Southampton City Council are carrying out Highway repair and maintenance works on Havelock Road, Bargate, Southampton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 11:50 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 13 Dec 2024 at 15:21.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Aldermoor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Aldermoor Road, Coxford, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2024 at 16:05.

Southampton City Council logo
LONG TERM
Between
23 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Bevois Hill

Southampton City Council are proposing to carry out Highway improvement works on Bevois Hill, Bevois, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 5 Aug 2024 at 10:07.

Southampton City Council logo
LONG TERM
Between
23 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are proposing to carry out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 5 Aug 2024 at 10:07.

Southampton City Council logo
LONG TERM
Between
23 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Thomas Lewis Way

Southampton City Council are proposing to carry out Highway improvement works on Thomas Lewis Way, Portswood, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 5 Aug 2024 at 10:07.

Southampton City Council logo
LONG TERM
Between
23 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 5 Aug 2024 at 10:07.

Network Rail logo
LONG TERM
Between
28 Sep 2024 and 28 Feb 2025
Details
View Map
Share
Priory Road

Network Rail were proposing to carry out Works for Rail Purposes on Priory Road, Portswood, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2024 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Aug 2024 at 16:52.

Southampton City Council logo
LONG TERM
Between
30 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Bevois Hill

Southampton City Council are proposing to carry out Highway improvement works on Bevois Hill, Bevois, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 22 Aug 2024 at 14:05.

Southampton City Council logo
LONG TERM
Between
30 Sep and 31 Dec 2024
Details
View Map
Share
Lodge Road

Southampton City Council were proposing to carry out Highway improvement works on Lodge Road, Bevois, Southampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 22 Aug 2024 at 14:05.

Southampton City Council logo
LONG TERM
Between
30 Sep and 31 Dec 2024
Details
View Map
Share
Thomas Lewis Way

Southampton City Council were proposing to carry out Highway improvement works on Thomas Lewis Way, Portswood, Southampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 22 Aug 2024 at 14:11.

Southampton City Council logo
LONG TERM
Between
30 Sep and 31 Dec 2024
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 22 Aug 2024 at 14:11.

Southampton City Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Bevois Valley Road

Southampton City Council are carrying out Highway improvement works on Bevois Valley Road, Bevois, Southampton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 6 Dec 2024 at 14:59.

Southampton City Council logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Bevois Hill

Southampton City Council are carrying out Highway improvement works on Bevois Hill, Bevois, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 17 Dec 2024 at 15:48.

Southampton City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are carrying out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 12 Dec 2024 at 13:26.

Southampton City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are carrying out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 12 Dec 2024 at 13:24.

Southampton City Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Lawn Road

Southampton City Council are proposing to carry out Highway improvement works on Lawn Road, Portswood, Southampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southampton City Council on 1 Oct 2024 at 16:22.

Southampton City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are carrying out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 12 Dec 2024 at 13:25.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
15 Oct 2024 and 25 Mar 2025
Details
View Map
Share
Toothill Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Toothill Road, Toothill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2024 and run through until 25 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Oct 2024 at 12:51.

Southern Gas Networks logo
LONG TERM
Until
27 Jan 2025
Details
View Map
Share
Follow
Dale Valley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Dale Valley Road, Bassett, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 15:00 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 14:51.

Hampshire County Council logo
LONG TERM
Between
30 Oct 2024 and 10 Apr 2025
Details
View Map
Share
Junction Road

Hampshire County Council were proposing to carry out Highway repair and maintenance works on Junction Road, Totton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 10 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 13 Dec 2024 at 09:32.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Salisbury Road, Totton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 11:33 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 16:05.

Southern Gas Networks logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Redbridge Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Redbridge Road, Redbridge, Southampton.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 November 2024 at 10:29 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 11:56.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Upton Lane

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Upton Lane, Nursling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 23 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 09:16.

Southern Water logo
LONG TERM
Between
19 Nov 2024 and 21 Feb 2025
Details
View Map
Share
Pauncefoot Hill

Southern Water were proposing to carry out Utility repair and maintenance works on Pauncefoot Hill, Romsey.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Aug 2024 at 15:23.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:25.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are carrying out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 19:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 09:26.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are proposing to carry out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:11.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Romsey Road

Hampshire County Council are carrying out Highway improvement works on Romsey Road, Nursling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 19:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 09:25.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Horns Drove

Hampshire County Council are proposing to carry out Highway improvement works on Horns Drove, Rownhams.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:29.

Hampshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Horns Drove

Hampshire County Council are carrying out Highway improvement works on Horns Drove, Rownhams.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 19:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 09:26.

Southern Water logo
Finishing
Friday
Details
View Map
Share
Follow
Kent Road

Southern Water are carrying out Utility repair and maintenance works on Kent Road, Portswood, Southampton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 08:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 12 Dec 2024 at 10:39.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
9 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Cracknore Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cracknore Road, Freemantle, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Nov 2024 at 12:17.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
9 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Cracknore Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cracknore Road, Freemantle, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 11:34.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
3 Feb 2025
Details
View Map
Share
Follow
Cracknore Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Cracknore Road, Freemantle, Southampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:00 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 08:37.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
9 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Cracknore Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cracknore Road, Freemantle, Southampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 13:25.

Scottish Hydro Electric Power Dis logo
Finishing
Today
Details
View Map
Share
Follow
Holly Hill/golf Course Road Footpath

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Holly Hill/golf Course Road Footpath, Bassett, Southampton.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Oct 2024 at 11:54.

Scottish Hydro Electric Power Dis logo
Finishing
Today
Details
View Map
Share
Follow
Holly Hill/golf Course Road Footpath

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Holly Hill/golf Course Road Footpath, Bassett, Southampton.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 9 December 2024 at 08:30 and could run through until 18 December 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 09:39.

Southampton City Council logo
Finishing
Today
Details
View Map
Share
Cobden Bridge

Southampton City Council were proposing to carry out Highway improvement works on Cobden Bridge, Bitterne Park, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 16 Dec 2024 at 10:22.

Southern Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Kent Road

Southern Water are carrying out Utility repair and maintenance works on Kent Road, Portswood, Southampton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 10:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 11 Dec 2024 at 11:31.

Southampton City Council logo
LONG TERM
Between
13 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Belmont Road

Southampton City Council are proposing to carry out Highway improvement works on Belmont Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 28 Nov 2024 at 09:33.

Southern Gas Networks logo
Until
6 Jan 2025
Details
View Map
Share
Follow
Aster Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Aster Road, Swaythling, Southampton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 December 2024 at 19:40 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 09:24.

Southampton City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are proposing to carry out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 11 Dec 2024 at 16:00.

Southampton City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are carrying out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 17 Dec 2024 at 11:49.

Southampton City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are proposing to carry out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 11 Dec 2024 at 16:01.

Southampton City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Lodge Road

Southampton City Council are carrying out Highway improvement works on Lodge Road, Bevois, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 17 Dec 2024 at 11:48.

Southampton City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 11 Dec 2024 at 16:01.

Southampton City Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are carrying out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 17 Dec 2024 at 11:49.

Southampton City Council logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Osborne Road South

Southampton City Council are proposing to carry out Highway improvement works on Osborne Road South, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 12 Dec 2024 at 11:28.

Southampton City Council logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Thomas Lewis Way

Southampton City Council were proposing to carry out Highway improvement works on Thomas Lewis Way, Portswood, Southampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 12 Dec 2024 at 11:28.

Network Rail logo
Between
24 and 27 Dec 2024
Details
View Map
Share
Follow
Mount Pleasant Road

Network Rail are proposing to carry out Works for Rail Purposes on Mount Pleasant Road, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Jun 2024 at 09:00.

Network Rail logo
Between
24 and 27 Dec 2024
Details
View Map
Share
Follow
Mount Pleasant Road

Network Rail are proposing to carry out Works for Rail Purposes on Mount Pleasant Road, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Nov 2024 at 12:18.

Hampshire County Council logo
Between
27 and 31 Dec 2024
Details
View Map
Share
Follow
Franconia Drive

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Franconia Drive, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 26 Nov 2024 at 13:42.

Hampshire County Council logo
Between
27 and 31 Dec 2024
Details
View Map
Share
Follow
Franconia Drive

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Franconia Drive, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 10:58.

Hampshire County Council logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Spicers Hill

Hampshire County Council are proposing to carry out Highway improvement works on Spicers Hill, Totton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 5 Dec 2024 at 15:34.

Hampshire County Council logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Main Road

Hampshire County Council are proposing to carry out Highway improvement works on Main Road, Totton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 5 Dec 2024 at 15:39.

Southern Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Lyon Street

Southern Water are proposing to carry out Utility repair and maintenance works on Lyon Street, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 4 Dec 2024 at 10:11.

Southampton City Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
The Avenue

Southampton City Council were proposing to carry out Highway improvement works on The Avenue, Shirley, Southampton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 27 Nov 2024 at 10:17.

Hampshire County Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Winsor Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Winsor Road, Winsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Hampshire County Council on 22 Nov 2024 at 14:50.

Southampton City Council logo
Between
6 and 28 Jan 2025
Details
View Map
Share
Follow
Russell Place

Southampton City Council are proposing to carry out Highway improvement works on Russell Place, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 11 Dec 2024 at 10:08.

Southampton City Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Portswood Road

Southampton City Council were proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 18 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 13 Nov 2024 at 11:43.

Southampton City Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 14 Nov 2024 at 08:31.

Southampton City Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
St Denys Road

Southampton City Council were proposing to carry out Highway improvement works on St Denys Road, Portswood, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 4 Oct 2024 at 10:55.

Southampton City Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
St Denys Road

Southampton City Council are proposing to carry out Highway improvement works on St Denys Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 11 Oct 2024 at 16:20.

Southampton City Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Brookvale Road

Southampton City Council are proposing to carry out Highway improvement works on Brookvale Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 3 Oct 2024 at 12:10.

Southern Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Bowden Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Bowden Lane, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 27 Sep 2024 at 08:45.

Southern Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Bowden Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Bowden Lane, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 16 Oct 2024 at 10:50.

National Highways logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Hill Street

National Highways are proposing to carry out Works for road purposes on Hill Street, Calmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 7 Oct 2024 at 10:57.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Rownhams Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Oct 2024 at 10:39.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Rownhams Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Oct 2024 at 16:23.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Romsey Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Romsey Road, Nursling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 14:37.

Southern Water logo
Between
7 and 21 Jan 2025
Details
View Map
Share
New Road

Southern Water were proposing to carry out Utility repair and maintenance works on New Road, Bargate, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 7 Nov 2024 at 11:45.

Hampshire County Council logo
Between
8 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Hampshire County Council are proposing to carry out Section 50 on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 16 Dec 2024 at 09:20.

Southern Water logo
Between
8 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 10 Oct 2024 at 13:02.

Southern Water logo
Between
8 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 10 Oct 2024 at 14:52.

Murphy Power Distribution logo
LONG TERM
Between
8 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Murphy Power Distribution are proposing to carry out New service connection on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 24 Nov 2024 at 14:56.

Murphy Power Distribution logo
LONG TERM
Between
8 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Murphy Power Distribution are proposing to carry out New service connection on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 28 Nov 2024 at 10:52.

Southampton City Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 27 Nov 2024 at 15:51.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Main Road

Network Rail are proposing to carry out Works for Rail Purposes on Main Road, Marchwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 21 Oct 2024 at 09:22.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Harbour Parade

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Harbour Parade, Bargate, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 14:36.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Harbour Parade

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Harbour Parade, Bargate, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Dec 2024 at 13:02.

Southampton City Council logo
Between
20 and 27 Jan 2025
Details
View Map
Share
Follow
Brookvale Road

Southampton City Council are proposing to carry out Highway improvement works on Brookvale Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 11 Dec 2024 at 14:58.

Southern Water logo
LONG TERM
Between
20 Jan and 20 Mar 2025
Details
View Map
Share
Vincent Avenue

Southern Water were proposing to carry out Utility repair and maintenance works on Vincent Avenue, Bassett, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Dec 2024 at 13:18.

Southern Water logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Vincent Avenue

Southern Water are proposing to carry out Utility repair and maintenance works on Vincent Avenue, Bassett, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 5 Dec 2024 at 10:41.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Redbridge Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redbridge Lane, Nursling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Aug 2024 at 14:50.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
20 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Packridge Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Packridge Lane, Toothill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Dec 2024 at 12:41.

Hampshire County Council logo
Between
23 and 29 Jan 2025
Details
View Map
Share
Follow
Mainstone

Hampshire County Council are proposing to carry out Highway improvement works on Mainstone, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 2 Dec 2024 at 12:30.

Hampshire County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Mainstone

Hampshire County Council are proposing to carry out Highway improvement works on Mainstone, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 15:01.

Hampshire County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Mainstone

Hampshire County Council are proposing to carry out Highway improvement works on Mainstone, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 10:41.

Hampshire County Council logo
Between
23 and 29 Jan 2025
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 2 Dec 2024 at 12:30.

Hampshire County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 15:02.

Hampshire County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 11:24.

Hampshire County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 15:03.

Hampshire County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 10:41.

Hampshire County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 15:02.

Hampshire County Council logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 11:24.

Hampshire County Council logo
Between
24 and 30 Jan 2025
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 2 Dec 2024 at 12:30.

Hampshire County Council logo
Between
24 and 30 Jan 2025
Details
View Map
Share
Follow
Romsey By-pass

Hampshire County Council are proposing to carry out Highway improvement works on Romsey By-pass, Romsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 2 Dec 2024 at 12:30.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Clovelly Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Clovelly Road, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 15:56.

Hampshire County Council logo
Between
28 Jan and 6 Feb 2025
Details
View Map
Share
Rownhams Lane

Hampshire County Council were proposing to carry out Highway improvement works on Rownhams Lane, Rownhams.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 14:30.

Hampshire County Council logo
Between
28 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Rownhams Lane

Hampshire County Council are proposing to carry out Highway improvement works on Rownhams Lane, Rownhams.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 16:25.

Hampshire County Council logo
Between
28 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Rownhams Lane

Hampshire County Council are proposing to carry out Highway improvement works on Rownhams Lane, Rownhams.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 12:08.

Hampshire County Council logo
Between
28 Jan and 6 Feb 2025
Details
View Map
Share
Rownhams Lane

Hampshire County Council were proposing to carry out Highway improvement works on Rownhams Lane, North Baddesley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 14:30.

Hampshire County Council logo
Between
28 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Rownhams Lane

Hampshire County Council are proposing to carry out Highway improvement works on Rownhams Lane, North Baddesley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 3 Dec 2024 at 16:25.

Hampshire County Council logo
Between
28 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Rownhams Lane

Hampshire County Council are proposing to carry out Highway improvement works on Rownhams Lane, North Baddesley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 11:25.

Scottish Hydro Electric Power Dis logo
Between
29 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Queens Parade

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Queens Parade, Lyndhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Sep 2024 at 12:41.

Scottish Hydro Electric Power Dis logo
Between
29 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Forest Gardens

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Forest Gardens, Lyndhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 13:11.

Southampton City Council logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Lake Road

Southampton City Council were proposing to carry out Highway improvement works on Lake Road, Woolston, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 7 Nov 2024 at 11:47.

Hampshire County Council logo
LONG TERM
Between
3 Feb and 1 Apr 2025
Details
View Map
Share
Commercial Road

Hampshire County Council were proposing to carry out Highway improvement works on Commercial Road, Totton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 1 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hampshire County Council on 13 Dec 2024 at 09:34.

Southampton City Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Shirley Avenue

Southampton City Council are proposing to carry out Highway repair and maintenance works on Shirley Avenue, Shirley, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 6 Dec 2024 at 14:42.

Southampton City Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Shirley Avenue

Southampton City Council are proposing to carry out Highway repair and maintenance works on Shirley Avenue, Shirley, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 10 Dec 2024 at 11:08.

Hampshire County Council logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 09:32.

Hampshire County Council logo
LONG TERM
Between
3 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Nursling Street

Hampshire County Council are proposing to carry out Highway improvement works on Nursling Street, Nursling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 12:13.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
7 Feb and 18 Jul 2025
Details
View Map
Share
Follow
Toothill Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Toothill Road, Toothill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Dec 2024 at 09:59.

Murphy Gas Networks logo
Between
8 and 15 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Murphy Gas Networks are proposing to carry out New service connection on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 2 Dec 2024 at 11:24.

Murphy Gas Networks logo
Between
8 and 15 Feb 2025
Details
View Map
Share
Follow
Whartons Lane

Murphy Gas Networks are proposing to carry out New service connection on Whartons Lane, Ashurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 2 Dec 2024 at 12:05.

Southern Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Villiers Road

Southern Water are proposing to carry out Utility repair and maintenance works on Villiers Road, Millbrook, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 5 Dec 2024 at 15:44.

Hampshire County Council logo
Between
11 and 20 Feb 2025
Details
View Map
Share
Follow
Lee Lane

Hampshire County Council are proposing to carry out Highway improvement works on Lee Lane, Lee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 12:47.

Hampshire County Council logo
Between
11 and 20 Feb 2025
Details
View Map
Share
Follow
Lee Lane

Hampshire County Council are proposing to carry out Highway improvement works on Lee Lane, Lee.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 28 Nov 2024 at 09:25.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
14 Feb and 18 Apr 2025
Details
View Map
Share
Southampton Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Southampton Road, Toothill.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 February 2025 and run through until 18 April 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 15:16.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Romsey Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Romsey Road, Lyndhurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 15:17.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Feb and 14 May 2025
Details
View Map
Share
Follow
Romsey Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Romsey Road, Lyndhurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Oct 2024 at 14:16.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Derby Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Derby Road, Bevois, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 15:56.

Network Rail logo
LONG TERM
Between
17 Feb and 10 Jul 2025
Details
View Map
Share
Follow
Priory Road

Network Rail are proposing to carry out Works for Rail Purposes on Priory Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jun 2024 at 11:49.

Southern Water logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Lordswood Road

Southern Water are proposing to carry out Utility repair and maintenance works on Lordswood Road, Bassett, Southampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 5 Dec 2024 at 12:28.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Rownhams Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Coxford, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 12:54.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Rownhams Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Coxford, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Oct 2024 at 11:24.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Rownhams Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Rownhams Lane, Coxford, Southampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Oct 2024 at 14:56.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Bakers Drove

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bakers Drove, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Oct 2024 at 10:16.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Bakers Drove

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bakers Drove, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Oct 2024 at 13:25.

Scottish Hydro Electric Power Dis logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Bakers Drove

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bakers Drove, Rownhams.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Oct 2024 at 14:19.

Southampton City Council logo
Between
3 and 30 Mar 2025
Details
View Map
Share
Follow
West Quay Road

Southampton City Council are proposing to carry out Highway improvement works on West Quay Road, Bargate, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 17 Dec 2024 at 11:53.

Southampton City Council logo
Between
3 and 30 Mar 2025
Details
View Map
Share
Follow
Portswood Road

Southampton City Council are proposing to carry out Highway improvement works on Portswood Road, Portswood, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 17 Dec 2024 at 11:52.

Southampton City Council logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Bassett Green Road

Southampton City Council are proposing to carry out Highway improvement works on Bassett Green Road, Bassett, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 19 Nov 2024 at 08:41.

Southampton City Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Bassett Green Road

Southampton City Council were proposing to carry out Highway repair and maintenance works on Bassett Green Road, Bassett, Southampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 10 Dec 2024 at 11:04.

Southampton City Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Bassett Green Road

Southampton City Council are proposing to carry out Highway improvement works on Bassett Green Road, Bassett, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southampton City Council on 10 Dec 2024 at 11:06.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
10 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Romsey Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Romsey Road, Nursling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Dec 2024 at 18:17.

Scottish Hydro Electric Power Dis logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Upper Shirley Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Upper Shirley Avenue, Shirley, Southampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Dec 2024 at 11:24.


Roadworks Map near to High Street, SOUTHAMPTON, SO40 9HN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 04:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to High Street, SOUTHAMPTON, SO40 9HN (13 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Scottish Hydro Electric Power Dis logo
URGENT
  
JUNCTION ROAD 
(0.1 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
12 Dec 2024 21:45 - 16 Dec 2024 11:00
0.1
Details
Share
2
Hampshire County Council logo
MAJOR
  
JUNCTION ROAD 
(0.2 miles)
Hampshire County Council
Highway repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 30 Oct 2024 - 10 Apr 2025)
0.2
Details
Share
3
Southern Water logo
COMMERCIAL ROAD 
(0.3 miles)
Southern Water
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.3
Details
Share
4
Hampshire County Council logo
SPICERS HILL 
(0.5 miles)
Hampshire County Council
Highway improvement works - Carriageway - Lane closure
In Progress
Since: 17 Dec 2024 07:33
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.5
Details
Share
Follow
5
Southern Water logo
URGENT
  
LACKFORD AVENUE 
(0.6 miles)
Southern Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
12 Dec 2024 12:54 - 13 Dec 2024 15:00
0.6
Details
Share
6
Southampton City Council logo
EMERGENCY
  
REDBRIDGE FLYOVER, REDBRIDGE 
(0.6 miles)
Southampton City Council
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 1 Jul 2024 20:15
(Scheduled: 1 Jul 2024 - 27 Dec 2024)
0.6
Details
Share
Follow
7
Hampshire County Council logo
WINDERMERE GARDENS 
(0.7 miles)
Hampshire County Council
Works for road purposes - Footway, Carriageway, Footpath - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 24 Dec 2024
0.7
Details
Share
Follow
8
Southampton City Council logo
MAJOR
  
REDBRIDGE ROUNDABOUT FOOTPATHS, REDBRIDGE 
(0.7 miles)
Southampton City Council
Highway improvement works - Verge - No carriageway incursion
In Progress
Since: 28 May 2024 00:00
(Scheduled: 28 May 2024 - 20 Dec 2024)
0.7
Details
Share
Follow
9
Hampshire County Council logo
RINGWOOD ROAD 
(0.7 miles)
Hampshire County Council
Highway repair and maintenance works - Verge - Give and take
Planned
Scheduled: 18 Dec 2024 - 19 Dec 2024
0.7
Details
Share
Follow
10
Southern Water logo
OAK CLOSE, REDBRIDGE 
(0.7 miles)
Southern Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 19 Dec 2024 - 23 Dec 2024
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.